• Title/Summary/Keyword: unit-modular construction

Search Result 95, Processing Time 0.025 seconds

Survey on the Market of Modular Building Using ARIMA Model (ARIM모형을 활용한 모듈러 건축시장 현황 조사)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Lee, Yuril
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.14-15
    • /
    • 2014
  • The modular construction is as yet early stage of market in Korea. So It is have difficulty of market demand forecast of the modular building. Therefore, this study was done analysis for market trends of the modular building using ARIMA(Auto Regressive Integrated Moving Average) model by time series data.

  • PDF

Test Result on Embedded Steel Column-to-Foundation Connection for Modular Unit Structural System (유닛 모듈러 기둥 매입형 기초 접합부에 대한 실험 연구)

  • Lee, Sang Sup;Bae, Kyu Woong;Park, Keum Sung;Hong, Sung Yub
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.6
    • /
    • pp.537-547
    • /
    • 2014
  • A steel modular unit structural system has been used increasingly for mid and high-rise buildings, since the building can be easily constructed by assembling the pre-made modular unit structures. For this structural system, each modular unit structures have to be properly connected to the foundation to transfer the axial force and the bending moment that are generated from external load to the ground. In this study, a new type of the embedded steel column-to-foundation connection was proposed, and its flexural behavior was evaluated through a series of experimental study. Five full scale specimens for the proposed connections were constructed and tested. The effect of the main parameters that affect the flexural behavior of the proposed connection, such as embedment length and shape of end plate, were studied. From the results, it was found that the flexural stiffness of the proposed connection was higher than that of the semi-rigid connection for all test specimens, and 200 mm of embedment length was proper for the given test specimens in this study.

The Practical Application of Modular Construction for Residential Facilities (주거시설로서 모듈러건축 활용화 방안)

  • Kim, Ji-Hyeon;Park, Il-Min
    • Journal of the Korean housing association
    • /
    • v.24 no.3
    • /
    • pp.19-26
    • /
    • 2013
  • The purpose of this research is to provide basic data for the promotion strategy to activate modular construction system as residential facilities, through a study on the architectural planning, institutions and policies and research on connection details, for the use as residential facilities of the modular construction that is not actively supplied for the general residential facilities. As a result, I suggest sample model plan of domestic and foreign case analysis and characteristic of modular construction and practical application of modular construction for Residential Facilities. Owing to many advantages including short construction period structural stability and economic benefits, modular construction is expected to play a role as residential alternative of socially controversial affordable housing and weekend homes, and potential housing shortage after reunification; and to contribute to the development of design automation and industrialized constructions. Though Korea is still lacking development of the system that meets the domestic context, if supported by ongoing researches on the development of construction methods, materials and details, the settlement of appropriate modular residential facilities to suit the national situation will serve a possible alternative solution for many housing and environmental problems.

Development of a Korean Modular Housing Construction Scenario (한국형 모듈러 주택 시공의 시나리오 개발)

  • Kim, Kyoon-Tai;Kim, Chang-Han;Lee, Du-Heon;Lee, Young-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.81-83
    • /
    • 2011
  • A modular house is a house that is assembled on-site from modularized units. As such units are manufactured in a factory, the construction period is reduced, resources are recycled, and quality is improved. However, the construction technique applied to conventional modular houses has not overcome certain structural restrictions, as it is currently used to build houses less than 4 stories in height, which means that it lacks economic feasibility. For this reason, this research aims to develop a scenario of a construction method for Korean modular housing that can be applied to urban-type housing higher than 12 stories. This research is expected to provide fundamental data necessary for the future development of a construction method for Korean modular housing.

  • PDF

A Study on the Unit Modular System Process Application Plan (모듈러공법의 국내 적용 활성화 방안에 대한 연구)

  • Kim, Do-Min;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.113-114
    • /
    • 2012
  • The productivity of the construction industry is lower than other industries. Modular system is suggested to enhance the productivity of the construction industry. Modular system is a construction method which installs units manufactured in factory on site. It enables to reduce the duration and improve the quality of the constructions. However, the construction technique applied to modular system has not overcome certain structural problems. To solve the problems and motivate the application of modular system, this study propose the hybrid system which use core to resist a lateral force.

  • PDF

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

A fundamental study for applying of Unit modular housing production system in the domestic (국내 유닛 모듈러(Unit Modular) 주택생산시스템 적용을 위한 기반 구축에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.3-11
    • /
    • 2013
  • The government has made a lot of efforts to realize 'low-carbon green growth', one of the national policy agendas, throughout the whole industries. The construction sector is not an exception, and technological developments are active to reduce energy consumption and greenhouse gas emission. In particular, buildings occupy more than 20% of the total national energy consumptions. Thus, it can be said that increasing energy efficiency of the residential buildings and reducing CO2 emission are the urgent national agenda. Moreover, as ordinary people find it more and more difficult to get a lease on housing, which has become an important social issue recently, a housing production system that can actively respond to market demands is in urgent need. To build an eco-friendly system that can maximize efficiency in construction, this study attempts to examine and analyze the modular housing production system in the county and to find its problems. By suggesting the ways to improve the system, it aims to prepare for the base to revitalize the unit modular housing production system.

Load analysis for transporting unit module (유닛모듈 운반시 작용하중 분석)

  • Kim, Kyoon-tai;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.200-201
    • /
    • 2015
  • The unit modular method is one in which unit modules are prefabricated at a factory and then constructed at a construction site. That is why an important process, transporting unit module, is added in this method. The purpose of this study is to analyse the load for transporting unit module. The results of the analysis of the driving experimental runs revealed that a maximum load of 15 kN was applied on adapter block type A and a maximum load of 25 kN on adapter block type B. These loads were recorded at the points in the road test when the low-bed trailer was driving through unstable sections of the test such as stopping, restarting, passing over a speed bump or taking a left turn at speed.

  • PDF

Applying Unit Modular In-Fill Construction Method for High-Rise Buildings

  • Moon, Sangdeok;Kim, Junyoung;Lee, Jaesung;Ock, Jongho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.132-137
    • /
    • 2015
  • A modular construction method includes factory-prefabricated room-sized volumetric units. Although low-rise buildings have been constructed worldwide using this method for more than 30 years, it is a relatively new technology in high-rise construction. There are three basic methods of constructing high-rise buildings using modular construction: the core method, the core-and-podium combination method, and the modular in-fill method. While the first two have been used in the USA and in several European countries, the third method, introduced in 2011 by an international cruise ship development firm, is a rather new approach for which there are few case histories. Therefore, its applicability and construction feasibility should be verified. As a pilot study to test the applicability of the modular in-fill method, a 12-story residential building was built in Korea. This paper describes a case study of the pilot project. The advantages and disadvantages of the method and its applicability in terms of cost effectiveness and construction schedule management were evaluated.

  • PDF

A Basic Study on the Application of Modular Construction - Focused on the Analysis of Case Study - (모듈러 건축의 현황과 활용에 관한 기초연구 - 사례조사 분석을 중심으로 -)

  • Kim, Jae-Young;Lee, Jong-Kuk
    • Journal of the Korean housing association
    • /
    • v.25 no.4
    • /
    • pp.39-46
    • /
    • 2014
  • This research was for the investigation and analysis of the illustration of modular construction application which is different use by each school facility since modular construction related examples are rare in domestic situation, and it has a limitation because of its being basic research material for generating the basic form of modular construction. The research results are as followings. First, in case of school facility from illustration investigation results, module measurement of class modulation is as similar as $3m{\times}10m$, but in resident facility the planning of more flexible plane shape can be possible since modules of 6 cases are free and various, and facade form of various types can be appeared by combination of module unit. Second, as a result of the generated characteristics in compared analysis of representative examples, school facilities were highly indicated for movability and duration reduction areas, and the flexibility, economic efficiency, and environment-friendliness was indicated low relatively. Third, the basic planning types of modular construction can be largely divided into layered type, horizontal (straightway) type, and compound type. The layered type has a short traffic line and facility system and is appropriate for the low-rise form unless separate construction method is used since it is susceptible to load. The horizontal type is advantageous for securing an opening since it has wide extent in light but has a long traffic line and facility system. Finally, the compound type can be possible for planning of various forms but needs the combination of various unit modules and traffic line and facility plan for it can be difficult.