• Title/Summary/Keyword: under-ground parking

Search Result 13, Processing Time 0.03 seconds

State of Swerage Systems and Prospects in Korea (우리 나라의 하수도현황과 전망)

  • 김갑수
    • Journal of environmental and Sanitary engineering
    • /
    • v.8 no.2
    • /
    • pp.65-84
    • /
    • 1993
  • This study reviewed the current status and problems of sewerage system in Korea and then proposed possible methods to correct the problems. Also, evaluation of future development in sewerage system is included. It can be summarized as follows : 1. Investment in sewerage system is relatively low . 0.23% of GNP, Considering that the investment portion is 0.35% in OECD and 0.63% in Japan, it should be increased further. 2. The reasons wily the investment in sewerage system is low can be ' (1) Low priority is given to the investment in sewerage system. Local government builds and operates its own wastewater treatment plant. Local government as well as residents prefer to invest their money in roadwork, housing and parks to in wastewater treatment facilities because of greater investment effects. (2) Besides capital investment, more maintenance cost is needed for sewerage system. Proper operation of wastewater treatment facilities requires a well-trained operator. Because of public conception that operation of wastewater treatment facility is a dirty job, it is difficult to find a well-trained operator. (3) It is difficult to estimate the effect of sewerage system (4) Cost required to build and maintain wastewater treatment facility should be paid by people, who benefit from the facility. People to benefit are sometimes different from people to pay. 3. Advanced treatment is necessary to protect the bay aura and raw water source as well as to prevent eutrophication of lakes and ponds. 4. Wastewater treatment facility were mainly build in big cities during the decade of 1980. Followings should be solved first to expand the facilities. (1) Rapid repair and construction of sewer. (2) Technical development of wastewater treatment . Prevention of efficient and economical wastewater . Development of efficient and economical wastewater treatment techniques . Development of high-efficiency treatment using bioreactor . Reuse of wastewater treatment plant effluent (3) Sludge treatment and disposal . Composting of sludge cakes . Development of techniques to reduce the volume of sludge cake : incineration and reuse of sludge ash and slag. (4) Utilization of wastewater treatment facilities . Construction of community parks or sports families(ie, on the tops of the covered aeration tanks and sedimention tanks) Construction of wastewater treatment facilities under ground and of parking facilities and community parks above ground. (5) Education of wastewater treatment personal.

  • PDF

Lateral Load Test on the Bar-type Anti-buoyancy Anchors in the Weathered Rock (풍화암에 시공된 Bar Type 부력앵커의 수평재하시험)

  • Park, Chan-Duk;Lee, Kyu-Hwan;Ryu, Nam-Jae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.165-174
    • /
    • 2004
  • This study is about a horizontal load test of buoyance anchor installed in the section where underground water level happens in the depth of 5m under the ground when the ground is excavated, because the section as a excavation section of high speed railway ${\bigcirc}{\bigcirc}$ station is near a rivers and because the section always has a reservoir of full water level on the left. Therefore, in this study we will appraise the long-term stability of the structure permanently being taken buoyance by the underground water level, through the spot test of the buoyance anchor installed in the section where underground water level happens. For that, Bar Type anchor is used, which can get enough pulling-out force by a method to resist buoyance by using friction force against the ground by high strength steel rod or steel wire. Anti-buoyance anchor is installed on the bottom slab of underground structure being taken horizontal force by the braking and accelerating of high speed train. And, It is aimed to analyze and grasp the review result of stability for the horizontal force that happens at the parking and stopping of high speed train, by executing horizontal load test for the grasping of the movements characteristic of buoyance anchor.

Design of Standard Submission Format for Underground Structures : An Automated Update of the UnderSpace Integrated Map (지하공간통합지도 자동갱신을 위한 지하구조물 제출 표준 설계)

  • Park, Dong Hyun;Jang, Yong Gu;Ryu, Ji Song
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.469-476
    • /
    • 2021
  • The framework plan for the development of an integrated underground space map was established of preventing ground subsidence. The mapping process is expected to be completed to the level of nationwide municipal government standards by end of this year. To facilitate the utilization of the integrated underground space map, paper-based drawings for specialized organizations in underground safety impact assessment have been provided since September 2018, and services for local government officials have been provided in the underground information utilization system since May 2019. However, the map is utilized based on the information at the time of the initial development of the map, without any updates, thereby resulting in a lack of accuracy and latest information. This has led to a decrease in the utilization and reliability of the information. Therefore, in this study, for the underground structures(subway, underground shopping mall, underground passage, underground roadway, underground parking lot, utility tunnel), which are the key components of the integrated underground space map, a standard format for the submission of completed drawings is designed in accordance with Article 42 (2) of the Special Act on Underground Safety Management, which aims at laying the foundation for establishing the updated system of the integrated underground space map. In addition, through the verification of the automatically updated underground structure data based on the standard format, the reliability of the data can be assured. This format is expected to contribute to the improved utilization of the integrated underground space map in the future.