• Title/Summary/Keyword: underground temporary material

Search Result 4, Processing Time 0.019 seconds

Study under productivity measurement and verification of the underground temporary material installation work by simulation technique (시뮬레이션을 활용한 지하가설물 설치작업의 생산성 측정 및 검증에 관한 연구)

  • Bae Yeon-Jin;Park Sang-Hyuk;Han Seung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.427-432
    • /
    • 2004
  • As it is keen competition of a construction market and the recognition that increases construction productivity for maintaining competitiveness, it is increased importance of an interest about productivity and efficiency in the construction industry. This study measures productivity through the instance of investigation that the existing productivity measurement method was utilized and presented a work improvement matter based on the measured contents. The proposed improvement matter is verified through a simulation technique. The purpose of this paper is for a field supervisor to have presented the way that a selection does the most suitable work method to be suitable for a situation, and can forecast production, though a simulation technique is not the most alternative that considered field condition in analyzing productivity measurement.

  • PDF

Sulfide-rich mine tailings usage for short-term support purposes: An experimental study on paste backfill barricades

  • Komurlu, Eren;Kesimal, Ayhan
    • Geomechanics and Engineering
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2015
  • Barricade failures generally occur at the early times of paste backfill when it is fresh in the stopes. The backfill strength increases and need for barricading pressure decreases as a result of the hydration reactions. In this study, paste backfill barricades of Cayeli copper mine were investigated to design cemented mineral processing plant tailings as barricade body concrete. Paste backfill in sub-level caving stopes of the mine needs to be barricaded for only four or five days. Therefore, short term strength and workability tests were applied on several cemented tailings material designs. Barricade failure mechanisms, important points of barricade designing and details of the new concrete material are explained in this work. According to the results obtained with this experimental study, the tailings were assessed to be used in concrete applied as temporary supports such as cemented paste backfill barricades.

A Study on the Performance Evaluation Method of Waterproofing-Seal as Leakage Cracks Repairing Material using on the Underground Structure (지하구조물에 적용하는 누수균열 보수용 방수씰의 성능평가 방법에 관한 연구)

  • Kwon Shi Won;Kwon Kee Joo;Lee Jong Yong;Oh Sang-Keun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.652-655
    • /
    • 2004
  • In these days, repair materials for leakage cannot help but being taken in temporary way without any noticeable countermeasure. This kind of repair is socially criticized many times that is defective construction even if tills costs a lot. It was not arrange the standard for performance evaluation test method and quality maintenance for materials, even it has been used various injection repairing agent. In conclusion, We suggest that the test method for repair materials for leakage to establish the leakage repairing technology as increase of structure demand, so that the necessity of the establishment of the quality control standard and the performance testing way on the relevant water-proof seal is increasing a lot to regulate the water-proof technology and the leakage repair technology.

  • PDF

The Effect of Composite Ratio and Wall Thickness on the Shear Behavior of Composite Basement Wall (합성율과 벽체두께가 합성지하벽의 전단거동에 미치는 영향)

  • Seo, Soo-Yeon;Kim, Seong-Soo;Yoon, Yong-Dae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.1
    • /
    • pp.93-101
    • /
    • 2010
  • When doing underground excavation works for the purpose of constructing large underground structures for a building in the limited space in downtown area, the stability of the adjacent ground must be top priority, and to accomplish this, it is essential to review the retaining wall construction carefully. H-Pile, which has been mainly used as a stress-carrying material in temporary earth-retaining structures, is most likely to be abandoned after completion of the works for the basement exterior wall in relation to contiguous bored piles, so it will result in a waste of material. To improve this situation, Basement Composite Wall where H-Pile and basement wall are compounded, has been developed. This wall is being used most frequently in many local construction sites. In this study, five specimens are made in order to evaluate the shear resistance of the basement composite wall and tested. Test parameter is the composition ratio and wall thickness according to shear connectors. Test result shows that the shear strength is improved when the composite ratio is increased but the magnitude is not much. A formula, which considers the contribution of concrete, web of H-pile as well as flange' effect in calculation of shear strength of composite basement wall, is suggested and used to calculation of the strength of specimens. It is found that there is a good co-relation between test result and the calculated one by the formula.