The failure occurs in the system of the underground transmission line, the time of restoration is very long, the damage from stopping power supply is very serious and the cost of restoration is very great. because of these problems, the system and equipment must be protected from every electrical failure by installing protection unit. This study is summarized and compared the effects of configuration method of cable protection device with respect to surges in EHV (Extra High Voltage) underground transmission system.
This is intending to introducdine the pipe type 161KV underground cable system in Capital City of Seoul which will be constructed in 1972 or 1973 by Korea Electric Co using the AID loan and Won currency. In order to make readers to have an easy understanding and a clear view of underground cable transmission line, the first part will be for the introduction of the description on future underground cable system by Mr. E.H.F inch appeared on 1969 Sept. Consulatant Engineer. the second part will introduce our 161KV underground cable system in Seoul and it's feasibility study, and the third part will mention calculation methods of electrical properties of pipe type cable and the results of calculation of our own system.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.39
no.6
/
pp.491-496
/
2021
In line with the modern era in which the safety of underground facilities and the use of underground information are increasingly emphasized, the state is pushing for more precise and accurate underground spatial information to be secured and utilized. Therefore, we need to pay more attention to subsurface geospatial data. In the future, the Ministry of Land, Infrastructure and Transport will actively utilize the 15 types of Integrated Underground Geospatial Information Map(6 types of underground facilities, 6 types of underground structures, 3 types of ground) that the Ministry of Land, Infrastructure and Transport is building as three-dimensional underground spatial information, and contribute greatly to improving national safety and convenience in underground construction. expected to do However, when a site manager requests an Integrated Underground Geospatial Information Map with a mobile device, if the large-capacity integrated underground space map is not quickly transmitted over the wireless section and is not serviced, it causes inconvenience to the site manager and delays work. In this paper, the goal of this paper is to enable field managers to quickly receive a tiled Integrated Underground Geospatial Information Map with minimal information exchange. Therefore, the tiling system is configured according to the dataset for high-speed Mobile Integrated Underground Geospatial Information Map transmission. In addition, a transmission system for the Mobile Integrated Underground Geospatial Information Map is established, and a TCP/IP (Transmission Control Protocol/Internet Protocol)-based spatial information tiling transmission protocol dedicated to the on-site Integrated Underground Geospatial Information Map is developed.
Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
/
1999.02a
/
pp.129-133
/
1999
In recent years, there is a growing needs for large capacity underground power transmission lines with the increasing demand of electric power in the urban area, where various environmental limitations are imposed on the overhead transmission lines. But it is difficult to get the space for the underground power transmission cables because of complicated distributions of underground public facilties such as subway, water pipes, gas etc. As the superconducting power cables have the large power transmission capacity, the high power transmission capacity, the high power transmission density, and low loss characteristics in comparison with a conventional cable, it would be a solution to meet the increased power demand. In this paper, the results of the conceptual design and analysis of power system of HTS power transmission cable is described.
This paper describes that the effect on the other system is generated by the single line to ground fault of the underground transmission systems and distribution systems established the common ground in trefoil. Each system is modeled by EMTP/ATPDraw and the system carry out simulations according to the various values of common ground to analyse. In this study, the result of analysis based on simulation suggests protection method and ground system of each system.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.52
no.12
/
pp.713-721
/
2003
This paper analyzes the switching overvoltage occurred on 345kV underground power cable system as well as combined transmission system using EMTP. Cable length and closing time, preinsertion resistance have effect on switching overvoltage. Therefore, this paper analyzes the switching overvoltage occurred on conductor and sheath with change of those parameters. Specially, the cross bonding position becomes discontinuity point because of the difference between surge impedance of metal sheath and that of lead cable. Thus, the transmission and the reflection of traveling wave complexly occur at this connection point. According to these influences, voltage between sheath and earth as well as voltage between joint boxes rise. Time to crest point of switching overvoltage is longer than lightning overvoltage. Even though the voltage induced by switching surge is smaller than lightning surge, that voltage may have serious effect on the metal sheath. Therefore, this paper also analyses the reduction effect of switching overvoltage when the preinsertion resistance of circuit breaker is considered.
Kim, Nam-Yeol;Lee, Jong-Beom;Jang, Seong-Hwan;Gang, Ji-Won
The Transactions of the Korean Institute of Electrical Engineers A
/
v.51
no.10
/
pp.502-509
/
2002
In the analysis of lightning surges, transmission towers are usually simulated by ATPDraw. The modeling of transmission towers is an essential part of the traveling wave analysis of lightning surges in transmission lines. The tower model is applied to the 154kV transmission tower of which surge performance characteristics are measured Tower surge response is computed using nonuniform, single-phase line models for both transmission tower and ground wire. The overvoltage will effect to the underground transmission line. The underground cable is combined by duct and trefoil type, and the each arrester is placed on the leading-in tube and outgoing tube. This paper analyzed the effect of lightning overvoltage on the underground cable system.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.6
/
pp.764-769
/
2014
This paper describes sheath voltage limiter(SVL) transient characteristics by switching overvoltage considering single point bonding in underground transmission cables. The crossbonding system is generally used for grounding methods of underground transmission system. However, the single point bonding system is used in selective area which is difficult to consist of crossbonding major section. The sheath voltage limiters are connected between joints in the single point bonding. Specially, the high overvoltage might be generated in that section as well as the aging of sheath voltage limiter might be progressed by various electrical stress including lightning overvoltage, switching overvoltage and power frequency overvoltage. Therefore, in this paper, the switching overvoltage characteristics in underground cables are firstly analysed using EMTP simulation. Then, the switching overvoltage of sheath voltage limiter is also studied in single point bonding. Finally, the reduction method of sheath voltage limiter switching overvoltage is proposed by various simulation studies including circuit breaker operating order.
In this study, travel time data collection of mine equipments was conducted in an underground mine using a reverse Radio Frequency IDentification (RFID) system. In the reverse RFID system, RFID readers and antennas are mounted on mine equipments, and RFID tags are attached to the underground mine gallery. Indoor experiments were performed to analyze how RFID reader transmission power levels affect tag readable area and tag recognition rates. The results showed that travel time measurement become precise when the reader transmission power was reduced, however tag recognition rates were reduced. The field experiments indicated that setting the reader transmission power to 28 dBm maintained the tag recognition rate while minimizing the tracking location error. In addition, the results revealed that the reverse RFID system can be used successfully in an underground mine to collect the travel time data of haulage trucks.
Kim, Jin;Kang, Ji-Won;Jang, Tae-In;Yang, Byeung-Mo;Park, Jun-Woo;Park, Hung-Sok;Yoon, Hyung-Hee
Proceedings of the KIEE Conference
/
2009.07a
/
pp.383_384
/
2009
After the 1970s, the importance of underground transmission systems increased and the construction rate of underground transmission lines also showed increasing trends each year, especially in metropolitan areas. Accordingly the social ripple effects are very large and wide when the fault occurs in underground power system, and the amount of time and money spent to restore the system also increases. So we must ensure stable operation and long-term reliability of the facilities. In Korea's case, long-term reliability tests for EHV power cables and accessories progressed poorly because equipment was not compatible for long-term reliability tests. Therefore we planned to construct a long-term reliability test field for EHV underground cables in order to ensure international quality reliability and optimal power cable operation techniques. The Gochang Underground Cable Test Field is under construction, funded by the Korean government, the govenment's union investment department, KEPCO, KERI and three private cable corporations. This project began in March, 2005 and will be completed by February, 2010. It is designed to promote joint research by incorporating several types of test equipment, construction of operating facilities, and being an internationally certified authority.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.