• Title/Summary/Keyword: wall displacement

Search Result 791, Processing Time 0.026 seconds

A CASE REPORT OF A DENTIGEROUS CYST TREATED BY MARSUPIALIZATION (조대술을 이용한 함치성 낭종의 치험례)

  • Jun, Eun-Min;Kim, Tae-Wan;Kim, Hyun-Jung;Nam, Soon-Hyeun;Kim, Young-Jin
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.34 no.3
    • /
    • pp.473-480
    • /
    • 2007
  • The dentigerous cyst originates through alteration of stellate reticulum after amelogenesis has completed, with accumulation of fluid between the layers of the reduced enamel epithelium or between this epithelium and the tooth crown. Its incidence is relatively high on 10s or 20s of age and it is always related to the unerupted crown. Generally, it has no symptom, however, if the cyst is large or accompanied with pus formation, swelling and pain may occur. In radiographic findings, it shows impacted crown surrounded by well defined unilocular radiolucent lesion and occasionally displacement of adjacent teeth or root resorption. The goal of treatment is complete elimination of abnormal tissue preserving the tooth involved in the cyst. Enucleation and marsupialization are commonly used for the treatment. Marsupialization is the procedure which removes the partial portion of the cystic wall and connects with the oral mucosa. As the pressure in the cyst decreases, bone regeneration takes place in the defect area and cystic wall converts into normal mucosa. This procedure, however, is the most conservative procedure which allows the protection of adjacent important structures. If the eruption space is sufficient, then inducing the eruption of the permanent tooth in the cyst is also possible. In following cases, dentigerous cyst was diaganosed after clinical and radiographic examination. Marsupialazation was done to remove the cyst and induce the tooth, which was in the cyst, to erupt into the oral cavity.

  • PDF

Effect of the Member Joint on Structural Performance of an Arch-type Multi-span Greenhouse: A Full-scale Experimental and Numerical Study (부재 접합부가 아치형 연동온실의 구조 성능에 미치는 영향: 실대형 실험적 및 해석적 연구)

  • Choi, Man-kwon;Ryu, Hee-ryong;Cho, Myeong-whan;Yu, In-ho
    • Journal of Bio-Environment Control
    • /
    • v.26 no.4
    • /
    • pp.402-410
    • /
    • 2017
  • The effect of the steel pipe member joint on the design performance of a plastic multi-span greenhouse was analysed through the comparing full-scale experiment and numerical analysis. The design performance of the greenhouse is generally evaluated through numerical analysis, but it is rare to consider the characteristics of the connections or joints of the members. In this study, the effect of the column-gutter beam-rafter-wind break wall joint on the design performance of the whole structure of a plastic multi-span greenhouse was analysed. The numerical results with assuming that the member joint are rigid condition were compared with the full-scale load test results using member joints used in the field. The stiffness of the entire structure was compared using the load-displacement relationship and the change of the load sharing ratio that the main members such as column, rafters, and wind break wall was analysed. The results of the load test were about 40% larger than the numerical result and the member stress was more than twice as large as those of the loaded columns. In order to increase the reliability of the design performance of the greenhouse, it is necessary to develop a numerical analysis model which can consider the characteristics of various joints.

Numerical Analysis of the Effects of Stress Anisotropy and Tunnel Excavation Shape on Initial Elastic-wall Displacement (지반응력의 비등방성에 따른 터널측벽의 초기탄성변위 특성에 대한 수치해석적 연구)

  • 김상환;정혁일
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.6
    • /
    • pp.33-42
    • /
    • 2002
  • Ground reaction curve is a very important information for evaluating the side wall displacements and installation time of the tunnle support. The ground reaction curve can be estimated by analytical closed form solutions derived on the supposition of circular section and isotropic stress condition. The conditions of stress field and tunnel configurations, however, are quite different in practice. Therefore, it is necessary to investigate the effects of stress anisotropy and tunnel configurations in order to use simply in practical design. This paper describes a study of influence factors in the ground reaction curve. In order to evaluate the applicability of analytical closed form solution in practical design, two sets of parametric studies were carried out by numerical analysis in elastic tunnel behaviour: one set of studies investigated the influence of the K and the other set investigated the influence of the tunnel configurations such as circular and horse-shoe shape. In the studies, K value varies between 0.5 and 3.0, initial ground vertical stress varies between 5~30MPa far each K values. The results indicated that the self-supportability of ground is larger in the ground having lower K value. However, it is suggested that the applicability of closed form solution may not be adequate to determine directly the installation time of the support and self-supportability of ground. It is necessary to consider stress anisotropy and tunnel configurations.

The Numerical Analysis on the Behaviour of Combined Sheet Pile in the Reclaimed Ground Mixed by Sandy Soil and Clayey Soil (사질토와 점성토가 혼재하는 해안 매립지반에서 조합형 Sheet Pile의 거동에 관한 해석적 연구)

  • Kim, Byung-Il;Kim, Young-Sun;Han, Sang-Jae;Park, Eon-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.3
    • /
    • pp.9-21
    • /
    • 2020
  • In this study, the design method of the combined sheet pile was considered in the coastal landfill where sandy and clayey soils are mixed, and the behavior in excavation was analyzed. It was confirmed from the elasto-plastic analysis that the predicted behavior of the temporary facilities of earth retaining differs according to the type of the combined sheet pile method (Built up, Interlocking, Welding) and the analysis method (soldier pile method, continuous wall method). In the case of sheet pile member force, the results of the continuous wall analysis method predicted the most conservative results. When the stress ratio (calculation/allowance) of each member was analyzed based on the maximum member force of the combined sheet pile method, the maximum value was obtained for bending moment in the side pile and combined stress in the case of the strut. As a result of finite element analysis, the member force of the side pile was the largest in the short-term effective stress analysis condition, while the compressive force of the strut was large in the consolidation analysis. When comparing the results of the elasto-plastic analysis and the finite element analysis, the shear force of the side pile and the axial force of the strut were greatly evaluated in the elasto-plastic analysis, and the bending moment of the side pile was the largest in the short-term effective stress condition of the finite element analysis. In addition, the displacement of the side pile was predicted to be greater in the finite element analysis than in the elasto-plastic analysis.

Effect of Aspect Ratio and Diagonal Reinforcement on Shear Performance of Concrete Coupling Beams Reinforced with High-Strength Steel Bars (세장비 및 대각철근 유무에 따른 고강도 철근보강 콘크리트 연결보의 전단성능)

  • Kim, Sun-Woo;Jang, Seok-Joon;Yun, Hyun-Do;Seo, Soo-Yeon;Chun, Young-Soo
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.1
    • /
    • pp.43-51
    • /
    • 2017
  • As per current seismic design codes, diagonally reinforced coupling beams are restricted to coupling beams having aspect ratio below 4. However, a grouped diagonally reinforcement detail makes distribution of steel bars in the beam much harder, furthermore it may result in poor construction quality. This paper describes the experimental results of concrete coupling beam reinforced with high-strength steel bars (SD500 & SD600 grades). In order to improve workability for fabricating coupling beams, a headed large diameter steel bar was used in this study. Two full-scale coupling beams were fabricated and tested with variables of reinforcement details and aspect ratio. To reflect real behavior characteristic of the beam coupling shear walls, a rigid steel frame system with linked joints was set on the reaction floor. As a test result, it was noted that cracking and yielding of reinforcement were initially progressed at the coupling beam-to-shear wall joint, and were progressed to the mid-span of the coupling beam, based on the steel strain and failure modes. It was found that the coupling beams have sufficient deformation capacity for drift ratio of shear wall corresponding to the design displacement in FEMA 450-1. In this study, the headed horizontal steel bar was also efficient for coupling beams to exhibit shear performance required by seismic design codes. For detailed design for coupling beam reinforced with high-strength steel, however, research about the effect of variable aspect ratios on the structural behavior of coupling beam is suggested.

Cystopexy to Treat Urinary Incontinence Due to Urethral Sphincter Mechanism Incompetence in a Male Dog (수컷 개에서 발생한 요도 조임근 기능 부전에 의한 배뇨실금의 방광 고정술을 이용한 외과적 치료 증례)

  • Yoon, Hun-Young;Shin, Dong-Wook;Jeong, Soon-Wuk
    • Journal of Veterinary Clinics
    • /
    • v.31 no.6
    • /
    • pp.515-518
    • /
    • 2014
  • A castrated male Yorkshire Terrier dog was presented for urinary incontinence and constipation. On physical examination, the dog showed difficult urination. There were no neurological abnormalities and no bacterial detection on urinalysis. Rectal examination revealed a regular, normal-sized prostate. Urethral catheterization was performed easily. Excretory urography and retrograde positive contrast urethrocystography showed displacement of the urinary bladder to the intrapelvic region. There was no evidence of an ectopic ureter. A tentative diagnosis of urethral sphincter mechanism incompetence accompanied with a pelvic bladder was made. Cystopexy was decided to place the urinary bladder to its normal position. The neck of the urinary bladder was anchored to the body wall and prepubic tendon using mattress sutures. Additional sutures were placed to appose the lateral part of the urinary bladder and abdominal wall. A simple interrupted suture was placed to tack the apex of the urinary bladder on the abdominal incision line. A urinary catheter was placed in the urinary bladder to provide post-operative evacuation. The catheter was removed when the dog was able to urinate with minimal straining at 3 days post-operatively. The owner reported that the dogs showed normal urination without straining at 3 days after the catheter was removed. Excretory urography revealed that the urinary bladder was located on its normal position at 2 months post-operatively. Subsequent communication with the owner by telephone revealed that the dog was in good urination at 3 years 11 months post-operatively.

A Study on the Dynamic Lateral Displacements of Caisson Quay Walls in Moderate Earthquake Regions (중진지역에서 케이슨 안벽의 동적수평변위 특성에 관한 연구)

  • Park, Keun-Bo;Sim, Jae-Uk;Cha, Seung-Hun;Kim, Soo-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.8
    • /
    • pp.137-148
    • /
    • 2008
  • In this study, 28 earthquake records with magnitudes from 5.3 to 7.9 are selected for dynamic analysis in order to assess applicability of the earthquakes for domestic seismic design. The assessment is performed using the seismic spectrum analysis of energy and acceleration. Based on results of the analysis, four acceleration time histories, which satisfy the Korean design standard response spectrum, are proposed. From the dynamic analysis using earthquake magnitudes from 6.4 to 7.9, it is found that horizontal displacements corresponding to earthquake magnitudes greater than 7 are two times larger than those with magnitude 6.5. Therefore, it can be stated that use of strong earthquakes, such as Miyagiken-ken-oki earthquake (Ofunato, $M_{JMA}=7.4$) and Tokachi-oki earthquake (Hachinohe, $M_{JMA}=7.9$), for the seismic design in Korea is not applicable, and may prove to be excessively conservative due to overestimated seismic force. From the dynamic analyses using the proposed acceleration time histories, effects of caisson quay wall dimension and the subsoil condition are investigated as well. The simplified design charts to evaluate horizontal displacements of caisson quay wall are also proposed based on earthquake magnitude 6.5 that is appropriate in Korea.

Analysis of Hydro-Mechanical Coupling Behavior Considering Excavation Damaged Zone in HLW Repository (고준위방사성폐기물 처분장에서의 굴착손상대를 고려한 수리-역학적 복합거동 해석)

  • Jeewon Lee;Minju Kim;Sangki Kwon
    • Explosives and Blasting
    • /
    • v.41 no.3
    • /
    • pp.38-61
    • /
    • 2023
  • An Excavation Damaged Zone(EDZ) caused by blasting impact changes rock properties, in situ stress distribution, etc., and its effects are noticeable at around a radioactive waste repository located at deep underground. In particular, the increase in permeability due to the formation of cracks may significantly increase the amount of groundwater inflow and the possibility of radioactive nuclide outflow. In this study, FLAC2D and FLAC3D were used to analyze the mechanical and thermal behaviors for three categories: a)No EDZ, b)Uniform EDZ, and c)Random EDZ. It was found that the tunnel displacement in the Random EDZ case was 423% higher than that in the No EDZ case and was 16% higher than that in the Uniform EDZ case. Tunnel inflow in the Random EDZ was also 17.3% and 10.8% higher than that in the No EDZ and the Uniform EDZ case, respectively. The permeability around the tunnel was increased by up to 10 times in the corner of the tunnel wall and roof due to the stress redistribution after excavation. From the computer simulation, it was found that the permeability around the tunnel wall was partially increased but the overall tunnel inflow was decreased with increase of stress ratio. Mechanical analysis using FLAC 3D showed similar results. Slight difference between 2D and 3D could be explained with the development of plastic zone during the advance of tunnel excavation in 3D.

Numerical Analysis of the Stability of a High-Strength Joint Buried Pile Retaining Wall Method (수치해석을 이용한 고강도 결합 매입말뚝 흙막이 공법의 안정성 검토에 관한 연구)

  • Hyeok Seo;Yeongpan Ha;Junyoung Choi;Kyungho Park;Daehyeon Kim
    • The Journal of Engineering Geology
    • /
    • v.34 no.2
    • /
    • pp.249-262
    • /
    • 2024
  • Retaining walls are widely used in the construction of underground structures. This study reviews the stability of the high-strength joint buried pile method at a site in Korea. [Consider giving details of the location.] The method is assessed by considering the amount of ground settlement, as calculated by finite element analysis and measured at the site. Comparison of the measured and numerical results confirmed the method's stability and field applicability. Settlement of 13.42~13.65 mm was calculated for seven cross-sections [The Abstract should be comprehensible without reference to the main text. The labels A-A' to G-G' should not be introduced here without explanation.] using numerical analysis, and the measured settlement reached a maximum of 2.00 mm. The observed differences and variations [Please state what differed/varied.] did not exceed the design expectations in any section. Instruments installed at the back of the excavation area were used to assess the conditions. An underground gradient meter recorded a cumulative horizontal displacement of between -0.40 and 0.60 mm, and an underground water meter recorded slight displacements of between -0.21 and 0.28 m compared with the initial measurements. A surface settlement meter observed very little movement, with a maximum of -2.00 mm compared with the initial measurement, thereby confirming the establishment of a stable state within the management criteria.

Characteristics of Subsurface Movement and Safety of the Songsanri Tomb Site of the Baekje Dynasty using Tiltmeter System (경사도변화 계측을 통한 백제 송산리 고분군의 지하 벽체거동특성과 안정성)

  • 서만철;박은주
    • The Journal of Engineering Geology
    • /
    • v.7 no.3
    • /
    • pp.191-205
    • /
    • 1997
  • Measurements on subsurface movement of the Songsanri tomb site including the Muryong royal tomb was conducted using a tiltmeter system for the period of 15 months form July 7, 1996 to September 30, 1997. Two coordinate tilt monitoring data shows the biggest movement rate of 2.3mm/m/yr toward south in the frontal wall(N-S tilt) of the Muryong royal tomb. Southward tilting of bricks above the southern fire place in the western wall of the Muryong royal tomb is a proof of southward tilting of the royal tomb since its excavation in 1971. The eastern wall of the Muryong royal tomb is also tilting toward inside the tomb with the rate of 1.523mm/m/yr. Furthermore, tilting rate of wall increases twice in rainy season. It is interpreted tbat infiltration of water into the tomb and nearby ground in rainy season results in dangerous status for the safety of tomb structure. On the whole, normal component tilting of the walls of the 5th tomb is large than its shear component. It shows a small displacement toward one direction without no abrupt change in its direction and amount of tilting. The tilting rate of walls of the 6th tomb is about 8.8mm/m/yr in the dry season which is much bigger than those of other tombs in rainy season. Deformation events of walls of the tombs are closely related to amount of precipitation and variation of temperature. In comparison with different weather conditions, tilting is much bigger during the period of rainy weather than sunny weather. It is interpreted that rainwater flew into the turm through faults and nearby ground. High water content in nearby ground resulted strength of ground. The tilting event of walls shows a hysterisis phenomenon in analysis of temperature effect on tilting event. The walls tilt rapidly with steep rising of temperature, but the tilted walls do not come back to original position with temperature falling. Therefore, a factor of steep increase of the temperature must be removed. It means the tomb have to be kept with constant temperature. The observation of groundwater level using three boreholes located in construction site and original ground represented that groundwater level in construction site is higher than that of original ground during the rainy season from the end of June to August. It means that the drainage system of the Muryong royal tomb is worse than original ground, and it is interpreted that the poor drainage system is related to safety of tomb structure. As above mentioned, it is interpreted that artificial changes of the tomb environment since the excavation, infiltration of rainwater and groundwater into the tomb site and poor drainage system had resulted in dangerous situation for the tomb structure. According to the result of the long period observation for the tomb site, it is interpreted that protection of the tomb site from high water content should be carried out at first, and the rise of temperature by means of the dehumidifier inside the tomb must be removed.

  • PDF