• 제목/요약/키워드: wastewater sludge

검색결과 1,086건 처리시간 0.021초

UASB 공정에 의한 당밀폐수의 최적처리 방안 (Optimal Treatment of Molasses Wastewater Using UASB Process)

  • 허관용;정의근;정윤진;유상근
    • 상하수도학회지
    • /
    • 제11권2호
    • /
    • pp.112-127
    • /
    • 1997
  • The purpose of this study is to get optimum operating factors of Upflow Anaerobic Sludge Blanket (UASB) reactor by introducing methods that make it to reduce inhibition possible in each process wastewater treatment. The used substrates, concentrated corn starch liquid (CSL) wastewater, modified starch, filtering and decoloring wastewater, ion refining wastewater, and mixed wastewater including modified starch and not including modified starch, are generated from molasses process. The seeding sludge is the digested sludge that had been applied to molasses wastewater. Batch test to reduce the inhibition factors that might be existed in each wastewater was examined. Based on the this test, the optimum operating factors according to alkalinity and pH variation was studied through the continuous test using three 5.5 L UASB reactor. The first reactor added $NaHCO_3$ to control alkalinity. The hydraulic retention time (HRT) reduced to 8 hours and the organic loading rate increased gradually. The second reactor changed the pH of influent from 7.0 to 6.0 using NaOH. The third reactor was operated without changes to compare the above two reactors. As the result, the inhibition in concentrated CSL wastewater was removed by adding iron (II). When trace metals were added to mixed wastewater not including modified starch, the digestability by gas production rate increased to more fifty percentage than mixed wastewater that was not adding the trace metals. The reason that the inhibition did not decreased in spite of adding trace metals and nutrients was influenced by high concentration generated during the acid fermentation. The UASB reactors using the mixed wastewater with the most effective performance were operated as 500 mg/L as $CaCO_3$ alkalinity and 6.0 pH at steady state, and at this time, the gas production rates were 283 and 311mL gas/g $COD_{added}$. The COD removal rates were 84.7 and 86.3%, respectively.

  • PDF

호수내의 인 제거에 관한 연구 (A Study on the Removal of Phosphorus in the Lake)

  • 강선홍;김경태
    • 상하수도학회지
    • /
    • 제12권2호
    • /
    • pp.59-66
    • /
    • 1998
  • The feasibility of usage of sludge from water treatment plant and chalk from schools and institutes was investigated to remove the phosphorus in the lakes which induce the eutrophication every year. In this study phosphorus removal efficiencies of sludge and chalk were investigated by changing various factors. Higher phosphorus removal efficiency using larger particle size of chalk was observed which means that the surface area is not an important factor in removing phosphorus in aqueous phase. The proper shaking time and temperature were 2 hours and $25^{\circ}C$, respectively. The removal efficiency using sludge from water treatment plant was almost 100%, which is similar to those of CaO and $Ca(OH)_2$. It means that sludge can be reused in removing phosphorus. It was also found that chalk was better in removing phosphorus under alkaline condition and sludge was better under acidic condition. About 75% phosphorus removal efficiency was observed using sludge from the water sample in Lake Sihwa.

  • PDF

정수장에서 발생된 탈수슬러지의 량에 의한 배출수처리시설용량에 대한 평가 (Estimation on the Design Capacities of Residuals Treatment Facilities by the Quantity of Dewatered Sludge Generated from Water Treatment Plants)

  • 문용택
    • 상하수도학회지
    • /
    • 제18권6호
    • /
    • pp.715-723
    • /
    • 2004
  • The quantity of residuals generated from water treatment plants depends upon the raw water quality, dosage of chemicals used, performance of the treatment process, method of sludge removal, efficiency of sedimentation, and backwashing frequency. Sludge production by the physical separation of SS occurs under quiescent conditions in the primary clarifier, where suspended solids are allowed to settle and to consolidate on the clarifier bottom. Raw primary sludge results when the settled solids are hydraulically removed from the tank. The relative solid and liquid fractions of a slurry are most commonly described by the solids concentration, expressed as mg/L or percent solids. The purpose of the present investigation is to estimate a suitability on the design capacities of residuals treatment facilities by the quantity of dewatered sludge generated from water treatment plants.

CFD를 이용한 농축조 슬러지의 유출흐름특성 해석 (Analysis of the sludge thickening characteristics in the thickener using CFD Model)

  • 박노석;문용택;김병군;김홍석
    • 상하수도학회지
    • /
    • 제25권5호
    • /
    • pp.777-782
    • /
    • 2011
  • The residual treatment facilities in WTP(water treatment plant) play an important role in solid-liquid separation. At present, it is difficult to solve problems related with thickening and dewatering of WTP sludge, and discharging waste water to river. The quantity of residuals generated from water treatment plants depends upon the raw water quality, dosage of chemicals used, performance of the treatment process, method of sludge removal, efficiency of sedimentation, and backwashing frequency. Sludge production by the physical separation of SS(Suspended Solid) occurs under quiescent conditions in the primary clarifier, where SSs are allowed to settle and to consolidate on the clarifier bottom. Raw primary sludge results when the settled solids are hydraulically removed from the tank. In this study, Drawing characteristics of the sludge thickening in the thickener of Water Treatment Plants was simulated by Using CFD(Computational Fluid Dynamics.

USB 공법에 의한 $NO_3^--N$ 함유 폐수처리 (Treatment of wastewater containing nitrate using upflow sludge blanket process)

  • 김형석;은종극;박승조
    • 한국환경과학회지
    • /
    • 제4권3호
    • /
    • pp.87-87
    • /
    • 1995
  • This study was investigated with denitrification of wastewater containing nitrate using upflow sludge blanket process. Contents of this study were the nitrogen gas Production, relationship between HRT and COD/$NO_3^--N$ ratio in case of various hydrogen donor addition, relationship between nitrate loading rate and various hydrogen donor addition.

USB 공법에 의한 $NO_3^--N$ 함유 폐수처리 (Treatment of wastewater containing nitrate using upflow sludge blanket process)

  • 김형석;은종극;박승조
    • 한국환경과학회지
    • /
    • 제4권3호
    • /
    • pp.239-247
    • /
    • 1995
  • This study was investigated with denitrification of wastewater containing nitrate using upflow sludge blanket process. Contents of this study were the nitrogen gas Production, relationship between HRT and COD/$NO_3^--N$ ratio in case of various hydrogen donor addition, relationship between nitrate loading rate and various hydrogen donor addition.

  • PDF

각종 수소공여체의 첨가에 의한 $NO_3^--N$ 함유 폐수의 탈질 (Denitrification of the wastewater containing nitrate by various hydrogen donor addition)

  • 김형석;은종극;박승조
    • 한국환경과학회지
    • /
    • 제4권3호
    • /
    • pp.229-237
    • /
    • 1995
  • This study was investigated with denitrification of wastewater containing nitrate using upflow sludge blanket process. Contents of this study were the NO3--N removal efficiency by various hydrogen donor addition, determination of optimum COD/$NO_3^--N$ ratio and characteristics of granular sludge.

  • PDF

각종 수소공여체의 첨가에 의한 $NO_3^--N$ 함유 폐수의 탈질 (Denitrification of the wastewater containing nitrate by various hydrogen donor addition)

  • 김형석;은종극;박승조
    • 한국환경과학회지
    • /
    • 제4권3호
    • /
    • pp.77-77
    • /
    • 1995
  • This study was investigated with denitrification of wastewater containing nitrate using upflow sludge blanket process. Contents of this study were the NO3--N removal efficiency by various hydrogen donor addition, determination of optimum COD/$NO_3^--N$ ratio and characteristics of granular sludge.

슬러지 탄소원을 주입한 UNR공정의 동절기 질소, 인 처리효율 (The Nitrogen and Phosphorus Removal of UNR Process Using Sludge Carbon Source)

  • 김영규;김인배
    • 한국환경보건학회지
    • /
    • 제28권1호
    • /
    • pp.93-97
    • /
    • 2002
  • The aim of this study was to evaluate on the removal effect of total nitrogen and phosphorus with municipal wastewater in ultrasonic nutrient removal (UNR) process using ultrasonic sludge carbon source. The removal efficiency for total nitrogen was 44.2% at biological nutrient removal (BNR) process, 50.8% at UNR process. The removal efficiency for total phosphorus was 45.6% at BNR process, 46.2% at UNR process. The removal of nitrogen was effectively influenced by ultrasonic sludge carbon source.

화학적 처리에 의한 1차 하수처리장의 처리효과 개선 -현장시험을 중심으로- (Chemically Enhanced Primary Treatment at D Wastewater Treatment Plant)

  • 곽종운;김승현;이찬원
    • 상하수도학회지
    • /
    • 제11권1호
    • /
    • pp.99-108
    • /
    • 1997
  • This study examined the feasbility of upgrading D waste water treatment plant which treats incoming wastewater by primary sedimentation only. By adding 20-40 ppm of Hi-PAX into the outlet of the aerated grit chamber, BOD and SS removal efficiences were improved from 29% and 36% to 53 % and 73%,respectively. However, chemically enhanced primary treatment failed to meet the upcoming wastewater quality standard(BOD and SS <20 mg/l) consistently. This was suspected to result from the deteriorated plant return stream. The wastewater treatment by chemical treatment should have increased the amount of the sludge to be removed as the sludge production was increased. Chemically enhanced primary treatment is anticipated to consistently produce effluent of the 1996 standards quality by adjusting the amount of the sludge to be removed. Besides BOD and SS removal, chemically enhanced primary treatment resulted in the improved T-P removal from 30% to 64-74%. However, such benefit was not observed in T-N removal. Improved T-P removal will be expected to help control water pollution in Masan bay.

  • PDF