• Title/Summary/Keyword: urban construction records

Search Result 26, Processing Time 0.025 seconds

A Study on the Management of Urban Construction Archives in China (중국의 도시건설기록관(城建檔案館)의 기록관리)

  • Lee, Seung-Hwi
    • The Korean Journal of Archival Studies
    • /
    • no.13
    • /
    • pp.233-285
    • /
    • 2006
  • The Study overviews the development process throughout the foundation procedure of the records centres of the urban Construction. The other purpose of the study is to look over the managing process of urban construction records in the Shanghai Municipal Urnan Construction Archives. As the late of 1950s in China, the principle was set up as the special work in every stage of the urban construction, differently general public records. so records centres is established at the agency where is in charge of the records of urban-construction that has managed the records of the urban-construction intensively and unitarily. During the Great Culture Revolution, while Records Management has ceased. after Revolution, Records management for urban construction developed unprecedentedly. As the 1980s in China, urban construction archives instead of records centres existing started to manage records of urban construction. urban construction archives was established at the 332 of 467 urban the whole country in the 1990s. Shanghai Municipal Urban Construction Archives founded in 1987 where has preserved urban construction records of 230,000 files by abiding by the Provisional Regulation of Management of Urban Construction Archives in Shanghai and other regulations. recently urban construction records management looks forward to new aspect. at first, Managing system setting up for affordable new environment (market economy, modernization of information disclosure)is core stage. second, developing the contents as well as managing records is important. finally making a profit is priority for records management.

A Case Study on the New Administrative Capital Construction Records Management: Focusing on the Arquivo Publico do Distrito Federal of Brazil (신행정수도건설기록물 관리 사례 연구: 브라질의 ArPDF를 중심으로)

  • Gyeonghyeon, Park;Soonhee, Kim
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.22 no.4
    • /
    • pp.109-128
    • /
    • 2022
  • The new administrative capital construction project is an important national project implemented to relocate the national administrative capital, and the records produced during the construction have high historical value. However, Korea's management of these records related to the construction of the new administrative capital is insufficient; thus, finding a management plan is necessary. In contrast, Brazil is a country that collects, builds, and maintains both public and private records produced during the construction of Brasilia, the new administrative capital. Thus, Arquivo Publico do Distrito Federal (ArPDF), the Brazilian records management organization established to manage Brasilia's construction records, was selected as the case analysis subject in this study. By analyzing ArPDF's website and official publications, this study investigated the overall matters related to the management of new administrative capital construction records and derived implications applicable to the management of new administrative capital construction records in Korea.

A Study on the Interpretation of Modern Urban Structure and Urban Landscape of Iri(Iksan) in Connection with Railway (철도시설과 연계한 이리 도시구조와 도시경관의 근대성 해석)

  • Lee, Kyung-Chan
    • Journal of architectural history
    • /
    • v.21 no.6
    • /
    • pp.63-76
    • /
    • 2012
  • Modern railway construction by Japanese had a great influence on the urbanization, transformation of urban structure and landscape during the Japanese imperialism and compressive increasing period in Iri(Iksan). This paper aims to find out the effect of railway on the modern urban structure and urban landscape in Iri(Iksan). Railways in Iri, Honam railway, Kunsan railway, Jeonla railway have been constructed progressively during 1911 and 1915 with Iri and old Iri(east-Iri) station. From the analysis of land registration maps and street plans, old photographies and historical records, some significant features underling railway construction can be followed in view of modern urbanization process in Iri. Firstly railways cut off the possibility of developing urban structure based on traditional spatial structure of Iksan. Secondly railways made dual spatial structure in Iri. Japanese and Korean life zone were divided into separate district around urbanization area and market place. Thirdly traditional space cognition system based on four cardinal directions were changed to front and rear space of railway station. Fourthly railways and stations caused neo-baroque spatial order and imperialistic urban landscape of Iri with axis, vista and gridiron plan. Fifthly break points and fringe belts garbling modern urbanization process are created. Sixthly modern cultural and consumptive urban spaces were taken their seats in relation with daily urban life.

A study on the construction and urban space of Xuzhou(徐州) Castle during the Ming and Qing Dynasties (명청시기 서주성(徐州城)의 건설과 도시공간 연구)

  • Wu, Tian-QI;Han, Dong-Soo
    • Journal of architectural history
    • /
    • v.31 no.2
    • /
    • pp.51-65
    • /
    • 2022
  • Seoju is one of the nine weeks of the ancient period, and according to literature records, the construction of Seojuseong Fortress has a long history of 2573. This is the land of Oseongtong-gu, a political and military hub, and flood disasters have frequently led to frequent reconstruction of fortresses. In particular, it is also an important place to show that the function of the fortress is defensive and has a function of preventing floods. This study analyzed the shape of Seojuseong Fortress and the characteristics of urban spaces in the Myeongcheong period through excavation data and literature data.

The Structural Engineering Design and Construction of the Highest Occupiable Skybridge in the World: The Address Jumeirah Resort, Dubai, UAE

  • Hadow, Zaher;Dannan, Yamen
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.1
    • /
    • pp.61-68
    • /
    • 2022
  • The Address Jumeirah Resort is a mixed-use 77-story tower reaching a height of 301 meters with a slenderness ratio of 13.5:1. The development is situated in the Jumeirah Beach District and accommodates 217 key five-star hotel suites, 478 residential apartments, 444 serviced-branded apartments, retail shops, ballrooms and entertainment facilities around the premises. The building has over 242,000 m2 of usable area. The project is an award-winning development that broke multiple Guinness records. The focus of the paper is to present the challenges faced in the structural design and construction of the super tall tower and the highest occupiable skybridge in the world.

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

INTRA-AND INTERGOVERNMENTAL INFORMATION SYSTEM TO MANAGE INFORMATION IN URBAN RENEWAL PROJECT

  • Dong-bum Kim;Jin-Won Kim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.561-566
    • /
    • 2011
  • In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.

  • PDF

Case Study of Opinion Coordination between Residents and Coordinators on the Planning Process of Community Housing in Sungmisan Village (성미산마을 공동체주거 계획과정의 거주자와 코디네이터의 의견조정 사례연구)

  • Park, Kyoung-Ok;Ryu, Hyun-Soo
    • Journal of the Korean housing association
    • /
    • v.23 no.3
    • /
    • pp.1-11
    • /
    • 2012
  • The purpose of this study was to make clear considerations in the planning of community housing and the roles of coordinators. Seongmisan village, a representative urban community village in Seoul, was selected for this study on problem solving between residents and opinion coordination between residents and coordinators. For this qualitative research, 2 residents and 2 coordinators answered 'open questionnaires' on prior basic planning, land purchase, financing, architectural planning, construction and inspection, and actual living conditions thereafter. They were each interviewed for 2 hours at a time that was 14-16 months after the residents started living in the new houses, and the records were transcribed. The following was the result. 1) The residents, who ruled the steps of prior basic planning and land purchase, did not have sufficient information or knowledge of the construction of community housing, so that they faced difficulties especially in the legal and financial aspects. 2) The coordinators participated in the project at the steps of architectural planning and construction. The residents accepted the coordinators' opinions on the choice of floor and position, and the coordinators listened to the residents' opinions on individual plans and finishing materials. In the construction step, however, there was conflict between them, and dissatisfaction occurred on the completion time and construction cost. For the successful construction of community housing, a professional coordination company needs to join the project to establish a system of opinion coordinating from the step of prior basic planning to the step of afterconstruction management.

Development of web-based system for ground excavation impact prediction and risk assessment (웹기반 굴착 영향도 예측 및 위험도 평가 시스템 개발)

  • Park, Jae Hoon;Lee, Ho;Kim, Chang Yong;Park, Chi Myeon;Kim, Ji Eun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.559-575
    • /
    • 2021
  • Due to the increase in ground excavation work, the possibility of ground subsidence accidents is increasing. And it is very difficult to prevent these risk fundamentally through institutional reinforcement such as the special law for underground safety management. As for the various cases of urban ground excavation practice, the ground subsidence behavior characteristics which is predicted using various information before excavation showed a considerable difference that could not be ignored compared to the results real construction data. Changes in site conditions such as seasonal differences in design and construction period, changes in construction methods depending on the site conditions and long-term construction suspension due to various reasons could be considered as the main causes. As the countermeasures, the safety management system through various construction information is introduced, but there is still no suitable system which can predict the effect of excavation and risk assessment. In this study, a web-based system was developed in order to predict the degree of impact on the ground subsidence and surrounding structures in advance before ground excavation and evaluate the risk in the design and construction of urban ground excavation projects. A system was built using time series analysis technique that can predict the current and future behavior characteristics such as ground water level and settlement based on past field construction records with field monitoring data. It was presented as a geotechnical data visualization (GDV) technology for risk reduction and disaster management based on web-based system, Using this newly developed web-based assessment system, it is possible to predict ground excavation impact prediction and risk assessment.

Effectiveness of rocking walls system in seismic retrofit of vertically irregular RC buildings

  • Tadeh Zirakian;Omid Parvizi;Mojtaba Gorji Azandariani;David Boyajian
    • Steel and Composite Structures
    • /
    • v.52 no.5
    • /
    • pp.543-555
    • /
    • 2024
  • This study examines the seismic vulnerability of vertically irregular reinforced concrete (RC) frame buildings, focusing on the effectiveness of retrofitting techniques such as rocking walls (RWs) in mitigating soft story mechanisms. Utilizing a seven-story residential apartment as a prototype in a high-seismicity urban area, this research performs detailed nonlinear simulations to evaluate both regular and irregular structures, both before and after retrofitting. Pushover and nonlinear time history analyses were conducted using OpenSees software, with a suite of nine ground motion records to capture diverse seismic scenarios. The findings indicate that retrofitting with RWs significantly improves seismic performance: for instance, roof displacements at the Collapse Prevention (CP) level decreased by up to 23% in the irregular structure with retrofitting compared to its non-retrofitted counterpart. Additionally, interstory drift ratios were more uniform post-retrofit, with Drift Concentration Factor (DCF) values approaching 1.0 across all performance levels, reflecting reduced variability in seismic response. The global ductility of the retrofitted buildings improved, with displacement ductility ratios increasing by up to 29%. These results underscore the effectiveness of RWs in enhancing global ductility, mitigating soft story failures, and providing a more predictable deformation pattern during seismic events. The study thus provides valuable insights into the robustness and cost-effectiveness of using rocking walls for retrofitting irregular RC buildings.