• Title/Summary/Keyword: unit-modular construction

Search Result 95, Processing Time 0.033 seconds

A comparative analysis of load behavior of the fixing equipments for transporting unit modules (유닛모듈 운반용 고정장치의 하중거동 비교 분석)

  • Kim, Kyoon-tai;Kim, Seok;Jun, Young-Hun;Kim, Tae-Yeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.146-147
    • /
    • 2015
  • This paper compares load behavior of two fixing equipments for transporting unit modules. The suggested fixing equipment shows higher limit load than an existing fixing equipment, which proves that the suggested fixing equipment have higher safety.

  • PDF

Framework on Database Development based on Modular Simulation Model Implementation for Curtain Wall Operations in High-rise Buildings (초고층 커튼월공사 MSM 구성 및 데이터베이스 구축을 위한 프레임워크)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Tae-Hyung;Shin, Young-Keun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.301-302
    • /
    • 2012
  • Recently, high-rise building projects have been in the spotlight in South Korea. Curtain wall construction, as one of important operations in the high-rise building projects is composed of various, entangled and complex unit processes that require a systematic planning to prevent unexpected delays. A schedule simulation technique has been used for deriving more efficient planning and accurate performance measurement. However, the simulation technique has difficulty in collecting actual data and in applying data fluctuations during construction. Thus, this paper suggests a concept model of Modular Simulation Model(MSM) that overcomes such limitations of traditional simulation technique based on curtain wall operations.

  • PDF

Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase (대규모 모듈러 건축 프로젝트 현장 시공 시 공장 생산량 및 현장 시공량 관리 모델)

  • Choi, Onekyu;Lee, Hyunsoo;Park, Moonseo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.43-53
    • /
    • 2018
  • Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.

A Study on Outsourcing Application of M.E.P. System for Manufacturing Process Improvement of the Modular Construction Method (모듈러건축 공법의 공장제작과정 개선을 위한 M.E.P.시스템 외주제작 적용에 관한 연구)

  • Choi, Jun-Sok;Lee, Jae-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.277-283
    • /
    • 2018
  • This study is conducted to improve the manufacturing process of the modular construction method, which is a pre-fabricated construction method recognized for its advantage on the shortening of construction time. This study first identified the factors that result in shortening of pre-fabrication processes in the current module-processing factory. In addition, those identified factors were further considered for installing the M.E.P. system that is being outsourced on the main module in the production line. A manufacturing process of the construction modules, which considers installation of a M.E.P. system most suitable for shortening the time on the outsourcing of modular construction, is introduced throughout the research. Furthermore, this study suggests the factors in need of improvement during design phase of modular construction and improvement measures to consider the quality of unit modules by focusing on the module parts that are most exposed to defects.

A Study on Development of Modular System using Light-weighted Structure Members (경량형강을 사용한 모듈러 시스템 개발에 관한 연구)

  • Zheng, Sheng-Lin;Ju, Gi-Su;Park, Sung-Moo
    • Proceeding of KASS Symposium
    • /
    • 2008.05a
    • /
    • pp.43-48
    • /
    • 2008
  • The object of this paper is to evaluate on constructability of modular steel frame with the hollow structural steel section to LEB C-shape. A modular building is built with factory-manufacture and site-construction. The advantage of a Modular building presents that enhanced building quality, shortened construction period and easy at an expansion and enlargement for buildings but also has demerits such as size restriction of the modular units according to the Road Traffic Law and Inflexibility of the unit composition. So in this study we use light-weighted structure members with bolted joint for easy Knock-down and traffic, also we evaluated the constructability of this bolted joints type modular buildings.

  • PDF

A Study on the Constructability of Modular Steel Frame (해체.조립식 모듈러 철골조 건물의 시공성에 관한 연구)

  • Zheng, Sheng-Lin;Kang, Joo-Won;Park, Sung-Moo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.8 no.4
    • /
    • pp.65-71
    • /
    • 2008
  • The object of this paper is to evaluate on constructability of modular steel frame with the hollow structural steel section to LEB C-shape. A modular building is built with factory-manufacture and site-construction. The advantage of a Modular building presents that enhanced building quality, shortened construction period and easy at an expansion and enlargement for buildings but also has demerits such as size restriction of the modular units according to the Road Traffic Law and Inflexibility of the unit composition. So in this study we use light-weighted structure members with bolted joint for easy Knock-down and traffic, also we evaluated the constructability of this bolted joints type modular buildings.

  • PDF

Simulation analysis of Transporting Fixation Equipment on Unit Module (유닛모듈 운반을 위한 고정장치의 시뮬레이션 분석)

  • Park, Su-Yeul;Kim, Kyoon-Tai;Park, Nam-Cheon;Chae, Myung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.143-144
    • /
    • 2013
  • Unit module system produce units in the factory and assemble in the field. This unit module system has advantages of shortening the process of construction. However, it is still in the early research related to setting the unit module which is transported by truck to the field. Therefore, when transporting the unit module, this goal of study develops fixed devices. And suggesting device were performed that simulations analyzed maximum stress and assessed the safety.

  • PDF

Combine Method of Small Unit Modules for Urban Regeneration Projects (도시재생을 위한 소형 유닛모듈 결합방법)

  • Kim, Kyoon-Tai;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.243-244
    • /
    • 2018
  • This study focused on the fact that there are a lot of alleys in some areas of the Urban Renewal New Deal project. In this study, we proposed a method to construct a spatial module by combining small modules. It is expected that the combination of small modules developed in this way will help revitalize the New Deal of Urban Regeneration. In the future, additional joint details will be developed, structure review will be conducted.

  • PDF

Proposal of a Classification System of Checklists for Safety Management of On-Site Workers in Modular Construction (사례분석을 통한 모듈러 건축의 현장 작업자 안전관리 체크리스트의 분류 체계 제안)

  • Jun, Younghun;Kim, Kyoontai;Jeon, Eunbi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.120-130
    • /
    • 2021
  • Recently, the government is reinforcing safety management at construction sites to prevent safety accidents in construction works, and the safety management plan of workers is an important situation. Meanwhile, modular construction is expected to be gradually expanded to middle and high-rise buildings, but active measures to ensure worker safety are insufficient. This study is a preliminary study of the development of a checklist for preventive worker safety management. The purpose of this study is to derive a checklist classification system for the safety management of workers in the field of modular construction by preceding studies, case analysis, and expert advisory opinions. The classification system consists of large categories of factory manufacturing, transportation, and on-site construction, and the sub-system consists of six sub-classes: foundation work, frame work, modular frame installation work, finishing work, and facility work. Among them, the sub-classification of modular frame installation work consists of 12 unit works, centering on module lifting and assembly module work, which are the main construction processes. And the classification system reflects the three main management factors and contents for defined safety management. It is expected that the research results of this study can contribute to efficient safety management at the modular construction site.

A Comparative Analysis for the Energy Performance of the Prefabricated Residential Modular Spaces (주거용 조립식 단위공간의 유형별 에너지성능 분석)

  • Park, Jongil;Han, Seung-Hoon
    • KIEAE Journal
    • /
    • v.17 no.5
    • /
    • pp.87-94
    • /
    • 2017
  • Purpose: Prefabricated modular space such as a container construction has recently been interested unlike the conventional construction method, and their scale have expanded from small buildings such as cafes, houses and pensions to shopping centers, complex cultural spaces where shows and exhibitions are possible doing. In this way, the container is in the spotlight as an advantage such as mobility, flexibility, correspondence, economic efficiency, recyclability and so on. However, there are no specific guidelines and standard design methods in aspects of structural calculation, functional insulation and environmental configuration. Therefore, as the first step to resolve these problems, this study has focused on the field of environmental performance of container construction, presented appropriate guidelines and searched ways to improve performances. Method: For this study, seven types of the modular building were chosen and compared, and their energy performances have been analyzed using a proven simulation tool. Essential methodology and terminology were examined to estimate and judge their efficiency. Result: In conclusion, energy performances depend on specific configuration of combined unit spaces, and design guidelines cold be set up for promoting their use in the practical field.