원자력발전소 증기터빈 발전기의 부하차단 모의시험 (A simulation test of lone rejection for steam turbine generator in nuclear power plant)

  • 최인규;정태원;이기성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 D
    • /
    • pp.2301-2303
    • /
    • 2003
  • A steam turnine in thermal/nuclear power plant drives generator and maintains it at rated speed using high temperature and high pressure steam energy. After synchronization in parallel with the power system, generator output increases according as the governor, that is the controller, increases steam flow into turbine. By the way, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is to limit the speed to its overspeed trip setpoint by stopping the steam flow as soon as possible, the test of which is called load rejection test. It is introduced in this paper for a simulation test of generator load rejection to be implemented on the turbine governor in a 600MW nuclear power plant before its startup.

  • PDF

680MW 원자력발전소 증기터빈 발전기의 부하차단 모의시험 (A Simulation Test of Load Rejection for Steam Turbine Generator in a 680MW Nuclear Power Plant)

  • 최인규;정창기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.1605-1606
    • /
    • 2007
  • An electrical generator in power plant is driven and maintained its speed at rated by steam turbine. By the way, after synchronization in parallel with the power system, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is to limit the speed to its overspeed trip set point by stopping the steam flow as soon as possible, the test of which is called load rejection test. It is introduced in this paper for a field simulation test of generator load rejection to be implemented on the turbine governor in a 680MW nuclear power plant before its startup.

  • PDF

Transient Diagnosis and Prognosis for Secondary System in Nuclear Power Plants

  • Park, Sangjun;Park, Jinkyun;Heo, Gyunyoung
    • Nuclear Engineering and Technology
    • /
    • 제48권5호
    • /
    • pp.1184-1191
    • /
    • 2016
  • This paper introduces the development of a transient monitoring system to detect the early stage of a transient, to identify the type of the transient scenario, and to inform an operator with the remaining time to turbine trip when there is no operator's relevant control. This study focused on the transients originating from a secondary system in nuclear power plants (NPPs), because the secondary system was recognized to be a more dominant factor to make unplanned turbine-generator trips which can ultimately result in reactor trips. In order to make the proposed methodology practical forward, all the transient scenarios registered in a simulator of a 1,000 MWe pressurized water reactor were archived in the transient pattern database. The transient patterns show plant behavior until turbine-generator trip when there is no operator's intervention. Meanwhile, the operating data periodically captured from a plant computer is compared with an individual transient pattern in the database and a highly matched section among the transient patterns enables isolation of the type of transient and prediction of the expected remaining time to trip. The transient pattern database consists of hundreds of variables, so it is difficult to speedily compare patterns and to draw a conclusion in a timely manner. The transient pattern database and the operating data are, therefore, converted into a smaller dimension using the principal component analysis (PCA). This paper describes the process of constructing the transient pattern database, dealing with principal components, and optimizing similarity measures.

Field Adaptability Test for the Full Load Rejection of Nuclear Turbine Speed Controllers using Dynamic Simulator

  • Choi, In-Kyu;Kim, Jong-An;Woo, Joo-Hee
    • 조명전기설비학회논문지
    • /
    • 제23권7호
    • /
    • pp.67-74
    • /
    • 2009
  • This paper describes the speed control functions of the typical steam turbine speed controllers and the test results of generator load rejection simulations. The goal of the test is to verify the speed controller's ability to limit the steam turbine's peak speed within a predetermined level in the event of generator load loss. During normal operations, the balance between the driving force of the steam turbine and the braking force of the generator load is maintained and the speed of the turbine-generator is constant. Upon the generator's load loss, in other word, the load rejection, the turbine speed would rapidly increase up to the peak speed at a fast acceleration rate. It is required that the speed controller has the ability to limit the peak speed below the overspeed trip point, which is typically 110[%] of rated speed. If an actual load rejection occurs, a substantial amount of stresses will be applied to the turbine as well as other equipments, In order to avoid this unwanted situation, not an actual test but the other method is necessary. We are currently developing the turbine control system for another nuclear power plant and have plan to do the simulation suggested in this paper.

Proposal of CPC Function Improvement

  • Lee, Byung-Il;Kim, Jong-Jin;Baek, Seung-Su;Kim, Hee-Cheol;Lee, Sang-Yong
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1995년도 추계학술발표회논문집(2)
    • /
    • pp.562-567
    • /
    • 1995
  • The concept of VLDT (Variable Low DNBR Trip), a new CPC trip function, was proposed and applied to the events of increase in secondary heat removal, such as an excess feedwater event anti an IOSGADV (Inadvertent Opening S/G Atmospheric Dump Valve). Major assumption used in this study was no time delay to LOOP (Loss of Offsite Power) after turbine trip. In case of using this VLDT function, safety criterion of DNB would not be violated under the same condition as previous analysis without any change in thermal margin.

  • PDF

증기터빈 과속도 보호장치의 비교분석 (An Analysis and Comparison of Steam Turbine Overspeed Protectors)

  • 최인규;정창기;김종안
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 D
    • /
    • pp.2260-2262
    • /
    • 2004
  • After steam turbines in power plant drives generator and maintains it at rated speed using high temperature and high pressure steam energy, they regulate the output of generator when synchronized in parallel with the power system. By the way, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is "how to limit the speed within its overspeed trip setpoint and escape from danger." For the purpose of it, there are various ways known. Some overspeed protection methods for steam turbines now being operating in korea are introduced in this paper.

  • PDF

증기터빈 밸브제어방식에 따른 과속도 제어 고찰 (A Study on Overspeed Control and Valve Position Control for Steam Turbine in Power Plants)

  • 최인규;우주희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.1661-1662
    • /
    • 2008
  • After steam turbines in power plant drives generator and maintains it at rated speed using high temperature and high pressure steam energy, they regulate the output of generator when synchronized in parallel with the power system. By the way, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is "how to limit the speed within its overspeed trip setpoint and escape from danger." In order to implement this purpose, there are various ways different from valve position control. So, in this paper, the various methods for overspeed protection are introduced in comparison with valve position control.

  • PDF

증기터빈용 Synchro Clutch Coupling의 진동 특성 (Vibration Characteristics of a Synchro Clutch Coupling for Steam Turbine)

  • 심응구;이태구;문승재;이재헌
    • 플랜트 저널
    • /
    • 제4권3호
    • /
    • pp.66-72
    • /
    • 2008
  • The vibration of steam turbine is caused by Mass unbalance, Shaft misalignment, Oil whip and rubbing etc. But in turbine which is normally operated and maintained, the Mass unbalance component possesses the greatest portion. Our power plant has two steam turbines in capacity of 200 MW and 135 MW respectively and each turbine is supported by 6 journal bearings. However, we had many difficulties because the vibration amplitude of #3 and #4 Bearings was high during the start-up and operation mode change of steam turbine. But, with this study, we completely solved the vibration problem caused by the mass unbalance of #1 steam turbine. Until a recent date, #3 and #4 bearings which support high pressure turbine for #1 steam turbine had shown about $135{\mu}m$ in vibration amplitude (sometimes it increased to $221{\mu}m$ maximum. alarm: 6 mils, trip: 9 mils) at base load. After applying the study, they decreased to about $45{\mu}m$ maximum. It is a result from that we did not change the setting value of bearing alignment and only changed the assembly position of internal parts in Synchro clutch coupling rachet wheel which links between high pressure turbine and low pressure turbine, and increased the internal gap and machining of the Pawl cage surface. In the operation of steam turbine, if the vibration value increases by 1X, we should reduce the vibration of bearing by weight balancing. However, unless the vibration of bearing is declined by the balancing, we will have to disassemble and check the component and find the cause. In this study, we researched the way to lower mass unbalance that is 1X vibration component which has the greatest portion of vibration generated by steam turbine and we got good result by applying the findings of this study.

  • PDF