• 제목/요약/키워드: underpassing tunnel

검색결과 2건 처리시간 0.015초

Effect of new tunnel construction on structural performance of existing tunnel lining

  • Yoo, Chungsik;Cui, Shuaishuai
    • Geomechanics and Engineering
    • /
    • 제22권6호
    • /
    • pp.497-507
    • /
    • 2020
  • This paper presents the results of a three-dimensional numerical investigation into the effect of new tunnel construction on structural performance of existing tunnel lining. A three-dimensional finite difference model, capable of modelling the tunnel construction process, was adopted to perform a parametric study on the spatial variation of new tunnel location with respect to the existing tunnel with emphasis on the plan crossing angle of the new tunnel with respect to the existing tunnel and the vertical elevation of the new tunnel with respect to the existing one. The results of the analyses were arranged so that the effect of new tunnel construction on the lining member forces and stresses of the existing tunnel can be identified. The results indicate that when a new tunnel underpasses an existing tunnel, the new tunnel construction imposes greater impact on the existing tunnel lining when the two tunnels cross at an acute angle. Also shown are that the critical plan crossing angle of the new tunnel that would impose greater impact on the existing tunnel depends on the relative vertical location of the new tunnel with respect to the existing one, and that the overpassing new tunnel construction scenario is more critical than the underpassing scenario in view of the existing tunnel lining stability. Practical implications of the findings are discussed.

하저터널 품질확인 및 유지관리 계측 연구 (A Case Study for Quality Confirmation and Maintenance Monitoring of Tunnel Underpassing the Han River)

  • 우종태;양태선;구재동
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권2호
    • /
    • pp.185-194
    • /
    • 1998
  • This paper shows a case study on quality confirmation and maintenance monitoring of the tunnel underpassing the Han River. First of all, when it comes to the quality confirmation, soil investigation techniques and shotcrete core test will be improved. On the construction stages, quality control procedures are needed. Second, on the maintenance monitoring, it is the main tool to control stability and safety of the tunnel structures throughout the construction period. On the geotechnical monitoring instrumentation, some considerations such as installation of monitoring sections in time, immediate base readings, adequate reading frequency, etc - shall be improved.

  • PDF