• Title/Summary/Keyword: underflow and overflow

Search Result 62, Processing Time 0.026 seconds

High-Performance Reversible Data Hiding with Overflow/Underflow Avoidance

  • Yang, Ching-Yu;Hu, Wu-Chih
    • ETRI Journal
    • /
    • v.33 no.4
    • /
    • pp.580-588
    • /
    • 2011
  • This paper proposes reversible data hiding using minimum/maximum preserved overflow/underflow avoidance (MMPOUA). The proposed MMPOUA algorithm consists of three main steps. These steps include the minimum (or maximum) pixel fixing, pixel squeezing, and pixel isolation. The aims of pixel fixing are to keep the minimum (or maximum) pixel of a host block unchanged and prevent the occurrence of overflow/underflow. Both the pixel squeezing and pixel isolation supply hiding storage while keeping the amount of distortion low. The proposed method can avoid (or significantly reduce) the overhead bits used to overcome overflow/underflow issues. At an embedding rate of 0.15 bpp, the proposed algorithm can achieve a PSNR value of 48.52 dB, which outperforms several existing reversible data hiding schemes. Furthermore, the algorithm performed well in a variety of images, including those in which other algorithms had difficulty obtaining good hiding storage with high perceived quality.

Performance Analysis of a Hydrodynamic Separator for Treating Particulate Pollutants in Highway Rainfall Runoff

  • Yu, Jianghua;Yi, Qitao;Kim, Young-Chul
    • Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.262-269
    • /
    • 2009
  • This study examined the separation characteristics of particles in the rainfall runoff from paved roads using a ${\varphi}7.5$ cm hydrocyclone. The volume fraction and total suspended solids concentrations in the overflow and underflow from the hydrocyclone, as well as the separation efficiency were determined. The results indicated that the overflow volume increased with increasing operational pressure, but decreased with decreasing ratio of underflow outlet to inlet sizes ($D_u/D_i$), while the underflow to overflow volumes showed contrary behavior. The total suspended solid (TSS) concentration ratio between the overflow and inflow ($TSS_{over/in}$) decreased as a function of the operational pressure, while the corresponding ratio of underflow to inflow ($TSS_{under/in}$) increased. There was no visible difference in the $TSS_{over/in}$ with increasing $D_u/D_i$ ratio, but the $TSS_{under/in}$ decreased sharply. The particle removal efficiency was mainly affected by the particle size.

Combination of Token Bucket and AMP Schemes to Solve Buffer Underflow and Overflow of Video Streaming in Wireless Communication (무선통신 환경에서 비디오 스트리밍의 버퍼 언더플로우와 오버플로우를 해결하기 위한 토큰버킷과 AMP 기법의 결합)

  • Lee, Hyun-no;Kim, Dong-hoi
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.40 no.7
    • /
    • pp.1330-1338
    • /
    • 2015
  • In wireless communication network, the amount of packet data for the video streaming in the playout buffer of the receiver is changed with time according to network condition. If the amount of packet data is less than a specific buffer amount, the buffer underflow problem is generated. On the contrary, if the amount of packet data is more than a given buffer amount, the buffer overflow problem is occurred. When the playout of the video streaming is processed, these buffer underflow and overflow problems cause stop and skip phenomenons and then provide the discontinuity of playout. Therefore, to solve the buffer underflow and overflow problems of the video streaming in wireless communication network, This paper analyzes the combined effect of Token Bucket scheme, which controls the bursty traffic, and AMP(Adaptive Media Playout) scheme, which adaptively changes the playout speed of receiver. Through simulation, we found that the combination of Token Bucket and AMP schemes provides the superiority in terms of the occurrence number of buffer underflow and overflow, the stop duration time and the number of removed frames generated by underflow and overflow, and PSNR.

Analysis of Security Vulnerability Cases on Chromium WebAssembly: Focus on Cases Related to Overflow and Underflow (Chromium WebAssembly 취약점 사례 분석: Overflow, Underflow 관련 사례를 중점으로)

  • Lee, Jae-Hong;Choi, Hyoung-Kee
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2021.11a
    • /
    • pp.221-224
    • /
    • 2021
  • 본 논문은 WebAssembly 가 도입된 2017 년부터 현재 2021 년까지 발생한 보안 취약점을 분석하고 분류하여, WebAssembly 에 대한 개발자들의 이해도를 높이고 WebAssembly 도입에 생길 수 있는 문제점들을 정리한다. 특히 CVE-2018-6092(Integer Overflow), CVE-2018-6036(Underflow) 사례들을 제공된 PoC 를 통하여 재현하고, PoC 코드, 원인 코드와 대처 코드까지 분석한다.

Contrast Enhancement with Bin Underflow and Bin Overflow (Bin Underflow Bin Overflow를 이용한 Contrast Enhancement)

  • Oh, Jae-Hwan;Kang, Hyun;Yang, Seung-Joon
    • Proceedings of the IEEK Conference
    • /
    • 2003.07e
    • /
    • pp.1719-1722
    • /
    • 2003
  • Image enhancement를 하기 위한 영상처리 알고리즘 중의 하나인 contrast enhancement 알고리즘은 화면의 flickering 과 같은 부작용과 조절 가능한 contrast enhancement rate 에 대한 구현의 어려움 등으로 실제 TV와 같은 동영상에 적용하기에 어려움이 있었다. 본 논문에서는 Bin Underflow Bin Overflow(BUBO)를 이용하여 동영상에 적용할 경우에도 flickering 등의 부작용이 생기지 않으며 contrast enhancement rate 을 조절할 수 있는 효율적인 알고리즘을 제안한다. 또한 이와 관련하여 영상의 휘도 레벨에 있어서 어두운 영역의 계조와 밝은 영역의 계조를 향상시킬 수 있는 black/white level stretch 알고리즘과 전체 화면의 출력 휘도 레벨에 대한 dynamic range를 유지하면서 brightness를 조절할 수 있는 알고리즘을 제안한다.

  • PDF

Operational Variables and Performance of Hydrodynamic Separator Treating Rainfall Runoff from Bridge (수리동력학적 분리장치에 의한 교량에서의 비점원 오염물질 처리시 운전변수와 분리효율에 관한 연구)

  • Kim, Yeonseok;Yu, Jianghua;Kim, Youngchul
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.3
    • /
    • pp.342-348
    • /
    • 2011
  • A hydrodynamic separator using natural free energy provided by bridge was operated for the treatment of stormwater runoff. The separator was automatically controlled by using electronic valve which is connected with pressure meter. Normally the separator was opened during dry days, but it was closed after the capture of first flush. The results indicated that the average pressure and the flow rate were directly affected by the rainfall intensity. The pressure was more than 3 meters as the rainfall intensity was above 5 mm/hr. The percent volume of underflow decreased as the pressure and flow rate increased, but the percent volume of overflow showed an opposite behavior. The concentration of total suspended solids (TSS) in underflow increased as a function of increasing pressure while it decreased in overflow. The TSS separation efficiency was evaluated based on mass balance. It ranged from 30% to 90% with the pressure ranging from 2 to 10 meters, and it was proportional to pressure and flow rate. The analysis of water balance indicated that around 13% of total runoff was captured by the separator as a first flush, and this runoff was separated as underflow and overflow with the respective percent volume of 29% and 71%. The pollutants budget was also examined based on mass balance. The results showed that the percent of TSS, $COD_{cr}$, TN and TP in underflow were 73%, 59%, 7.6% and 49%, respectively.

A Comparative Study on Hydraulic Jump and Specific Energy Losses at Downstream According to the Weir Discharge Types (보 유출형태에 따른 하류부 도수 및 비에너지 손실에 관한 비교 연구)

  • Park, Hyo-Seon;Yoon, Geun-Ho;Koo, Bon-Jin;Choi, Gye-Woon
    • Journal of Wetlands Research
    • /
    • v.15 no.1
    • /
    • pp.149-157
    • /
    • 2013
  • The weirs built so far are mainly overflow type weirs overflowing to the upstream. Main advantages of overflow type weirs are, effective water resources management and easy design, construction and maintenance due to many accumulated studies. However, due to the special feature of the overflow type weir where water overflows through the upstream of the weir, the silt coming from the upstream is not discharged to the downstream of the weir. This increases the river bed and reduces the reservoir capacity, and as a result, the weir loses its function. A underflow type weir with a water gate has been implemented in order to solve such sediment deposit and weir maintenance problems. However due to the design problem of recently constructed underflow type weirs, the river bed of the downstream of a weir has been scoured. And this leds to a structural problem. In this study, the flow characteristics of overflow type weirs and underflow type weir, hydraulic jump length analysis depending on change of water depth and the amount of specific energy loss generated per unit length depending on a weir type have been compared and analyzed, for the effective design and management of the weirs. The experiment results show that, when identical upstream conditions of underflow type weir and an overflow type weir were maintained, the hydraulic jump length was up to twice longer with Fr(Froude number) 3.5 of the hydraulic jump length at the underflow type weir, and the hydraulic jump length gradually decreased as the downstream water depth increased. The comparative analysis result of the amount of specific energy loss generated per unit length showed that the amount of energy loss per unit length was twice higher for an overlfow type weir than a underflow type weir. Therefore, in case of a underflow type facility, an additional energy reduction facility is determined to be necessary for safety of water construction structures.

Analysis of CO2 Capture Efficiency in Relation to the Inlet Moisture Content of the Regenerator in the Continuous Process by using Sorbent Analysis (연속공정에서 고체흡수제의 입자분석을 통한 재생반응기 주입 수분량에 따른 CO2 회수효율 영향 분석)

  • Lee, Do-Young;Kim, Ki-Chan;Park, Young Cheol;Han, Moon-Hee;Yi, Chang-Keun
    • Korean Chemical Engineering Research
    • /
    • v.50 no.4
    • /
    • pp.654-658
    • /
    • 2012
  • In this study, $CO_2$ capture efficiency in relation to the inlet moisture content of the regenerator was investigated using potassium-based sorbents in the continuous process composed of two bubbling fluidized-bed reactors, where solid outlet configuration in the regenerator was converted from underflow to overflow. XRD (X-ray Diffraction), SEM (Scanning Electron Microscope) and TGA were performed to find out the effect of water pre-treatment according to inlet moisture content in the regenerator. The $K_2CO_3{\cdot}1.5H_2O$ structure of solid sorbents has been increased as inlet moisture content of the regenerator increased. As a result, the $CO_2$ capture efficiency increased as the $K_2CO_3{\cdot}1.5H_2O$ structure of solid sorbents increased since the reactivity of the sorbents has been improved by that structure generated by the water pre-treatment. And $CO_2$ capture efficiency increased about 3~8% after sorbent outlet configuration of the regenerator was changed underflow to overflow.

Reversible Data Hiding Based on the Histogram Modification of Difference Image (차분 영상 히스토그램 수정 기반의 가역 데이터 은닉 기법)

  • Yoo, Hyang-Mi;Lee, Sang-Kwang;Suh, Jae-Won
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.48 no.2
    • /
    • pp.32-40
    • /
    • 2011
  • Reversible data hiding, which can recover the original image without any distortion after the extraction of the hidden data, has drawn considerable attention in recent years. However, underflow and overflow problems have occurred occasionally in the embedded image. To overcome these problems, we propose a new reversible data hiding algorithm which embeds a compressed location map used to identify these underflow and overflow points. In addition, the proposed algorithm allows for multilevel data hiding to increase the hiding capacity. The simulation results demonstrate that the proposed algorithm generates good performances in the PSNR, the embedding capacity, and the size of side information.

A Feedback Buffer Control Algorithm for H.264 Video Coding (H.264 동영상 부호기를 위한 Feedback 버퍼 제어 방식)

  • Son Nam Rye;Lee Guee Sang
    • The KIPS Transactions:PartB
    • /
    • v.11B no.6
    • /
    • pp.625-632
    • /
    • 2004
  • Since the H.264 encoding adopts both forward prediction and hi-direction prediction modes and exploits Variable Length Coding(VLC), the amount of data generated from video encoder varies as Flaying time goes by. The fixed bit rate encoding system which has limited transmission channel capacity uses a buffer to control output bitstream It's necessary to control the bitstream to maintain within manageable range so as to protect buffer from overflow or underflow. With existing bit amount control algorithms, the $\lambda_{MODE}$ which is relationship between distortion value and quantization parameter often excesses normal value to end up with video error. This paper proposes an algorithm to protect buffer from overflow or underflow by introducing a new quantization parameter against distortion value of H.264 video data. The test results of 6 exemplary data show that the proposed algorithm has the same PSNR as and up to 8% reduced bit rate against existing algorithms.