A Study on the Water Spray Distribution in Underground Culvert (공동구내 분무분포에 관한 연구)

  • Kim, Yeob-Rae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.3 s.14
    • /
    • pp.83-87
    • /
    • 2004
  • In underground culvert are established main and basic facilities for electric power, communication, gas and heating pipe etc. In the future the use of underground culvert will be enlarged and the peril of fire will be increased. Thus it is necessary to make a general plan to prevent fire. The skills to prevent fire in underground culvert will be accumulated by the spray distribution of the nozzle and domestic skills in fire fighting will be upgraded. It will also contribute to the construction of common small fire fighting system suitable to the domestic surrounding and the growth of domestic skills for fire fighting and disaster prevention.

Real-scale field testing for the applicability examination of an improved modular underground arch culvert with vertical walls

  • Tae-Yun Kwon;Jin-Hee Ahn;Hong-duk Moon;Kwang-Il Cho;Jungwon Huh
    • Advances in concrete construction
    • /
    • v.15 no.6
    • /
    • pp.377-389
    • /
    • 2023
  • In this study, an improved modular arch system with the lower arch space composed of a precast arch block and an outrigger was proposed as an underground culvert, and its applicability and structural behaviors were confirmed. This modular arch culvert structure with vertical walls was designed using precast blocks and by adjusting the placement spacing of concrete blocks to the upper part form an arch shape and the lower part form a vertical wall shape, based on previously researched modular arch systems. Owing to the vertical wall of the proposed modular arch system, it is possible to secure a load-carrying capacity and an arch space that can sufficiently resist the earth pressure generated from the backfill soil and loading on the arch system. To verify the structural characteristics, and applicability of the proposed modular precast arch culvert structure, a full-scale modular culvert specimen was fabricated, and a loading test was conducted. By examining its construction process and loading test results, the applicability and constructability of the proposed structure were analyzed along with its structural characteristics. In addition, its the structural predictability and safety for the applicability were evaluated by comparing the construction process and loading test results with the FE analysis results.

Development of CAD System for 2Cell Box Culvert (2연 전력구의 자동화 설계)

  • 송영철;최홍식;노병철;우상균
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1996.10a
    • /
    • pp.322-329
    • /
    • 1996
  • The objective of this study is to develop the CAD system for 2 cell box culvert by ultimate strength design method. C-language & AutoCAD Rl2 were used to create user-friendly computing environment. Consequently, users can easily design 2 cell box culvert under the various conditions, such as design load, total fill depth, underground water level, strength of concrete, and so forth. This system is believed to improve the efficiency and economy by the batch processing of structural analysis, quick drafting and computation of material quantity in the 2 cell box culvert design.

  • PDF

Mechanical behaviour of waterway culvert structure assembled by precast segments (프리캐스트 세그먼트를 이용한 조립식 수로암거구조물의 역학적 거동 특성)

  • Lee, Gyu-Phil;Hwang, Jae-Hong;Shin, Hyu-Sung;Hong, Se-Kyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.193-200
    • /
    • 2010
  • Due to the characteristic of culvert structure, the standard section of the culvert has been established and applied in field. However, this becomes a limitation in selecting a section design corresponding to various field conditions although it can improve the design and applicability of culvert structure. In order to overcome this limitation, we have developed the design and application technology of culvert structure corresponding to the field conditions that various shapes of culvert structure can be covered by assembly of precast segments. Because the structural characteristics of assembling-type waterway culvert structure, the thickness of structure and amount of reinforcing rods can vary according to the fixation or internal hinge status in the connection part of precast segments. This has a strong influence on the applicability and economic efficiency of culvert structure. Accordingly, in order to suggest a reasonable modeling technique of segment connection parts, this study has conducted the field experiment and numerical analysis. According to the results of field experiment and numerical analysis, the slab, wall and base slab with mortar splice sleeves have shown that the assembling-type of waterway culvert structure behaves like an integrated structure.

Probabilistic service life of box culvert due to carbonation of concrete cover

  • Woo, Sang-Kyun;Chu, In-Yeop;Lee, Yun;Lee, Byung-Jae
    • Advances in concrete construction
    • /
    • v.12 no.6
    • /
    • pp.517-525
    • /
    • 2021
  • More underground structures are increasingly being constructed such as box culverts for electric power transmission, and the life extension of these structures is very important. It is well known that the steel embedded in concrete is usually invulnerable to corrosion because the high alkalinity of the pore solution in concrete generates a thin protective oxide layer on the surface of the steel. Recent observations in the field and experimental evidence have shown that even steel in concrete can be corroded through the carbonation reaction of cover concrete. Carbonation-induced corrosion in concrete may often occur in a high carbon dioxide environment. In this study, the risk of carbonation of underground box culverts in Korea was evaluated by measuring the car¬bonation rate and concrete cover depth in the field. Then, the carbonation-free service life for the cover depth of the steel was calcu¬lated with in situ information and Monte Carlo simulation. Additionally, an accelerated carbonation test for a cracked beam specimen was performed, and the effect of a crack on the service life of a box culvert was numerically investigated with Monte Carlo simulation based on experimental results.

Case Study of Geogrid Reinforcement in Runway of Inchon International Airport (지오그리드를 활용한 인천국제공항 활주로 보강사례)

  • 신은철;오영인;이규진
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.11c
    • /
    • pp.105-116
    • /
    • 1999
  • The Inchon International Airport site was formed by reclaimed soil from the sea. The average thickness of soft soil Is about 5 m and most of soft soils are normally consolidated or slightly over consolidated. There are many box culverts which are being constructed under the runways in the airfield. Sometimes, differential settlement can be occurred in the adjacent of box culvert or underground structures at the top layer of runway Soil compaction at very near to the structure is not easy all the time. Thus, one layer of geogrid was placed at the bottom of lean concrete layer for the concrete paved runway and at the middle of cement stabilized sub-base course layer for the asphalt paved runway. The length of geogrid reinforcement is 5m from the end of box culvert for both sides. The extended length of geogrid was 2m from the end of backfill soil in the box culvert. The tensile strength tests of geogrid were conducted for make sure the chemical compatibility with cement treated sub-base material. The location of geogrid placement for the concrete paved runway was evaluated. The construction damage to the geogrid could be occurred. Because the cement treated sub-base layer or lean concrete was spread by the finisher. The magnitude of tensile strength reduction was 1.16%~1.90% due to the construction damage and the ultimate tensile strength is maintained with the specification required. Total area of geogrid placement in this project is about 50,000 $m^2$.

  • PDF

Behavior of Jointed Concrete Pavement by Box Culvert and Reinforced Slab (박스형 암거와 보강슬래브에 의한 줄눈 콘크리트 포장의 거동)

  • Park, Joo Young;Sohn, Dueck Su;Lee, Jae Hoon;Yan, Yu;Jeong, Jin Hoon
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.25-35
    • /
    • 2012
  • PURPOSES : Hollows are easily made, and bearing capacity can be lowered near underground structures because sublayers of pavement settle for a long time due to difficult compaction at the position. If loadings are applied in this condition, distresses may occur in pavement and, as the result, its lifespan can decrease due to the stress larger than that expected in design phase. Although reinforced slab is installed on side of box culvert to minimize the distresses, length of the reinforced slab is fixed as 6m in Korea without any theoretical consideration. The purpose of this paper is investigating the behavior of concrete pavement according to the cover depth of the box culvert ad the length of the reinforced slab. METHODS : The distresses of concrete pavement slabs were investigated and cover depth was surveyed at position where the box culverts were located in expressways. The concrete pavements including the box culverts were modeled by finite element method and their behaviors according to the soil cover depth were analyzed. Wheel loading was applied after considering self weight of the pavement and temperature gradient of the concrete pavement slab at Yeojoo, Gyeonggi where a test road was located. After installing pavement joint at various positions, behavior of the pavement was analyzed by changing the soil cover depth and length of the reinforced slab. RESULTS : As the result, the tensile stress developed in the pavement slab according to the joint position, cover depth, and reinforced slab length was figured out. CONCLUSIONS : More reasonable and economic design of the concrete pavement including the box culvert is expected by the research results.

A Performance Test Method of Waterproofing System to Evaluate the Responsiveness to the Movement of Box Culvert Structure for Underground Electronic Power Facility (Mock-Up Test Method of Waterproofing Layer to Response 10 mm Movement of Expansion Joint) (지하 전력구조물의 거동에 대한 방수층의 대응 성능 평가 방법 개발 (10 mm 거동 대응형 방수시스템 Mock-Up 시험 방법))

A Study of Smokeproof in Underground Culvert (지하공동구의 연소방지설비에 관한 연구)

  • 홍경표;이영재;김선정
    • Fire Science and Engineering
    • /
    • v.15 no.4
    • /
    • pp.57-63
    • /
    • 2001
  • Due to frequent fire incidents in underground culverts, many live are lost and the function of city is paralyzed, and consequently they bring tremendous damages to fortunes and live of people. It brings my attention that there are many problems presented when the current standard of smoke prevention facility is applied to prevent fire. Among many methods to prevent smoke in underground culverts this study concentrates on water-mist method witch is not currently applied in Korea and introduces installation method.

  • PDF

The Study on problems in Construction of Corrugated Steel Underground Culverts and Complementary Measures Thereof (파형강판 지중암거의 시공상 문제점 및 보완에 대한 고찰)

  • Jung, Young-Hwa;Seong, Yoo-Kyeong;Chang, Dong-Hui
    • Journal of Industrial Technology
    • /
    • v.28 no.A
    • /
    • pp.133-140
    • /
    • 2008
  • The Corrugated steel plate structure(CPS) can be applied to construction sites with various purposes, and the merits of CPS such as economical efficiency and swiftness can be utilized when it is constructed properly in consideration of its characteristics. However, in Korea, since the history of corrugated steel plate culvert is relatively short, there are not enough design standards. This research is prepared for finding out the causes through examining and analyzing the problems based on the examples from the existing constructions. Moreover, this study can be utilized in preparing designs and design standards of corrugated steel plate culvert in the future and devising prevention measures and complementary measures by studying construction methods considering features of construction sites and circumstances, several points to be considered while carrying out construction works and prevention measures of a problem with the existing structures.