A Study on the Supply Process of Unit Modular Housing through a Comparison of Cases

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Tae-Yeong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.411-414
    • /
    • 2015
  • The purpose of this study is to conduct a comparative analysis between Korea and the United States of the supply process of unit modular housing at both the factory production phase and the transportation and lifting phase, as part of an attempt to invigorate the unit modular housing market in Korea. Unlike the practice in the United States, one of Korea's unique characteristics is that the floor is constructed with reinforced concrete and hot water heating system. To do this, the wet method in Korea is used that includes concrete placement, curing and constructing hot water floor heating system at the factory production phase, which results in a longer production time and also requires the lifting of heavier loads. In the United States, interior and exterior finishing works of modular housing are performed by different companies, and the distance between the unit module factory and the construction site is quite far. This kind of dualized production structure may cause confusion when it comes to schedule management, procurement management, and stock management. Moreover, problems caused by external environmental factors such as wind and rainfall were reported in the course of long-distance transportation. The results of this case comparison are expected to provide fundamental data that will reduce the amount of trial and error in the unit module production, transportation and lifting work in Korea, which has a comparatively small number of unit modular housing cases.

  • PDF

유닛모듈 운반하중에 관한 확률분포 모델 추정 (Estimation of the Probability Distribution Model on the Load of Transport of the Unit Module)

  • 박남천;김균태;김석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.220-221
    • /
    • 2014
  • Recently It has been required the research for the load of transport of the unit module to secure the safety of the transport locking device. So the purpose of this study is to analyze the probability distribution of the load of transport of unit modular when transporting unit modular by vehicle.

  • PDF

유닛모듈러주택의 시공효율화를 위한 수행체계 개선방향 연구 (A Study on the Project Delivery System Improvement for Construction Efficiency of the Unit Modular Housing)

  • 박남천;김균태;박수열;채명진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.265-267
    • /
    • 2013
  • Recently, It is being reduction to market of the domestic construction industry for the instability of the domestic market structure. So it is necessary to plan response measures for to ensure the competitiveness of the construction market of overseas. The purpose of the study is suggest of improvement of the project delivery system for the efficiency of the construction of the unit modular housing of considering the reducing cost and technological competitiveness of the domestic construction industry.

  • PDF

플로팅 건축 상부시설에서 모듈러 시스템 적용 유럽 사례 연구 (A Case Study on the Application of Modular System to the Superstructure of Floating Architecture in Europe)

  • 송석기
    • 한국항해항만학회지
    • /
    • 제36권10호
    • /
    • pp.873-881
    • /
    • 2012
  • 현장 공사의 제약이 많은 플로팅 건축 상부시설에서 모듈러 시스템 적용 방안 정립을 위한 기초 연구로서 모듈러 시스템이 적용된 유럽의 사례를 분석하여 이를 유형에 따라 분류하였다. 플로팅 건축 상부시설에서 모듈러 시스템 적용 유형은 단위 건축물 모듈러 유형, 단위 공간 모듈러 유형, 계획 개념으로서 모듈러 유형으로 구분될 수 있었다. 유럽에서 가장 많이 사용된 유형은 소규모 풀로팅 주거 건축에서 적용된 단위 건축물 모듈러 유형이었고, 단위 공간 모듈러 유형은 중규모 이상의 건축물에 적용 가능한 유형이었다. 계획 개념으로서의 모듈러 유형은 실현된 사례는 많지 않았으나, 건축물의 다양성을 수용할 수 있는 유형이며, 플로팅 건축의 영역을 확장하여 플로팅 도시와 같이 보다 큰 규모의 영역에 적용될 수 있는 가능성을 내포하고 있다.

유닛 모듈러 공법의 특성요인 분석 및 시장진출전략 (Marketing Strategy and Influential Factors based on the Attributes of Unit Modular System)

  • 김도민;이정석;김주형;김재준
    • 한국건설관리학회논문집
    • /
    • 제15권1호
    • /
    • pp.78-86
    • /
    • 2014
  • 유닛 모듈러 공법은 공장생산에 의한 공기단축, 품질관리, 친환경성 등 기존공법과 다른 다양한 특징을 가지고 있다. 이러한 특징에도 불구하고 현재 국내에서는 군 병영시설, 학교, 소형주택에만 제한적으로 적용되고 있다. 본 연구에서는 모듈러 공법의 시장 확대 및 활성화를 위해 공동주택을 중심으로 특성요인들에 대한 중요도 및 기술수준을 IPA 기법을 통해 분석하여, 모듈러 시장의 활성화 방안을 제시하였다. 분석결과 유닛 모듈러 공법을 공동주택 시장에 적용함에 있어 사용성 및 경제성 측면의 특성요인들이 중요하게 평가되었으나, 현재 기술수준은 상대적으로 중요도가 낮은 시공성 측면의 특성요인들이 높게 나타났다. 유닛 모듈러 공법을 공동주택 시장에 적용하기 위해서는 시공성 측면의 높은 기술수준을 바탕으로 사용성, 경제성 측면의 특성요인에 대한 보다 집중적인 연구 개발이 필요할 것이다.

인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안 (Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안 (Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발 (Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm)

  • 김민정;박문서;이현수;이정훈;이광표
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.54-64
    • /
    • 2015
  • 모듈러 건축공법은 공장 생산, 운송, 현장설치 프로세스를 통해 기존 현장중심 건축공법에 비해 품질향상 및 공기단축이 가능한 특징을 가지고 있다. 특히 모듈러 유닛의 제작과 시공이 분리되어 수행되기 때문에 다수의 프로젝트가 동시에 수행될 경우 각 프로젝트에 따라 생산해야하는 모듈의 크기, 수량, 납기일, 생산 유형 및 과정을 고려하는 SCM(Supply Chain Management) 관점의 공장 생산 공정 계획 수립이 필요하다. 그러나 현재 모듈러 유닛 공장 생산 계획은 개별 프로젝트 중심으로 수립되고 있어 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 프로젝트 요구조건들을 동시에 고려한 공장 생산계획을 도출하는데 한계가 있다. 따라서 본 연구에서는 다양한 변수 간 상호 연계성 및 제약조건으로 공정 계획 최적화 결과 도출이 가능한 유전자 알고리즘 방법을 통해 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 요구사항이 반영된 모듈러 유닛 공장 생산 공정계획 최적화 수립 모델을 제시하며 이를 사례분석을 통해 검증하였다. 연구 결과, 기존 다중프로젝트의 공장생산계획에 비해 평균 7.9%의 현장설치 공기단축 및 43%의 최대 야적장 이용률 감소가 가능하였다. 향후 본 연구 내용을 바탕으로 제약 조건 범위 확장 및 생산성 데이터 추가가 될 경우 다중 모듈러 건축 프로젝트의 모듈러 유닛 공장 생산 계획 수립과 현장시공프로세스 구축을 동시에 지원할 수 있는 기초 자료로 활용될 수 있다.

모듈러 공법을 적용한 건강생활지원센터 공간계획에 관한 연구 - 기존 사례의 공간 근접도 분석을 통한 공간 유닛화와 모듈화 - (Space Planning of the Health Life Support Center using the Modular Construction Method - Space Unitification and Modularization through Spatial Proximity Analysis of Case Projects -)

  • 장활제;권나현;안용한;안치원
    • 대한건축학회논문집:계획계
    • /
    • 제35권11호
    • /
    • pp.43-52
    • /
    • 2019
  • The purpose of this study is to suggest the use of modular construction method in order to promote the dissemination of the Health Life Support Center of the government, and to suggest the modular unitification and modularization plan for the necessary space data in the initial stage. By analyzing the floor plans of the 50 case projects currently in operation, the 28 required spaces and their spatial proximities are determined. Base on spatial proximities, each space is unitificated into a modular unit and modularized into a modular modules were integrated to modular proposals. As a result of this study, 13 unitificated modular unit floor planes and 3 modularized module floor planes including the staircase unit were proposed. However, future study have needed to study how to apply them to different actual sites and how to reduce cost.

모듈러 건설현장의 단위작업별 안전관리 활동 및 중점 체크사항 제안 (Suggestion of Safety Management Activities and Key Check point for Safety Management in Modular Construction Sites)

  • 전영훈;김균태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2022
  • In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.

  • PDF