• 제목/요약/키워드: unit costs

검색결과 604건 처리시간 0.028초

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

아파트 개발 프로젝트의 수익 리스크 관리모델에 관한 기초연구 (A Basic Study on the Development of Profit Risk Management Model for Apartment Projects)

  • 손승현;이성호;한범진;나영주;김지명
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.215-216
    • /
    • 2022
  • Profit, the performance of an apartment development project, is directly affected by the sales ratio, unit sale price, financial costs, land costs and construction costs. However, these factors fluctuate in response to changes in the environment, including various stake holders, and the profits fluctuate as a result. In order to ensure that profits are managed within target levels, these factors must be able to be predicted, controlled and monitored and managed up to the start, sale, and end stages of the project. The purpose of this study is to develop a profit risk management model for apartment development projects. The results of this study will contribute to the establishment of academic basis for the dynamic management of project profits that fluctuate with time and environment. And in practice, it will help project developers manage their business revenue to the proper level. In addition, the risks that occur from time to time can be identified quantitatively and visually, and it is expected that it will be easier to derive consensus points for smooth business progress by reducing conflicts of interest among stakeholders.

  • PDF

A Distributed Power Allocation Scheme for Base Stations Powered by Retailers with Heterogeneous Renewable Energy Sources

  • Jeon, Seung Hyun;Lee, Joohyung;Choi, Jun Kyun
    • ETRI Journal
    • /
    • 제38권4호
    • /
    • pp.746-756
    • /
    • 2016
  • Owing to the intermittent power generation of renewable energy sources (RESs), future wireless cellular networks are required to reliably aggregate power from retailers. In this paper, we propose a distributed power allocation (DPA) scheme for base stations (BSs) powered by retailers with heterogeneous RESs in order to deal with the unreliable power supply (UPS) problem. The goal of the proposed DPA scheme is to maximize our well-defined utility, which consists of power satisfaction and unit power costs including added costs as a non-subscriber, based on linear and quadratic cost models. To determine the optimal amount of DPA, we apply dual decomposition, which separates the master problem into sub-problems. Optimal power allocation from each retailer can be obtained by iteratively coordinating between the BSs and retailers. Finally, through a mathematical analysis, we show that the proposed DPA can overcome the UPS for BSs powered from heterogeneous RESs.

$\cdot$재생에너지 원별 경제성 분석 - 태양광, 풍력, 소수력 발전을 중심으로 - (Analysis of Economic Feasibility of New & Renewable Energies)

  • 김진오;김정완;부경진
    • 신재생에너지
    • /
    • 제1권1호
    • /
    • pp.79-86
    • /
    • 2005
  • This study conducted an analysis of economic feasibility with unit generating costs calculated based on scenarios of capacity factors, discount rates, government supporting rates, installation costs. However, It Is clear that few new and renewable energies can meet the tariffs [government purchasing prices] set by the government in light of the current market reality. Without the government support, solar PV is not economically feasible at the tariff of \716.40/kWh. in the case of wind Power, the current tariff of \107.66/kWh is not enough to make it competitive except for a mid- and large-scale wind farm The analysis showed that even small hydro is not economically acceptable at the current tariff of \73.69/kWh.

  • PDF

냉장창고설비의 픽킹 및 재 보충설비계획문제의 연구 (A Study on Refrigerate Warehouse Facility Performance Planning for Picking and Replenishing Facility Using Simulation Method)

  • 황흥석;조규성;최배석
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2003년도 춘계공동학술대회
    • /
    • pp.1035-1041
    • /
    • 2003
  • Recent studies among various activities taking place in order-picking warehouse system have shown various researches to reduce the order-picking costs occupying more than half the total costs. One way of improving the warehouse system performance is to separate from a picking area and a reserve area in one unit rack. This study is concerned on the performance evaluation model for picking and replenishing facility of refrigerated warehouse using simulation method. In this study, we developed a mathematical model to compute the system performance solve this problem using simulation method. We demonstrate the system performance using AutoMod Simulator and verify the results to compare mathematical results of the system performance of warehouse system. A systematic approach proposed n this study for an optimal planning of order-picking warehouse is known as an effective method for planning of order-picking warehouse and a performance evaluation problem considering both picking and replenishment.

  • PDF

고속철도차량 시스템의 비용구조 분석에 대한 사례 연구 (Case study on the costs structure analysis for the High Speed Rolling Stock system)

  • 최석중;김문홍
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1623-1629
    • /
    • 2010
  • The high speed rolling stock system considerably belongs to a special industry which requires large-scale investment cost but the recovery term is long. Therefore, to guarantee risk and possibility of technological success in initial investment, tools concerned with various expecting methods like life cycle costs analysis and credibility management are used. In view of this characteristics, the cases on cost structure for HSR RS previously invested should be studied and the method to appropriately allocate the life cycle of each sub-system like arrangement unit, electric device, braking device, door and car body should be realized. Moreover, the environmental aspects of main manufacturer and parts supplier can be checked. This study, through the case study for HSR cost structure in introduction and operational stage of KTX, aims to seek for the method to adapt to environmental changes like EU railway industry of which object is to acquire global market competitiveness by integrating manufacturing and operation of RS and the regulation and operation of IRIS which is performed in Europe.

  • PDF

박판 프리캐스트 콘크리트 영구거푸집 시스템 연구 (II) (A Study of Permanent Form System by Thin Precast Concrete Panel (II))

  • 남기룡;정문영;정문열;서치호;김윤일
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1997년도 가을 학술발표회 논문집
    • /
    • pp.749-754
    • /
    • 1997
  • Nowadays domestic building market has undergone several changes. Labor costs are too high and materials are in short supply. These raised building costs and therefore lowered productivity. At this point it is the best way to reduce manual labor and find alternative materials that can improve productivity. In the building process form work take the most part of it. So many formwork systems were developed to reduce the construction period and labor cost. But their technical improvements just limited to adjust form shape-the role of form is not changed. This research developed a new formwork systems that can function to unify or minimze the unit process with cast-in-place type permanent form. In former study (reported in '97 spring seminar), we did the assembling test with column and beam clamps. Furthermore, In this paper, we examined the total systems of form erections and evaluated the structural performances.

  • PDF

계획기간의 연동적 고려 경우의 추계적 생산계획 (A Stochastic Production Planning Problem in Rolling Horizon Environment)

  • Sung, C. S.;Lee, Y. J.
    • 한국경영과학회지
    • /
    • 제14권2호
    • /
    • pp.67-74
    • /
    • 1989
  • This paper considers single-product production and inventory management problem where cumulative demands up to each time period are mutually independent random variables(known) having continuous probability distributions and the associated cost-minimizing production schedule (when to produce and how much to produce) need be determined in rolling horizon environment. For the problem, both the production cost and the inventory holding and backlogging costs are included in the whole system cost. The probability distributions of these costs are expressed in terms of random demands, and utilized to exploit a solution procedure for a production schedule which minimizes the expected unit time system cost and also reduces the probability of rist that, for the first-period of each production cycle (rolling horizon), the cost of the "production" option will exceed that of the "non-production" one. Numerical examples are presented for the solution procedure illustration.cedure illustration.

  • PDF

일반화된 2단계 재고체계에서의 최적주문정책 (The Optimal Ordering Policy for the Generalized Two-Stage Inventory System)

  • 정남기;차동원
    • 한국경영과학회지
    • /
    • 제4권1호
    • /
    • pp.25-31
    • /
    • 1979
  • We consider the optimal ordering policy for a single-product two-stage inventory system where the main assumptions are as follows: (i) constant continuous demand only at stage 2, (ii) constant input (production) rate at stage 1, (iii) instantaneous delivery (transportation) from stage 1 to stage 2, (iv) backlogging is allowed only at stage 2, (v) an infinite planning horizon. Costs considered are ordering and linear holding costs at both stages, and linear shortage cost only at stages 2. By solving 9 different case problems, we have observed the general from of the optimal ordering policies for our model which minimizes the total cost per unit time. It is noticeable from this observation that the questionable but more often than not adopted assumption by many authors in determining the optimal potimal policy for multistage inventory systems, that the ordering (lot) sizes at each stage remain constant thruout the planning horizon, is not valid.

  • PDF

통합적 엑서지에 의한 발전 플랜트의 열경제학적 해석 (Thermoeconomic Analysis of Power Plants with Integrated Exergy Stream)

  • 김덕진;이현수;곽호영
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2000년도 춘계학술대회논문집B
    • /
    • pp.871-878
    • /
    • 2000
  • Exergetic and thermoeconomic analysis were performed for a 500-MW combined cycle plant and a 137-MW steam power plant without decomposition of exergy stream of matter into thermal and mechanical exergies. The calculated costs of electricity are almost same within 0.5% as those obtained by the thermoeconomic method with decomposition of exergy into thermal and mechanical exergies of the combined cycle plant. However for the gas-turbine cogeneration plant having different kinds of products. the difference in the unit costs of products, obtained from the two methodologies is about 2%. Such outcome indicates that the level at which the cost balances are formulated does not affect the result of thermoeconomic analysis, that is somewhat contradictory to that concluded previously.

  • PDF