• Title/Summary/Keyword: water removal efficiency

Search Result 1,741, Processing Time 0.028 seconds

The study of chemical treatment of pulp mill bleaching waste liquor using sea water (해수를 이용한 펄프공장 폐액의 화학적 처리에 관한 연구)

  • 정병곤;이헌모;윤종호
    • Journal of environmental and Sanitary engineering
    • /
    • v.12 no.1
    • /
    • pp.39-48
    • /
    • 1997
  • The study was conducted to know the possibility that the removal efficiency of organic and suspended solids(SS) could be increased by suppling of sea water and the optimum amount of sea water to be supplied treat bleaching waste water by lime coagulation settlement at pulp mill process. When the lime dosage was increased, the removal efficiency of COD and SS in the waste water was increased based on the removal efficiency of COD and SS. The lime dosage and removal efficiency was increased proportionally with the lime concentration of 4,000 mg/l, but the increase of removal efficiency was presented slightly above the 4,000mg/l. It was evaluated that the removal efficiencies of COD and SS could be increased and the requirement of lime dosage could be decreased by the sea water supplement. The removal efficiency of SS was most increased when the sea water supplement was 10% or more in the waste water. The removal efficiencies of COD was the best at 4% sea water excepting the dilution efficiency by sea water supplement.

  • PDF

A Study on Removal of Nitrogen at Sewage Treatment using Solar Energy (Solar Energy를 이용한 하수처리의 질소 제거에 관한 연구)

  • Hwang, Yong Ha
    • Journal of Institute of Convergence Technology
    • /
    • v.1 no.2
    • /
    • pp.37-42
    • /
    • 2011
  • The purpose of this research is to improve nitrogen removal efficiency in winter season through rise of water temperature of extraneous water by using solar energy which is estimated to have great potential among new regeneration energy and while operating Plug-Flow Reactor to improve nitrogen removal efficiency by selecting A/O process among sewage waste water treatment processes as the necessity of solving the problem of nitrogen removal efficiency according to reduced water temperature in winter season and strengthening of water quality criteria regarding discharged sewage waste water suggested in the research background. Summarizing the research result, supply of solar energy source improves the function outstandingly when removing nitrogen, (nitrogen removal rate before operating solar energy 55.4% ${\rightarrow}$ nitrogen removal rate after operating solar energy 84.1%).

  • PDF

Bisphenol-A Removal in Conventional Water Treatment Systems (정수처리공정에서 bisphenol-A의 제거에 관한 연구)

  • 김혜리;이윤진;박선구;남상호
    • Journal of Environmental Health Sciences
    • /
    • v.30 no.1
    • /
    • pp.59-64
    • /
    • 2004
  • This study was carried out to investigate influencing factors of bisphenol A(BPA) removal characteristic in conventional water treatment systems to be connected with coagulation, sedimentation, filtration and disinfection. The result are summarized as follows; In BPA removal, optimal doses of PAC, alum, ferric chloride were 7.5 mg Al/L, 10.0 mg AI/L, 15.0 mg Fek. PAC was most effective coagulant to remove BPA. In coagulation process, BPA removal efficiency were increased about 2% by adjusting pH of raw water as 6. At temperature rise 1$0^{\circ}C$, BPA removal efficiency were increased 0.94%. but BPA removal efficiency in sand filtration process were under 1 %ie, so that BPA was almost not removed. At free chlorine dose 1, 2 mg/L, the reaction rate constant k in the BPA removal have been calculated to be 0.397, 0.953 min$^{-1}$ . At free chlorine dose 1, 2 mg/1-, degradation reaction of BPA was completed during 10 min and BFA removal efficiencies were 97.66, 99.99% at this time.

Natural Radon Removal Efficiency of Small-scale Water Supply System (국내 마을상수도 지하수의 라돈 자연저감)

  • Cho, Byong-Wook;Yun, Uk;Choo, Chang-Oh
    • Economic and Environmental Geology
    • /
    • v.43 no.1
    • /
    • pp.33-42
    • /
    • 2010
  • The purpose of this study was to understand the degree of natural radon removal efficiency of small-scale water supply systems. Six sites were selected for this study, and data on well characteristics (depth, pumping rate, water tank capacity, distance from well to tap water) were obtained. Water samples both from raw water and three tap waters at each site were collected and analyzed for radon concentration. Average radon removal efficiency of the five sites (A-E) in Nov. 2006 was 26.0% while that of the same sites in Dec. 2006 was 45.6% indicating seasonal difference in natural radon removal efficiency. Meanwhile short-term (April 23, April 30, May 8, 2007) radon removal efficiency from the site F was 44.1-49.0%, implying only a little difference in natural radon removal efficiency. The degree of radon removal at tap water was influenced mainly by pumping rate rather than distance from the well and water tank capacity.

Evaluation of Applicability and Economical Efficiency of Peroxone Process for Removal of Micropollutants in Drinking Water Treatment (정수처리에서 미량유해물질 제거를 위한 Peroxone 공정의 적용성 및 경제성 평가)

  • Son, Hee-Jong;Kim, Sang-Goo;Yeom, Hoon-Sik;Choi, Jin-Taek
    • Journal of Environmental Science International
    • /
    • v.22 no.7
    • /
    • pp.905-913
    • /
    • 2013
  • We compared the applicability and economical efficiency of peroxone process with those of ozone process in the existing water treatment plant on downstream of Nakdong River. After comparing the peroxone process for removing geosmin with the ozone process in lab scale test, peroxone process showed much higher removal efficiency than the ozone process at the same ozone dosage. Proper range of $H_2O_2/O_3$ ratio were 0.5~1.0 and the half-life of geosmin was about 5.5~6.8 min when the $H_2O_2/O_3$ ratio was set to 0.5 during 1~2 mg/L of ozone dosage. Peroxone process could reduce the ozone dosage about 50 to maximum 30% for the same geosmin removal efficiency compared to the ozone process in the pilot scale test. In case of 1,4-dioxane treatment, peroxone process could have 3~4 times higher efficiency than ozone process at the same ozone dosage. The results of estimating the economical efficiency of ozone and peroxone process for treating geosmin and 1,4-dioxane by using pilot scale test, in case of the removal target was set to 85% for these two materials, the cost of peroxane process could be reduced about 1.5 times compared to ozone process, and in the same production cost peroxone process could have 2~3 times higher removal efficiency than ozone process. The removal efficiency by peroxone process showed a large difference depending on the physicochemical characteristics of target materials and raw water, therefore detailed examination should be carried out before appling peroxone process.

Temporal and Spacial Distributions of Water Quality and Evaluation of Pollutant Removal Efficiency in the Sihwa Constructed Wetland (시화호 인공습지에서 시공간적 수질분포 및 오염물질 제거효율 평가)

  • Choi, Don-Hyeok;Choi, Kwang-Soon;Kim, Dong-Sup;Kim, Sea-Won;Choi, Dong-Ho;Hwang, In-Seo;Lee, Yun-Kyoung;Kang, Ho
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.30 no.10
    • /
    • pp.1013-1020
    • /
    • 2008
  • To evaluate the pollutant removal efficiency and clarify the cause of low removal efficiency of the wetland, temporal and spacial distributions of water quality were investigated at 16 sites in the Sihwa constructed wetland. The removal efficiency showed a tendency to decrease since the construction of the wetland, except for TN. In addition, the efficiency was largely varied with season, especially BOD and TP. No removal efficiency of BOD was observed in April and July when algal bloom was occurred in lower part open water of the wetland. On the other hand, TP showed no removal efficiency from April to August showing -291% of removal efficiency in August. From the horizontal distribution in closed water regions, SS concentration for the central area was significantly higher than for left and right areas(p = 0.013, center > left > right areas). From the results of this study, we infer that anaerobic condition due to the excessive accumulation of organic matters and lack of uniformity of water flow distribution are major factors of the low removal efficiency of the wetland.

Heavy Metal Removal from Drinking Water using Bipolar Surface Modified Natural Mineral Adsorbents (천연광물의 양극성 표면개질을 이용한 상수원수 중 중금속제거 특성)

  • Kim, Nam-youl;Kim, Younghee
    • Journal of Environmental Health Sciences
    • /
    • v.45 no.6
    • /
    • pp.561-568
    • /
    • 2019
  • Objectives: The most commonly detected heavy metals in rocks and soils, including Pb, Cd, Cu, Fe, Mn and As, are representative pollutants discharged from abandoned mines and have been listed as potential sources of contamination in drinking water. This study focused on increasing the removal efficiency of heavy metals from drinking water resources by surface modification of natural adsorbents to reduce potential health risks. Methods: Iron oxide coating and graft polymerization with zeolites and talc was conducted for bipolar surface modification to increase the combining capacity of heavy metals for their removal from water. The removal efficiency of heavy metals was measured before and after the surface modification. Results: The removal efficiency of Pb, Cu, and Cd by surface modified zeolite showed 100, 92, and 61.5%, respectively, increases compared to 64, 64, and 38% for non-modified zeolite. This implies that bipolar surface modified natural adsorbents have a good potential use in heavy metal removal. The more interesting finding is the removal increase for As, which has both cation and anion characteristics showing 27% removal efficiency where as non-modified zeolite showed only 2% removal. Conclusions: Zeolite is one of the most widely used adsorptive materials in water treatment processes and bipolar surface modification of zeolite increases its applicability in the removal of heavy metals, especially As.

Development of Optimal Septic Tank in the Countries of Water Shortages (물 부족국가에서 활용가능한 정화조의 최적모형 개발)

  • Lim, Bong-Su;Jing, Hai-Long
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.4
    • /
    • pp.418-427
    • /
    • 2015
  • This study was carried out to evaluate the performance of a lab-scale novel septic tank system for improving the conventional septic tank in the developing countries of water shortages. The lab-scale novel septic tank system consists of sepetic tank, aeration tank with HBC-ring, and sand filter. Optimum HRT was reguired about 1.5days to get a total COD removal efficiency of 90%, COD, BOD and SS removal efficiency was about 70%, 60%, and 85% in sepetic tank only. The structure of sepetic tank with two stages results in the high removal efficiency of organic matter. When sepetic tank, aeration tank, and sand filter were more than HRT 1.5days, 18hrs, and 12hrs, respectively, final effluent was less than 20 mg/L of BOD, 14 mg/L of SS, so that there is a high potential of its use for reusing water in flush toilet. There is no significant effect of HRT change on nutrient removal. Total nitrogen removal efficiency was about 40%, final effluent was 30~40 mg/L of TN, total phosphorus removal efficiency was about 11~25%, final effluent was 9~12 mg/L of TP. Because there is very small amounts of organic nitrogen and phosphorus in effluent, it was possible to reuse water for agricultural use.

Assessment of Micro Organic Pollutants Removal Using Advanced Water Treatment Process and Nanofiltration Process (고도처리공정과 나노여과공정에서의 미량유해물질 제거 평가)

  • Kang, Joon-Seok;Choi, Yang-Hun;Kwon, Soon-Buhm;Yu, Young-Beom
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.8
    • /
    • pp.579-587
    • /
    • 2014
  • Various kinds of micro organic pollutants have frequently been detected from a water system. Therefore, it is considered to be very important part in the drinking water treatment system. And the research about removal process and processing efficiency have been being conducted briskly. In this study, the removal efficiency was evaluated using advanced water treatment process and nanofiltration process. The removal efficiency of nanofiltration process was very different according to physical and chemical characteristics of materials. The molecular weight of cutoff was the most influential factor in the removal efficiency. And when pKa value was higher than pH of raw water or Log Kow value was below 2, the removal efficiency of material was decreased. In case of oxidation reaction, the bigger the molecular weight of material was and the more hydrophobic a material was, the less oxidation reaction occurred. And the removal efficiency was decreased. Most unoxidized materials were removed by absorption. And the more actively oxidation reaction occurred by $H_2O_2$, the more absorption reaction increased.

Organophosphorus Insecticide Residues in Fruits and Vegetables (과실 채소중 잔류농약(유기인제)에 관한 연구)

  • 윤숙자
    • Journal of environmental and Sanitary engineering
    • /
    • v.5 no.1
    • /
    • pp.83-92
    • /
    • 1990
  • Adapting two step aeration system to a waste water treatment of W-paper manufactory as Full-Scale Plants, we drew a following conclusion from its practical working. 1. Because BOD removal efficiency was 20% in A-Stage, 90% in B-Stage and total removal efficiency was 97%. It worked treatment plant well and was suitable for effluent water standard as well. Because COD removal efficiency was 42% in A-stage, 71% in B-stage and the total removal efficiency was 94% COD control was possible in effluent water quality. 2. Treatment efficiency according to a load capacity was average 20% in 1.401 BOD kg/m3/d load of A-Stage and average 90% in 0.273 BOD kg/$\textrm {m}^3$ / d load of B-Stage. 3. Treatment efficiency according to a ratio of F/M was 2.657--5.024 kg BOD/kg MLSS/d in A-Stage and BOD removal efficiency was 16-261 in the same stage. The ratio of F/M was 0.068-0.094 kg BOD /kg MLSS/d and BOD removal efficiency ratio was 85-94%. Therefore treatment efficiency could be kept stably and volume of aeration tank could be reduced wholly. 4. Treatment efficiency according to MLSS appeared BOD 20%. COD 42%, in A-Stage and removal efficiency appeared BOD 90%, COD 71% in B-Stage. They were suitable for plan condition. 5. Because of working of complemented treatment plant by AB-Process. 20,000,000 Won a month was saved than the ordinary working cost. Therefore, it was assumed that invested cost could be recollected in 19 months or so consequently.

  • PDF