Residual Stress of the Lower Control Arm Subjected to Cyclic Loading (변동하중을 받는 Lower Control Arm의 잔류응력 변화)

  • Kim Gi-Hoon;Kang Woo-Jong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.30 no.5 s.248
    • /
    • pp.602-608
    • /
    • 2006
  • Vehicle components such as lower control arm are usually affected by heat during the welding process. As a result, residual stress is generated, which has much effect on mechanical performances such as crashworthiness and durability. In this study, the residual stress in lower control arm has been measured by the x-ray diffraction method and been analyzed by finite element methods. Heat transfer during seam weld process has been calculated and used in calculating thermal deformation with temperature dependent material properties. High residual stress has been found at vertical wall both by measurement and simulation. The simulation also showed the residual stress re-distribution when the component is subjected to cyclic loading condition.

Bearing capacity of an eccentric tubular concrete-filled steel bridge pier

  • Sui, Weining;Cheng, Haobo;Wang, Zhanfei
    • Steel and Composite Structures
    • /
    • v.27 no.3
    • /
    • pp.285-295
    • /
    • 2018
  • In this paper, the bearing capacity of a non-eccentric and eccentric tubular, concrete-filled, steel bridge pier was studied through the finite element method. Firstly, to verify the validity of the numerical analysis, the finite element analysis of four steel tube columns with concrete in-fill was carried out under eccentric loading and horizontal cyclic loading. The analytical results were compared with experimental data. Secondly, the effects of the eccentricity of the vertical loading on the seismic performance of these eccentrically loaded steel tubular bridge piers were considered. According to the simulated results, with increasing eccentricity ratio, the bearing capacity on the eccentric side of a steel tubular bridge pier (with concrete in-fill) is greatly reduced, while the capacity on the opposite side is improved. Moreover, an empirical formula was proposed to describe the bearing capacity of such bridge piers under non-eccentric and eccentric load. This will provide theoretical evidence for the seismic design of the eccentrically loaded steel tubular bridge piers with concrete in-fill.

Finite Element Analysis for Application of Torsion-free Brake Shoe Holder Hanger for the Bogie of Railway Freight Car (화차대차용 비틀림 흡수구조형 제륜자 홀더행거의 적용을 위한 유한요소해석)

  • Jeon Eung-Sik;Ham Young-Sam
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.36-41
    • /
    • 2003
  • Among welded structure bogies in use for high speed freight car, a part of bogies manufactured in 1999 and 2000 have found problems that failure occurs in its end beam. In case of a freight car a difference of weight between empty and loading conditions are worse than in case of a passenger car. Moreover its brake system is tread brake without second suspension system. A failure of end beam is supposed to be due to loading by brake rather than vertical loading by freight. This failure can make brake system useless and may be a cause of derailment in the worst case. In this study, we have proposed a simple torsion-free brake shoe holder hanger to remove torsion of hanger bracket which is supposed to be one of causes of failure and performed finite element analyses for making trial manufactures and its application.

  • PDF

Load history measurement of end beam of welded structure bogie for railway freight car (화차용 용접구조대차 엔드빔의 하중이력 측정)

  • Ham Young-Sam;Seo Jung-Won;Lee Dong-Hyong;Jeon Eung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.103-108
    • /
    • 2003
  • Among welded structure bogies in use for high speed freight car, a part of bogies manufactured in 1999 and 2000 have found problems that failure occurs in its end beam. In case of a freight car a difference of weight between empty and loading conditions are worse than in case of a passenger car. Moreover its brake system is tread brake without second suspension system. A failure of end beam is supposed to be due to loading by brake rather than vertical loading by freight. This failure can make brake system useless and may be a cause of derailment in the worst case. In this study, in order to be proved the cause of failure and to solve the problem it is described that we have measured load history acted on end beam and set up the procedures.

  • PDF

2-D Axisymmetric Non-linear Finite Strain Consolidation Model Considering Self-weight Consolidation of Dredged Soil (준설매립지반의 자중압밀을 고려한 2차원 축대칭 비선형 유한변형 압밀 모델)

  • Kwak, Tae-Hoon;Lee, Dong-Seop;Lim, Jee-Hee;Stark, T.D.;Choi, Eun-Seok;Choi, Hang-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.8
    • /
    • pp.5-19
    • /
    • 2012
  • Vertical drains along with the preloading technique have been commonly used to enhance the consolidation rate of dredged placement formation. In practice, vertical drains are usually installed in the process of self-weight consolidation of a dredged soil deposit because this process takes considerable time to be completed, which makes conventional analytical or numerical models difficult to quantify the consolidation behavior. In this paper, we propose a governing partial differential equation and develop a numerical model for 2-D axisymmetric non-linear finite strain consolidation considering self-weight consolidation to predict the behavior of a vertical drain in the dredged placement foundation which is installed during the self-weight consolidation. In order to verify the developed model in this paper, results of the numerical analysis are compared with that of the lab-scaled self-weight consolidation test. In addition, the model verification has been carried out by comparing with the simplified method. The comparisons show that the developed model can properly simulate the consolidation of the dredged placement formation with the vertical drains installed during the self-weight consolidation. Finally, the effect of construction schedule of vertical drains and of pre-loading during the self-weight consolidation is examined by simulating an imaginary dredged material placement site with a thickness of 10 m and 20 m, respectively. This simulation infers the applicability of the proposed method in this research for designing a soil improvement in a soft dredged deposit when vertical drains and pre-loading are implemented before the self-weight consolidation ceases.

FRACTURE STRENGTH BETWEEN DIFFERENT CONNECTOR DESIGNS OF ZIRCONIA CORE FOR POSTERIOR FIXED PARTIAL DENTURES MANUFACTURED WITH CAD/CAM SYSTEM (CAD/CAM을 이용한 구치부 전부도재 고정성 국소의치 지르코니아 코어의 연결부 설계에 따른 파절강도)

  • Seo Jun-Yong;Park In-Nim;Lee Keun-Woo
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.44 no.1
    • /
    • pp.29-39
    • /
    • 2006
  • Statements of problem: Zirconia core is used for posterior fixed partial dentures because it's good mechanical properties. Stress is concentrated on connectors in fixed partial dentures, so the proper design of connector areas is needed for adequate mechanical long-term properties of any prosthesis. The area of connector is critical, but tooth size and surrounding soft tissue limit the connector design. Purpose: The purpose of this study is to compare fracture strengths between different connector designs of zirconia core for posterior fixed partial dentures manufactured with CAD/CAM system and determining the optimal connector design satisfying strength and hygiene. Material and method: The following four groups of 40 posterior fixed partial denture specimens(each group 10) were fabricated as followed; group 1 vertical height of connector is 3mm (control group, all groups have the same condition); group 2, lingual vertical 1mm reinforcement on connector; group 3, lingual vertical 2mm reinforcing on connector and group 4, lingual vertical 3mm reinforcing on connector. Specimens were subjected to compressive loading on the central fossa of pontic by instron. SEM was used to identify the initial crack and characterize the fracture mode. Results: The results were as follows: 1. The mean fracture load of the non-lingual reinforcing group was 1212N and the lingual vertical 1mm reinforcing group was 1510N, the lingual vertical 2mm reinforcing group was 1882N, the lingual vertical 3mm reinforcing group was 1980N. 2. The reinforcing groups were statistically significant compared to non-reinforcing groups(P<0.001). 3. There were 2, 3mm reinforcing groups that were statistically significant compared to 1mm reinforcing groups(P<0.001), and the 3mm reinforcing group was not statistically significant compared to 2mm reinforcing groups(P>0.05) 4. Fractures were initiated in gingival embrasures of connectors and processed to the loading site. Conclusion: In this study, lingual reinforcement of connector for improved strength of zirconia based fixed partial denture is nessasary. And long-term study for clinical application is required

Vacuum distribution with depth in vertical drains and soil during preloading

  • Khan, Abdul Qudoos;Mesri, G.
    • Geomechanics and Engineering
    • /
    • v.6 no.4
    • /
    • pp.377-389
    • /
    • 2014
  • The vacuum consolidation method which was proposed by Kjellman in 1952 has been studied extensively and used successfully since early 1980 throughout the world, especially in East and Southeast Asia. Despite the increased successful use, different opinions still exist, especially in connection to distribution of vacuum with depth and time in vertical drains and in soil during preloading of soft ground. Porewater pressure measurements from actual cases of field vacuum and vacuum-fill preloading as well as laboratory studies have been examined. It is concluded that (a) a vacuum magnitude equal to that in the drainage blanket remains constant with depth and time within the vertical drains, (b) as expected, vacuum does not develop at the same rate within the soil at different depths; however, under ideal conditions vacuum is expected to become constant with depth in soil after the end of primary consolidation, and (c) there exists a possibility of internal leakage in vacuum intensity at some sublayers of a soft clay and silt deposit. A case history of vacuum loading with sufficient subsurface information is analyzed using the ILLICON procedure.

Load Carrying Capacity Evaluation of WPC Soundproof Panel Subjected to Vertical Loads (WPC 방음판의 수직하중에 대한 내하성능 평가)

  • Chang, Taesun;Lee, Il Keun;Kim, Chulhwan;Shim, Jaewon
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.823-826
    • /
    • 2014
  • The weight of soundproof panels is an important consideration in the design of both panels and supporting structures. The soundproof panels in noise barriers have to carry their net weight in wet condition respectively the reduced weight and also the weight of the above installed panels in wet condition without showing any failing. In this study, a compression test and a flexural test were performed to determine the maximum vertical load which a wood plastic composites (WPC) panel can bear. In addition, the maximum loading number and height of WPC panels in a noise barrier were calculated for full, simple, and continuous support conditions.

  • PDF

Vertical Vibration Control of High Speed Train-Steel Arch Bridge using Vibration Control Device (진동제어장치를 이용한 고속열차-강아치교의 수직진동제어)

  • 고현무;강수창;유상희;옥승용;추진교
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.09a
    • /
    • pp.360-367
    • /
    • 2003
  • This paper presents passive vibration control method to suppress train-induced vibration on a long-span steel arch bridge. According to the train load frequency analysis, undesirable resonance of a bridge will occur when the impact frequency of the train axles are close to the modal frequencies of the bridge. Because the first mode shape of the long-span steel arch bridge may take anti-symmetric shape along the bridge direction, however, the optimal control configuration for resonance suppression should be considered carefully In this study, bridge-vehicle element is used to estimate the bridge-train interaction precisely. From the numerical simulation of a loom steel arch bridge under TGV-K train loading, dynamic magnification influences are evaluated according to vehicle moving speed and efficient control system with passive dampers are presented in order to diminish the vertical displacement and vertical acceleration.

  • PDF

Stress analysis according to the vertical bone level in the implant placement (임플란트 매식 시 수직골 높이에 따른 응력분석)

  • Kim, Min-Ho;Park, Young-Rok;Kay, Kee-Sung
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.18 no.4
    • /
    • pp.301-311
    • /
    • 2002
  • The purpose of this study was to compare the distributing pattern of stress on the finite element models with the different vertical bone level of implant fixture. The two kinds of finite element models were designed according to vertical bone level around fixture ($4.0mm{\times}11.5mm$). The cemented crowns for mandibular first and second molars were made. Three- dimensional finite element model was created with the components of the implant and surrounding bone. Vertical loads were applied with force of 200N distributed within 0.5mm radius circle from the center of central fossa and distance 2mm and 4 mm apart from the center of central fossa. Von-Mises stresses were recorded and compared in the supporting bone, fixtures, abutment screws, and crown. The results were as following : (1) In vertical loading at the center circle of central fossa on model 1 and 2, the difference from vertical bone in implant placement did not affect the stress pattern on all components of implant except for crown. (2) With offset distance incerasing and the bone level of implant decreasing, the concentration of stress occured in the buccal side of long crown, around the buccal crestal bone, and on the fixture- abutment interface. As a conclusion, the research showed a tendency to increase the stress on the supporting bone, fixture and screw under the offset loads when the vertical level of bone around fixture was different. Since the same vertical bone bed has more benefits than the different bone bed around fixtures, it is important to prepare a same vertical level of bone bed for the success of implants under occlusal loads.