Review about test method for the full-insulation verification of circuit breaker rated on 800kV, 50kA (800kV, 50kA 차단기의 전절연 검증을 위한 시험방법 검토)

  • Park, Seung-Jae;Suh, Yoon-Taek;Yoon, Hack-Dong;Kim, Yong-Sik;Kim, Maeng-Hyun;Koh, Heui-Seog
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.569-571
    • /
    • 2005
  • In case of dead-tank circuit breaker with the earthed enclosure, the dielectric performance for phase to ground should be verified under the hot-gas condition produced by the current interruption. This test condition is required in breaking test duties with the rated short-circuit current and rated voltage. And, KERI has completed the reinforcement of the synthetic testing facilities and these facilities have the testing capacity which enables the full-pole testing for 800kV circuit breaker by adopting the series voltage injection method. So, this paper introduced the test circuit and procedures about the full-pole and the multi-part testing method which was devised to estimate the full -insulation of phase-to-ground for the multi-pole and dead-tank circuit breaker.

  • PDF

Review for verification of capacitive current performance by using synthetic testing method (합성시험법을 이용한 진상소전류 성능검증에 관한 고찰)

  • Park, Seung-Jae;Kim, Yong-Sik;Park, Yong-Hwan;Kim, Maeng-Hyun;Koh, Heui-Seog
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.466-467
    • /
    • 2006
  • Several synthetic testing methods have widely been used for the performance evaluation of ultra high-voltage circuit breaker. Among these synthetic method, in the paper, capacitance switching testing method which can meet the test requirements and increase the testing capacity has been proposed. This method is made up of two separated sources of short-circuit generator for current source and L-C resonance circuit for voltage source. By using this method, KERI will perform the performance evaluation of capacitive current switching performance for the 800kV GCB(Gas Circuit Breaker).

  • PDF

Fabrication of superconducting Joints Between PIT Processed BSCCO 2223 Tapes by Single and Multiple Press & reaction Annealing (고온초전도 BSCCO 2223 선재간의 초전도 접합부 제조연구)

  • Yu, Jae-Mu;Go, Jae-Ung;Jeong, Hyeong-Sik
    • 연구논문집
    • /
    • s.27
    • /
    • pp.175-181
    • /
    • 1997
  • Superconducting joints between Bi-2223/Ag tapes are fabricated by a press & reaction anneal and a multiple press & anneal. The silver sheath was mechanically or chemically removed from one side of each tape without altering the superconducting core. The exposed superconducting core of the two tapes were brought into contact and pressed so as to form a lap joint. The joined tapes were then subjected to a series of different thermomechanical treatments to achieve optimum heat treatment condition. The result from transport measurements shows that critical current ($I_c$) transmitting through joined area reaches 9A, approximately 60% of the current capacity of the tapes themselves. The critical current through joined area was improved by repeated press and reaction annealing. Measurements of the current-voltage relationship were made with several configuration of the voltage probes to characterize the critical current variation and I-V curve along the joint. Also discussed are microstructural aspects of the superconducting joint.

  • PDF

A Study on Parallel Operation Between Inverter System and Utility Line (인버터 시스템과 상용 전력 계통과의 병렬 운전에 관한 연구)

  • 천희영;박귀태;유지윤;안호균
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.4
    • /
    • pp.369-378
    • /
    • 1992
  • This paper proposes a utility parallel processing inverter system, which consists of a voltage source PWM inverter, isolation transformer and a reactor linking the inverter to utility line. This system realizes following functions : (1) voltage phase frequency and amplitude synchronization between inverter and utility line at stand-alone mode. (2) current phase synchronization between inverter and load at parallel mode. Therefore, despite sudden increase in load current over setting point at stand-alone mode, inverter system can be transferred into parallel mode immediately without transient current. Furthermore, high frequency(18KHz) PWM control and sinusoidal filtering improve the inverter output waveform by eliminating high order harmonic components as well as low order. As a switching device, IGBT is used for high frequency switching and large current capacity.

  • PDF

A Study on Optimization of the Weil-Dobkes Synthetic Short-Circuit Tests (Weil-Dobke 합성단락시험로의 최적화 연구)

  • 김맹현;고희석
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.6
    • /
    • pp.287-292
    • /
    • 2001
  • This paper deals with the configuration, operating principles, systematic calculation method of parameter and optimization method of test circuit for parallel current injection method, series voltage injection method and hybrid synthetic test method as the method for performance test of circuit breaker with extra high interrupting capacity. The test method depicted above is applied to short-circuit making and breaking test (operating sequence :Os CdOs, Od-CdOs) and out-of-phase tests(operating sequence :Os, CdOs) for performance test of the newly-developed 420kV, 50kA and 800kV 50kV puffer-type gas circuit-breaker according to IEC 60056 and IEC 60427. The testing results, evaluation of equivalence for test and analyzed results are also presented in this paper.

  • PDF

Analysis of Sheath Induction Voltage for 154kV OF Underground Cable (154kV OF 지중케이블의 씨스 유도전압 해석)

  • Lee, H.G.;Kim, D.K.;Bae, J.H.;Ha, T.H.;Choi, S.B.;Jeong, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.156-158
    • /
    • 2000
  • As we are industrialized lately, power capacity is increased in the city urban areas. So the application of underground transmission line is largely expended. In this paper, we analysis the induction voltage on the sheath of 1,200[$mm^2$] OF underground cable being used 154kV underground transmission line. If the current on the cable conductor is 300[A], circulation current is induced the maximum 100[A] on the cable sheath.

  • PDF

Performance and Design of Cable Termination for 154kV Class (154kV 케이블 콘넥터의 설계와 특성 평가 연구)

  • Cho, Han-Goo;Kim, Kyang-Young;Lee, Cheol-Ho;Lee, Yong-Sun
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2010.06a
    • /
    • pp.112-112
    • /
    • 2010
  • The purpose of development is to localize a connector for connection of cable and GIS for underground transmission system. The cable connector for GIS provides electrical insulation of GIS housing part and makes connection of ultra high voltage electrical apparatus and power cable by controlling electrical stress between electrodes of power cable termination. Generally Korean switchgear makers are using a connector for GIS made by foreign companies. We manufactured sample by best structure design of great capacity conductor connecting part and then modified the design by analysis of shape and section. We completed the suitable sample for current cycling test condition of conductor connecting part sample and ensured surge characteristics of line by short-time current test.

  • PDF

Electrical Characteristics and FEM Simulations of Beam Type Load Cell (Beam형(形) Load Cell의 FEM Simulation과 그 전기적특성(電氣的特性))

  • Park, Chan-Won;An, Kwang-Hee;Choi, Gyu-Seok
    • Journal of Industrial Technology
    • /
    • v.12
    • /
    • pp.25-36
    • /
    • 1992
  • In this paper, we simulate and calculate the stress and output voltage of the beam structure load cells by using FEM as varing physical structure parameters and loading positions. It is proved that stress enhance as the increase of the notch pitch and radius of the load cell, but decrease as the increase of the notch thickness and beam width. The results are good matched for basic formulas of the single fixed beam, and are verified our simulation is correct. Also, it is found that the stress characteristics of the load cell is varied according to loading positions with structure parameters, and caculated output voltage of the load cell approximate to those of the real manufactured ones. As a result, this study will offer efficient design and analysis technique for making special and variety capacity of load cells.

  • PDF

Development of the Boost Type Auxiliary Coach Converter (객차용 BOOST형 보조전원장치에 관한 연구)

  • 김태완;박건태;정기찬;이성목;김두식
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.727-732
    • /
    • 2000
  • This paper is on the development of a auxiliary power supply for the coach of Indian Railways. The auxiliary power supply system supplies the power for air-conditioners, air-compressors, lighting equipments, controllers, etc. It converts the input voltage, DC 110V which is supplied from battery, to AC 3${\Phi}$ 415V of 30kVA capacity. This is a low voltage-high current type converter system and largely consists of boost chopper and 3 phase inverter. Adopting a optimal control algorithm and simple power circuit, we realized the more reliable and competitive system for satisfaction of Indian Railway's strict requirement for vibration, temperature and dust. We completed the design, the manufacture and the field test of the system successfully and proved the system performance and reliability as a result of those tests.

  • PDF

Regenerative energy analysis in DC 1500V electric traction substations (DC 1500V용 전철변전소의 회생전력량 분석)

  • Bae, Chang-Han;Jang, Dong-Uk;Kim, Young-Gi;Kim, Sung-Tae;Kim, Byung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.836-845
    • /
    • 2007
  • In DC 1500V electric traction substations, diode rectifiers are commonly used to supply stable DC power with electric train sets. However, it operates in the first quadrant of the voltage-current plane and thus needs regenerative inverters which transfer the surplus regenerative power caused by regenerative braking of electric train sets into the grid. In order to select the proper capacity and installation position of regenerative inverter, it needs to investigate the consumed and regenerative energy of the electric traction substations in advance. This paper presents an analysis of regenerative energy in two substations operating in Seoul line 2 and Kwangju line 1. DC line voltage and feeder currents are measured for a day to calculate consumed and regenerative power for four feeders. We calculated an amount of regenerative energy consumed in other feeders and estimated the cost reduction in energy consumption due to the reuse of regenerative energy.