• Title/Summary/Keyword: unit-modular construction

Search Result 95, Processing Time 0.023 seconds

Numerical and analytical study on initial stiffness of corrugated steel plate shear walls in modular construction

  • Deng, En-Feng;Zong, Liang;Ding, Yang
    • Steel and Composite Structures
    • /
    • v.32 no.3
    • /
    • pp.347-359
    • /
    • 2019
  • Modular construction has been increasingly used for mid-to-high rise buildings attributable to the high construction speed, improved quality and low environmental pollution. The individual and repetitive room-sized module unit is usually fully finished in the factory and installed on-site to constitute an integrated construction. However, there is a lack of design guidance on modular structures. This paper mainly focuses on the evaluation of the initial stiffness of corrugated steel plate shears walls (CSPSWs) in container-like modular construction. A finite element model was firstly developed and verified against the existing cyclic tests. The theoretical formulas predicting the initial stiffness of CSPSWs were then derived. The accuracy of the theoretical formulas was verified by the related numerical and test results. Furthermore, parametric analysis was conducted and the influence of the geometrical parameters on the initial stiffness of CSPSWs was discussed and evaluated in detail. The present study provides practical design formulas and recommendations for CSPSWs in modular construction, which are useful to broaden the application of modular construction in high-rise buildings and seismic area.

Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM) (DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안)

  • Hyun, Hosang;Lee, Hyun-soo;Lee, Jeonghoon;Park, Moonseo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.2
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

A Study on the Automatic Design of Unit Modular House Using Component and Unit DB (부품 및 유닛 DB를 이용한 유닛 모듈라 주택의 설계자동화 연구)

  • Lim Seok-Ho;Kim Soo-Am;Hwang Eun-Kyung
    • Journal of the Korean housing association
    • /
    • v.17 no.3
    • /
    • pp.41-49
    • /
    • 2006
  • Precast concrete apartments were main stream of domestic industrialized housing around 90's, and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel stud and unit box have their own merits and demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the open system basis. In this study, the design standard for unit house will be established coping with the established preparing standard for design specifications defined by architectural law and promotion law of housing construction. That is for design standard of industrialized private housing on the open system basis. This study attempts to propose the design automation, with the method of unit construction of which the rate of pre-fabrication is the biggest, that can cope with the demand of user on the basis of open-system. Ticky-tacky is the biggest technical problem in suppling industrialization housing. Therefore, we will suggest a basic plan for design automation of unit modular housing which can raise the productivity of industrialization housing by applying open system, utilized by DB of component and unit, and solve the problem concerned about ticky-tacky.

Study of Improved Transporting Methods on Unit Module (유닛모듈 운송 방법의 개선방향 연구)

  • Park, Su-Yeul;Kim, Kyoon-Tai;Park, Nam-Cheon;Jung, In-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.243-244
    • /
    • 2012
  • Recently, research has been actively conducted for getting interested in unit module housing. However, the domestic unit modular housing research in the early stages yet, so the major process for research is lacking. Explore all these reasons fit with domestic unit housing development this paper, focusing on the process of shipping cargo by truck, transport unit module was studied. The purpose of this paper is to present new ideas and derive the direction of the development of the equipment safely and effectively fixed to the unit module of the transport unit module that will be helpful in the development of the equipment required for the transport process of the next unit module.

  • PDF

Modular Building Construction Process Development by Benchmarking International Best Practices (선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안)

  • Shin, HyunKyu;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.3-12
    • /
    • 2016
  • The purpose of this study is to provide a domestic applicable modular building construction process by benchmarking international best practices. In this study, we derive the risk factors that may occur in performing a modular construction projects and the modular construction management factors through case analysis. In order to effectively respond to risks in performing a modular building projects, we propose the modular building construction process which is separated by a transportation, lifting, assembly steps based on the unit module construction sequence. It is the key to providing management information and guidelines for the design, production, construction participants by reflecting the information for each step in the process. This study would prevent a potential hazard which may occur in the construction process. Consequently, It could result in saving the entire cost of modular construction project as shortening the project schedule and could improve workability of modular construction.

A Study on Factory Product System of Unit Modular Housing System in Korea, United States, Japan, Europe (친환경 유닛모듈라 주택의 공장생산시스템에 관한 비교 연구 -한국, 미국, 일본, 유럽의 사례를 중심으로-)

  • Lim, Seok-Ho;Park, Keun-Sung;Chae, Chang-U;Kwon, Bo-Min
    • Journal of the Korean housing association
    • /
    • v.18 no.4
    • /
    • pp.27-35
    • /
    • 2007
  • The use of light steel framing as a method of house construction has increased significantly throughout Japan, United States and Europe. Industrialized unit method are prevailing in developed countries. Unit modular house industry has supported an intensive technical development, and housing systems are now available, which are highly adaptable in form and use. Unit modular house have their own merits and demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the open system basis. This paper describes the general forms of factory product system of unit modular housing system in Korea, United States, Japan. And this study attempts to propose the unit factory product system of which the rate of pre-fabrication is the biggest, that can cope with the demand of user on the basis of open-system.

A Study on Development of BIM Library for Unit Modular Housing - Focused on Small-sized Urban-life-housing - (유닛모듈러 주택의 BIM 라이브러리 개발 연구 - 소규모 도시형 생활주택을 중심으로 -)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • Journal of the Korean housing association
    • /
    • v.23 no.6
    • /
    • pp.11-20
    • /
    • 2012
  • This Study developed library of parts, applied with 3-dimension character which has width, length and height and a reference plane, for the system development of BIM design on housing unit modular. The current BIM software has not the concept of a reference plane or work tolerance in modular, so the development of parts library applied to unit modular has not moved forward. So, we developed, in this study, parts library applied to windows, built-in-furniture, kitchen systems and knock down bathrooms, with a reference plane and work tolerance based on single roon prototype on urban-life-housings. BIM library can utilize changed size and work tolerance of parts, and fabricating reference plane will be created automatically when an engineer puts work tolerance in the BIM library with supplement of some category related to work reference. Through this BIM library development, we consider the part module can be used for housing complex planning, and architectural designers will be able to utilize the BIM library for housing complex design.

A Study on Construction of Multiple-Valued Multiplier over GF($p^m$) using CCD (CCD에 의한 GF($p^m$)상의 다치 승산기 구성에 관한 연구)

  • 황종학;성현경;김흥수
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.31B no.3
    • /
    • pp.60-68
    • /
    • 1994
  • In this paper, the multiplicative algorithm of two polynomials over finite field GF(($p^{m}$) is presented. Using the presented algorithm, the multiple-valued multiplier of the serial input-output modular structure by CCD is constructed. This multiple-valued multiplier on CCD is consisted of three operation units: the multiplicative operation unit, the modular operation unit, and the primitive irreducible polynomial operation unit. The multiplicative operation unit and the primitive irreducible operation unit are composed of the overflow gate, the inhibit gate and mod(p) adder on CCD. The modular operation unit is constructed by two mod(p) adders which are composed of the addition gate, overflow gate and the inhibit gate on CCD. The multiple-valued multiplier on CCD presented here, is simple and regular for wire routing and possesses the property of modularity. Also. it is expansible for the multiplication of two elements on finite field increasing the degree mand suitable for VLSI implementation.

  • PDF

Structural Performance of the Modular System with Fully Restrained Moment Connections using Ceiling Bracket (천장 브래킷을 이용한 완전강접합 모듈러 시스템의 구조성능)

  • Lee, Seung-Jae;Kwak, Eui-Shin;Park, Jae-Seong;Kang, Chang-Hoon;Shon, Su-Deok
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.33 no.12
    • /
    • pp.37-44
    • /
    • 2017
  • Due to structural characteristics, construction costs and duration of a modular system would be saved by minimizing the schedule on the job site. As such, it is crucial to develop a connection that can guarantee stiffness while allowing for simple assembling. Particularly, the mid- to high-rise construction of the modular system necessitates the securing of the structural stability and seismic performance of multi-unit frames and connections, and thus, the stiffness of unit-assembled structures needs to be re-evaluated and designed. However, evaluating a frame consisting of slender members and reinforcing materials is a complicated process. Therefore, the present study aims to examine the structural characteristics of a modular unit connection based a method for reinforcing connection brackets and hinges while minimizing the loss of the cross section. Toward this end, the study modeled the beam-to-column connection of a modular system with the proposed connection, and produced a specimen which was used to perform a cycling loading test. The study compared the initial stiffness, the attributes of the hysteretic behavior, and the maximum flexural moment, and observed whether the model acquired the seismic performance, compared to the flexural strength of the steel moment frame connection that is required by the Korean Building Code. The test results showed that the proposed connection produced a similar initial stiffness value to that of the theoretical equation, and its maximum strength exceeded the theoretical strength. Furthermore, the model with a larger ceiling bracket showed higher seismic performance, which was further increased by the reinforcement of the plate.