• 제목/요약/키워드: water diversion

검색결과 86건 처리시간 0.026초

Study on the Layout of Water Diversion Projects Influenced by China's Macro Developing Strategies

  • Peng, Xiang
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2008년도 학술발표회 논문집
    • /
    • pp.59-66
    • /
    • 2008
  • A country's macro developing strategies will greatly impose upon its water resources allocation. Based upon the relationship between national macro developing strategies and water diversion projects layout, the paper discusses the vital influence of water diversion projects caused by China's food security and sustainable development strategy implemented in recent years, and points out that it is an inevitable choice of constructing inter-basin water diversion projects in north China in view of local water resources can't meet the demand of socio-economic development and eco-environment protection, and then recommends China's water diversion projects layout in the current and future, which attaching most importance to the South-to-North Water Diversion Project.

  • PDF

금강-보령댐 도수터널 운영에 따른 금강 본류 내 수위 영향 분석 연구 (Impacts on Water Surface Level of the Geum River with the Diversion Tunnel Operation for Low Flow Augmentation of the Boryong Dam)

  • 장석환;오경두;오지환
    • 한국환경과학회지
    • /
    • 제26권9호
    • /
    • pp.1031-1043
    • /
    • 2017
  • Recently severe drought caused the water shortage around the western parts of Chungcheongnamdo province, South Korea. A Diversion tunnel from the Geum river to the Boryong dam, which is the water supply dam for these areas has been proposed to solve this problem. This study examined hydraulic impacts on the Geum river associated with the diversion plan assuming the severe drought condition of 2015 would persist for the simulation period of 2016. The hydraulic simulation model was verified using hydrologic and hydraulic data including hourly discharges of the Geum river and its 8 tributaries, fluctuation of tidal level at the mouth of the river, withdrawals and return flows and operation records of the Geum river barrage since Feb. 1, 2015 through May 31, 2015. For the upstream boundary condition of the Geum river predicted inflow series using the nonlinear regression equation for 2015 discharge data was used. In order to estimate the effects of uncertainty in inflow prediction to the results total four inflow series consisting of upper limit flow, expected flow, lower limit flow and instream flow were used to examine hydraulic impacts of the diversion plan. The simulation showed that in cases of upper limit and expected flows there would be no problem in taking water from the Geum river mouth with a minimum water surface level of EL(+) 1.44 m. Meanwhile, the simulation also showed that in cases of lower limit flow and instream flow there would be some problems not only in taking water for water supply from the mouth of the Geum river but also operating the diversion facility itself with minimum water surface levels of EL(+) 0.94, 0.72, 0.43, and 0.14 m for the lower limit flow without/with diversion and the instream flow without/with diversion, respectively.

유역외 보의 연계운영에 의한 유역배율이 작은 저수지의 유입량 확보 가능성 (Securing Inflows to Reservoir with Low Ratio of Watershed to Paddy Field Areas by Operating Outside Diversion Weir)

  • 노재경
    • 한국농공학회논문집
    • /
    • 제53권1호
    • /
    • pp.17-28
    • /
    • 2011
  • This study was performed to ascertain the possibility of securing inflows to reservoir with low ratio of watershed to paddy field areas by outside diversion weir. The case of Maengdong reservoir and Samryong diversion weir was selected. Most of inflows to Maengdong reservoir with watershed area of $7.06\;km^2$ and total storage capacity of $1,269{\times}10^4\;m^3$ are filled with intake water from outside Samryong diversion weir. Only using water storage data in Maengdong reservoir from 1991 to 2009, the range of water intake in Samryong diversion weir to Maengdong reservoir was optimized to 0.135~30 mm/d, from which water intake to Maengdong reservoir was $1,672.9{\times}10^4\;m^3$ (70.1 %) and downstream outflow to Weonnam reservoir was $714.4{\times}10^4\;m^3$ (29.9 %). The parameters of DAWAST model for reservoir inflow were determined to UMAX of 313.8 mm, LMAX 20.3 mm, FC 136.8 mm, CP 0.018, and CE 0.007. Inflows to Maengdong reservoir were $427.1{\times}10^4\;m^3$ (20.3 %) from inside watershed, and $1,672.9{\times}10^4\;m^3$ (79.7 %) from outside. Paddy irrigation water requirements were estimated to $1,549{\times}10^4\;m^3$ on annual average. Operation rule curve was drawn by using daily inflow and irrigation requirement data. By securing the amount of inflow to Maengdong reservoir to about 80 % from outside Samryong diversion weir, water supply capacity for irrigation of $1,549{\times}10^4\;m^3/yr$ was analyzed to be enough. Additional water supplies for instream flow were analyzed to $1,412\;m^3/d$ in normal reservoir operation, $36,000\;m^3/d$ in withdrawal limit operation by operation rule curve from October to March of non irrigation period.

금강호물의 새만금호 도입에 따른 금강호 수질변화 분석 (Estimation of Water Quality of Geumgang Lake by Diversion of Geumgang Lake Flow into Saemangeum Lake)

  • 엄명철;이재면
    • 한국물환경학회지
    • /
    • 제22권6호
    • /
    • pp.1045-1051
    • /
    • 2006
  • Geumgang canal is planned to connect Geumgang lake with Saemangeum lake to accelerate desalinization and dilute polluted water to improve water quality in Saemangeum lake. The purpose of this study is to evaluate the impact of water quality on Geumgang lake by diversion of its lake flow to Saemangeum lake. WASP5 model was used to estimate water quality of Geumgang lake. Model calibration and verification were done for water quality data for 2001 and 2002. Water quality concentrations in Geumgang lake were simulated for 4 scenarios, which were considered whether the Geumgang canal is built or not. As a result of simulations, there was little impact on water quality in Geumgang lake, though a little of the Geumgang lake flow diverted to Saemangeum lake. As the Geumgang canal is planned to divert the Geumgang water flow which were discharged into the sea through sluice gates when canal is not built, it is thought that there will be little change by diversion of water flow.

저수지 시스템과 연계된 펌핑 시스템의 최적 운영 (Optimal Operation of Pumping System Connected with Reservoir Systems)

  • 이광만;이우석;유양수
    • 한국수자원학회논문집
    • /
    • 제30권2호
    • /
    • pp.107-118
    • /
    • 1997
  • 한국수자원공사가 수행한 중국 산서성 태원시 용수공급원인 분하강 상류 저수지 시스템은 매우 복잡하다. 이곳 저수지 시스템은 여러개의 저수지가 직렬로 연결될 계획이며, 운영에서도 여러 가지 목적이나 평가항목을 고려하는 다목적, 다기준 시스템이 될 것이다. 이 시스템에서 주요 저수지 운영목적은 용수부족과 저수지 퇴사량 최소화이나 황하도수사업이라는 대규모 펌핑 시스템과 연계 운영이 필요하다. 황하도수계획에서의 용수개발비는 저수지를 통한 개발비 보다 비싼 편이며, 2020년경의 필요 도수량은 자체 유역으로부터 지표수 공급량의 두배에 이를 것으로 전망된다. 본 연구에서는 분하 상류 저수지 시스템과 황하도수 시스템의 연계 운영문제를 해결하기 위하여 펌핑-저수지 시스템 최적화 모형을 개발하였다. 연구내용은 황하도수계획과 저수지 시스템의 연계 가능성을 입증하고 황하도수계획을 하나의 저수지화하여 실제 저수지 시스템과 연계하는 방법을 제시하고 있다. 또한 개발된 모형을 이용하여 여러 가지 기존의 저수지 운영목적을 만족시키면서 황하도수량 최소화에 대한 실제 적용 예를 제시하고 있다.

  • PDF

Analysis of Sediment Reduction with VFS and Diversion Channel with Enhancements in SWAT Landuse-Subbasin Overland Flow and VFS Modules

  • Park, Youn-Shik;Kim, Jong-Gun;Kim, Nam-Won;Engel, Bernie;Lim, Kyoung-Jae
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2009년도 학술발표회 초록집
    • /
    • pp.752-757
    • /
    • 2009
  • In the last decade, many methods such as greet chamber, reservoir, or debris barrier, have been utilized to manage and prevent muddy water problem. The Vegetative Filter Strip (VFS) has been thought to be one of the most effective methods to trap sediment effectively. The VFS are usually installed at the edge of agricultural areas adjacent to stream or drainage ditches, and it has been shown that the VFS effectively removes pollutants transported with upland runoff. But, if the VFS is installed without any scientific analysis of rainfall-runoff characteristics, soil erosion, and sediment analysis, it may not reduce the sediment as much as expected. Although Soil and Water Assessment Tool (SWAT) model has been used worldwide for many hydrologic and Non-Point Source Pollution (NPSP) analysis at a watershed scale. but it has many limitations in simulating the VFS. Because it considers only 'filter strip width' when the model estimates sediment trapping efficiency, and does not consider the routing of sediment with overland flow option which is expected to maximize the sediment trapping efficiency from upper agricultural subbasin to lower spatially-explicit filter strip. Therefore, the SWAT overland flow option between landuse-subbasins with sediment routing capability was enhanced with modifications in SWAT watershed configuration and SWAT engine. The enhanced SWAT can simulate the sediment trapping efficiency of the VFS in the similar way as the desktop VFSMOD-w system does. Also it now can simulate the effects of overland flow from upper subbasin to reflect the increased runoff volume at the receiving subbasin, which is what is occurring at the field if no diversion channel is installed. In this study, the enhanced SWAT model was applied to small watershed located at Jaun-ri in South Korea to simulate diversion channel and spatially-explicit VFS. It was found that approximately sediment can be reduced by 31%, 65%, 68%, with diversion channel, the VFS, and the VFS with diversion channel, respectively.

  • PDF

어류 차단 스크린 설치에 따른 안동-임하호 연결터널 내 흐름변화에 대한 전산유체동역학 수치모의 (Computational Fluid Dynamics Simulation of Flow Pattern Change in the Andong-Imha Reservoir Connecting Tunnel Due to Fish Exclusion Screens)

  • 안상도
    • 한국물환경학회지
    • /
    • 제30권5호
    • /
    • pp.477-485
    • /
    • 2014
  • Imha Reservoir is connected to Andong Reservoir via a diversion tunnel allowing water to pass between. The diversion tunnel is equipped with screens to exclude exotic largemouth bass due to their predatory impacts on prey assemblages resulting in a degradation of species richness of local fish fauna and extinction of local fish populations in Korea. Flow pattern changes resulting from the fish screens and trash racks were investigated using a computational fluid dynamics (CFD) model. Numerical simulations showed that the decrease in the discharge capacity of the tunnel is approximately 8.6% and the headloss coefficient for fish screen at Andong intake tower was determined to be 1.5. In order not to allow the small fishes enough to pass through the wire openings enter into Imha Reservoir through tunnel, the velocity in the tunnel should be greater than 1.48 m/s which is a critical ascending velocity of the bass. This study suggests that it can keep the velocity higher enough to exclude largemouth bass when a gate opens with the condition of 1.0m difference in water stage between two reservoirs.