• Title/Summary/Keyword: unit watershed

Search Result 325, Processing Time 0.031 seconds

Development of a Flow Duration Curve with Unit Watershed Flow Data for the Management of Total Maximum Daily Loads (수질오염총량관리 단위유역 유량측정자료를 이용한 유황곡선 작성)

  • Park, Jun Dae;Oh, Seung Young;Choi, Yun Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.2
    • /
    • pp.224-231
    • /
    • 2012
  • It is necessary to develop flow duration curve (FDC) on each unit watershed in order to analyze flow conditions in the stream for the management of Total Maximum Daily Loads (TMDLs). This study investigated a simple method to develop FDC for the general use of the curve. A simple equation for daily flow estimation was derived from the regression analysis between the 8-day interval flow data of a unit watershed and the daily flow monitoring data of an adjacent upstream region. FDC can be prepared with the calculation of daily flow by the equation for each unit watershed. An annual and a full-period FDC were drawn for each unit watershed in Guem river basin. Standard flow such as low and ordinary flow can be obtained from the annual FDC. Major percentile of flow such as 10, 25, 50, 75 or 90% can be obtained from the full-period FDC. It is considered that this simple method of developing FDC can be utilized more widely for the calculation of standard flow and the assessment of water quality in the process of TMDLs.

Comparative Study on Evaluating Low-Flow in Ungauged Watershed (미계측 유역에서 저수량 산정 방법 비교 연구)

  • Baek, Kyong Oh
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.1
    • /
    • pp.31-36
    • /
    • 2014
  • In this study, the methodologies for evaluating the low-flow at the ungauged watershed are reviewed and assessed. The ungauged watershed can be classified into different situations such as the partially recorded watershed and the completely ungauged watershed. The extension method and the percentile method are used to evaluated the low-flow at the partially recorded watershed. The drainage-area ratio method and the regional regression method are used at the completely ungauged watershed. These four methods are applied and validated based on the hydrological and geometric data acquired from unit watersheds in Han River basin for TMDLs. In case of partially recorded watershed, the values of low-flow evaluated by the extension method are in better agreement with measured flow-rate rather than those by the percentile method. In case of completely ungauged watershed, the drainage-area method is broadly used to estimate the low-flow. It must be paid attention to consider the treated sewage discharge produced at watersheds when applying the method.

Estimation of Unit Loads Generation for Swine Wastewater by Cage Test (Cage Test를 통한 양돈폐수 발생원단위 설정)

  • Kim, Yong Seok;Park, Jae Hong;Park, Ji Hyoung;Park, Bae Kyung;Oa, Seong Wook
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.3
    • /
    • pp.235-240
    • /
    • 2015
  • To evaluate the unit load generation and discharge, pig cage test was conducted. Feed intake, drink amount, and urine generation increased growth stage (heavy weight) of the pig more great. However, the sum of the urine and manure did not show a significant difference in the growth stages of pigs. Because of the limit of the experiment, e.g., research period, high pigpen temperature, breed-related stress and etc., it could not be derived the results of the four seasons. Therefore, in order to generalize the results, the feed intakes were calibrated using a NRC (National Research and nutritional requirements of pigs from the Commission) standards. The finalized unit load generation and generation amounts of manure and urine were estimated at BOD 104.1 g/head/d, T-N 21.2 g/head/d, T-P 4.9 g/head/d, manure 0.96 L/d, urine 1.66 L/d with consideration of revised feed intake. Compare to the former research results of MOE (Ministry of Environment, 1999) and NIAS (National Institute of Animal Science, 2008), the generation amounts of manure and urine were similar to the NIAS's values. In case of unit load generation, BOD and T-N were almost similar in all of them. However, the T-P unit load generation of MOE was more difference, e.g., 2.5 times high, compare to this study.

Characteristics of Pollutant Loading in Namdae-cheon Watershed

  • Choi, Jin-Kyu;Son, Jae-Gwon
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.7
    • /
    • pp.49-56
    • /
    • 2003
  • Nonpoint source pollutant loading from watershed may cause a problem to the water quality of the reservoir and stream. The characteristics of stream flow and water quality were monitored to investigate the runoff loading of the Namdae-cheon watershed from May in 1999 to October in 2003. Stage-discharge rating curve at the stream gauging site was established, and annual stream runoff of the study watershed was estimated as 499.4∼1,330.8mm during four years. The concentrations of total-nitrogen and total-phosphorus of stream water quality ranged from 0.76 to 6.95mg/L and from 0.0010 to 0.2276 mg/L, respectively, where T-N was generally higher than the water quality standard 1.0 mg/L for agricultural water use. The loads by unit generation of pollutant mass with respect to population, livestock, land use in this watershed were calculated. The runoff pollutant loadings by concentrations of total-N and total-P were estimated during study period, where the annual runoff loading of total-P was much less than the load by pollutant mass unit generation. The relations between stream discharge and water quality were analysed, and there was a high correlation for total-N but low for total-P. These results will be used to develop the monitoring techniques and water quality management system of agricultural watershed.

Determination of Flood Hydrograph by Remote Sensing Techniques in a Small Watershed (원격탐사 기법에 의한 소유역의 홍수 수문곡선 결정)

  • 남현옥;박경윤;조성익
    • Korean Journal of Remote Sensing
    • /
    • v.5 no.1
    • /
    • pp.13-27
    • /
    • 1989
  • In recent years satellite data have been increasingly used for the analysis of floodprone areas. This study was carried out to demonstrate the usefulness of repetitive satellite imagery in monitoring flood levels of the Pyungchang watershed. Runoff characteristics parameters were analyzed by Soil Conservation Service(SCS) Runoff Curve Number(RCN) based on Landsat imagery and Digital Terrain Model data. The RCN average within the watershed was calculated from RCN estimates for all the pixels(picture elements) and adjusted by antecedent precipitation conditions. The direct runoff hydrograph was derived from the unit hydrograph using SCS dimensionless unit hydrograph and effective rainfalls estimated by the SCS method. In comparsion of the direct runoff hydrograph with the measured rating curve their peak times differ by one hour and peak discharges differ by 5.9 percents of the discharge from each other. It was shown that repetitive satellite image could be very useful in timely estimating watershed runoffs and evaluating ever-changing surface conditions of a river basin.

A Synthesis of Unit Hydrograph by a Correlation Analysis between the Basin Characteristics and the Runoff-Characteristics - Han and Geum River Basin - (유역특성과 유출특성간의 상관관계 해석에 의한 단위유량도의 합성 - 한강 및 금강유역 -)

  • 윤용남;선우중호
    • Water for future
    • /
    • v.8 no.1
    • /
    • pp.61-79
    • /
    • 1975
  • An attempt is made to develope a scheme for synthesizing unit hydrograph for any arbitrary small watershed in the Han or Geum River basin, which can be applied in determining various sizes of design flood for flood control prijects. Stage gauging stations, seven in the Han and five in the Geun River basin with rating curves, were selected as subbasins for the analysis. Unit hydrographs of 2-hour duration were derived for several heavy storm events using the storm and the corresponding flood runoff data for each subbasin. The Clark method programmed by the Hydrologic Engineering Center, U.S. Corps of Engineers, was utilized for derivation of instantaneous unit hydrographs which were, in turn, converted into 2-hour unit hydrograph. By averaging the 2-hour unit hydrographs from several storm events a representative 2-hour unit hydrograph was determined for each subbasin and hence a separate derivation of dimensionless unit hedrograph was also possible for the Han and Geum River basins. The physiographic characteristics such as stream length, distance to the centroid of each watershed were correlated with the characteristic parameters of the derived unit hydrograph for the subbasins within two large basins. correlation analyses between the characteristic parameters were also made. These correlation analyses resulted a series of four equations and a dimensionless unit hydrograph for the two large basins, which made it possible to draw a synthetic 2-hour unitgraph for any small watershed within the Han or Geum River basin. A detailed procedure for aplying the derived method for an arbitrary basin is summarized with one sample computation for each of the two basins. A comparison of the actually derived 2-hour unit hydrogrograph and the synthesized one showed a fair agreement. A recommendation is made for the further study.

  • PDF

Evaluation of Eco-Village Planning Characteristics by Introducing Landscape Unit System (경관단위체계를 도입한 생태마을계획의 특성 평가)

  • 황보철;이명우
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.3
    • /
    • pp.60-75
    • /
    • 2004
  • The purpose of this research is to evaluate five types of eco-village planning in order to introduce a landscape unit concept and theory in Korea. Although they had different backgrounds and motives of eco-villages planning, their common goal is to always maintain ecological planning and design in their villages. As concrete methods of ecological planning, we suggest three fundamental planning theories. 1. The boundary of a plan unit should be a watershed. 2. The survey and analysis of village ecotopes should be done in that defined watershed. 3. These results should be applied in the site and lot planning of eco-villages. These 3 steps should be done in a process and relevantly. In the evaluation of the five eco-village planning types, we found three results. 1. On a viewpoint of watershed, most planners recognized a watershed in survey and planning stages unconsciously. But they did not mention watersheds concretely and did not use this concept in the planning stage. 2. They did not define the concept of ecotope, but most planners recognized land-uses and vegetations of villages and vicinities as ecotopes. Also these could be proper ecotopes, but they did not use these compartment of ecotopes in the planning of ecosystem structure in villages. In addition, they did not deeply survey and analyze the ecotopes of villages and its vicinity. 3. On the viewpoint of sites and lots planning, they did not relevantly use the characteristics of watersheds and ecotopes in sites and lots planning. Therefore, they failed to implement the indigenous lots and subdivisions plan. In the size of lots and sites, they did not seriously consider the carrying capacity of ecosystem. We hope that our suggestion about the establishment of eco-villages planning is a fundamental theoretical framework of ecological planning in future eco-village planning.

Estimation of Design Flood Considering Time Distribution of Rainfall (강우 시간분포를 고려한 설계홍수량산정)

  • Park, Jae-Hyun;Ahn, Sang-Jin;Hahm, Chang-Hahk;Choi, Min-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1191-1195
    • /
    • 2006
  • Now days, heavy storm occur to be continue. It is hard to use before frequency based on flood discharge for decision that design water pocket structure. We need to estimation of frequency based on flood discharge on the important basin likely city or basin that damage caused by flood recurrence. In this paper flood discharge calculated by Clark watershed method and SCS synthetic unit hydrograph method about upside during each minute of among time distribution method of rainfall, Huff method choosing Bocheong Stream basin that is representative basin of International Hydrologic Project (IHP) about time distribution of rainfall that exert big effect at flood discharge estimate to research target basin because of and the result is as following. Relation between probability flood discharge that is calculated through frequency analysis about flood discharge data and rainfall - runoff that is calculated through outward flow model was assumed about $48.1{\sim}95.9%$ in the case of $55.8{\sim}104.0%$, SCS synthetic unit hydrograph method in case of Clark watershed method, and Clark watershed method has big value overly in case of than SCS synthetic unit hydrograph method in case of basin that see, but branch of except appeared little more similarly with frequency flood discharge that calculate using survey data. In the case of Critical duration, could know that change is big area of basin is decrescent. When decide time distribution type of rainfall, apply upside during most Huff 1-ST because heavy rain phenomenon of upsides appears by the most things during result 1-ST about observation recording of target area about Huff method to be method to use most in business, but maximum value of peak flood discharge appeared on Huff 3-RD too in the case of upside, SCS synthetic unit hydrograph method during Huff 3-RD incidental of this research and case of Clark watershed method. That is, in the case of Huff method, latitude is decide that it is decision method of reasonable design floods that calculate applying during all $1-ST{\sim}4-TH$.

  • PDF

Habitat Evaluation of Japanese Black Bear using GIS

  • Masuyama, Tetsuo;Yamamoto, Toshiharu;Hara, Keitarou;Yasuda, Yoshizumi
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.1134-1136
    • /
    • 2003
  • In this research, GIS based evaluation methods were applied to habitats of Japanese black bear (Ursus thibetanus japonicus Schlegel) in northern Honshu. The study area was divided into 828 small watershed units , and five GIS indexes, Vegetation Type(V.T.), Extent of Forest Cover (E.F.C.) Slope Incline (S.I), Average Altitude (A.A.) and Road Density(R.D.), were used to evaluate each watershed unit in terms of suitability as black bear habitat. In addition, Interspersion and Juxtaposition spatial indices were calculated for each watershed unit. The results clearly identified the regions with the most suitable habitats, indicating that this methodology is suitable for application to various environmental planning efforts, such as regional development master plans, project-specific environmental impact assessments, species management plans and biodiversity conservation plans.

  • PDF

Mapping of Functionally Reduced Potential Area for Improving Utilization of Agricultural Reservoir in Terms of Environmental Planning (환경생태계획 측면에서 농업용저수지 활용성 제고를 위한 기능저하 잠재지역 맵핑 연구)

  • Yeum, Jung-Hun
    • Journal of Environmental Science International
    • /
    • v.28 no.11
    • /
    • pp.1027-1032
    • /
    • 2019
  • This study aimed to analyze the prioritized area for the functional change of agricultural reservoir according to the rapid urbanization and social changes through the mapping method. Changwon-si, Gimhae-si, and Jinju-si in Gyeongnam province were selected as the study area, considering the results of land-use and cluster analysis. As the planning unit of management area, watershed was used and land coverage map from 1975 to 2015 were analyzed for changes of land use. The reduction ratio (%) of farmland was calculated for identifying the changes in 2013 compared to 1975. As a result, the reduction ratio was 11.9% for Changwon-si, 12.2% for Gimhae-si and 9.3% for Jinju-si, and the number of watershed having functionally reduced potential-area was relatively high in the proportion to the city size.