• 제목/요약/키워드: tunnel support pressure

검색결과 104건 처리시간 0.02초

Determination of tunnel support pressure under the pile tip using upper and lower bounds with a superimposed approach

  • Lee, Yong-Joo
    • Geomechanics and Engineering
    • /
    • 제11권4호
    • /
    • pp.587-605
    • /
    • 2016
  • This study aimed to develop upper and lower bounds to predict the tunnel support pressure under the pile tip during the circular tunnel excavation. Most previous studies on the upper and lower bound methods were carried out for the single ground structures, e.g., retaining wall, foundation, ground anchor and tunnel, in the homogeneous ground conditions, since the pile-soil-tunnel interaction problem is very complicated and sophisticated to solve using those bound methods. Therefore, in the lower bound approach two appropriate stress fields were proposed for single pile and tunnel respectively, and then they were superimposed. In addition, based on the superimposition several failure mechanisms were proposed for the upper bound solution. Finally, these upper bound mechanisms were examined by shear strain data from the laboratory model test and numerical analysis using finite element method.

미고결 저토피 터널에 작용하는 토압에 관한 연구 (Tunnel Pressure acting on Shallow Tunnel in Unconsolidated Ground)

  • 이재호;아쿠타가와 신니치;김영수;문홍득
    • 터널과지하공간
    • /
    • 제17권6호
    • /
    • pp.453-463
    • /
    • 2007
  • Terzaghi터널토압 이론은 shield 및 도심 NATM터널의 설계토압으로 현재까지도 사용되고 있다. 본 논문에서 지반의 변형거동과 한계상태를 가정한 Terzaghi 토압과의 상호 관계에 관한 조사를 위해 Terzaghi 터널토압이론, 2차원 실내 터널 모형 실험과 변형률 연화모델을 기본으로한 비선형 수치해석을 실시하였다. 굴착에 따른 터널 토압와 지반 변형거동의 폭넓은 이해와 그들의 상호작용에 대한 효율적인 활용은 경제적인 터널 지보설계와 안정한 시공을 이끌 수 있다.

철도터널 굴착에 의한 암반과 지보재의 거동에 관한 연구 (A study on the rock-support behavior due to railway tunnel excavation)

  • 김선곤;박종관;정인철;이승도
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1077-1082
    • /
    • 2004
  • With increasing the number of tunnel constructions, more reliable analysis methods for tunnel excavation is needed to accomplish technically sound design, and stable and economical constructions. For this purpose, a series of construction procedures, which include excavation and support stages of tunneling, need to be considered. In this study, therefore, rock-support response behavior due to railway tunnel construction has been examined by using analytic methods and numerical calculations. For examining rock-support response behavior, the effects of shotcrete, thickness and time of installation have been considered. Through analytic and numerical calculations, it is shown that support pressure becomes higher with increasing the shotcrete thickness and stiffness, and hence the tunnel deformation tends to be stable. It is also important to notice that there is a significant effect of shotcrete installation time on the tunnel deformation, although no significant change in support pressure is observed.

  • PDF

침투력이 터널 막장의 안정성에 미치는 영향 연구 - 모형실험을 중심으로 - (Effect of Seepage Forces on the Tunnel Face Stability - Assessing through Model Tests -)

  • 이인모;안재훈;남석우
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.41-48
    • /
    • 2001
  • In this study, two factors are simultaneously considered for assessing tunnel face stability: one is the effective stress acting on the tunnel face calculated by upper bound solution; and the other is the seepage force calculated by numerical analysis under the condition of steady-state groundwater flow. The seepage forces calculated by numerical analysis are compared with the results of a model test. From the results of derivations of the upper bound solution with the consideration of seepage forces acting on the tunnel face, it could be found that the minimum support pressure for the face stability is equal to the sum of effective support pressure and seepage pressure acting on the tunnel face. Also it could be found that the average seepage pressure acting on the tunnel face is proportional to the hydrostatic pressure at the same elevation and the magnitude is about 22% of the hydrostatic pressure for the drainage type tunnel and about 28% for the water-proof type tunnel. The model tests performed with a tunnel model had a similar trend with the seepage pressure calculated by numerical analysis. From the model tests it could be also found that the collapse at the tunnel face occurs suddenly and leads to unlimited displacement.

  • PDF

Effect of the support pressure modes on face stability during shield tunneling

  • Dalong Jin;Yinzun Yang;Rui Zhang;Dajun Yuan;Kang Zhang
    • Geomechanics and Engineering
    • /
    • 제36권5호
    • /
    • pp.417-426
    • /
    • 2024
  • Shield tunneling method is widely used to build tunnels in complex geological environment. Stability control of tunnel face is the key to the safety of projects. To improve the excavation efficiency or perform equipment maintenance, the excavation chamber sometimes is not fully filled with support medium, which can reduce the load and increase tunneling speed while easily lead to ground collapse. Due to the high risk of the face failure under non-fully support mode, the tunnel face stability should be carefully evaluated. Whether compressive air is required for compensation and how much air pressure should be provided need to be determined accurately. Based on the upper bound theorem of limit analysis, a non-fully support rotational failure model is developed in this study. The failure mechanism of the model is verified by numerical simulation. It shows that increasing the density of supporting medium could significantly improve the stability of tunnel face while the increase of tunnel diameter would be unfavorable for the face stability. The critical support ratio is used to evaluate the face failure under the nonfully support mode, which could be an important index to determine whether the specific unsupported height could be allowed during shield tunneling. To avoid of face failure under the non-fully support mode, several charts are provided for the assessment of compressed air pressure, which could help engineers to determine the required air pressure for face stability.

Stability assessment of tunnel face in a layered soil using upper bound theorem of limit analysis

  • Khezri, Nima;Mohamad, Hisham;Fatahi, Behzad
    • Geomechanics and Engineering
    • /
    • 제11권4호
    • /
    • pp.471-492
    • /
    • 2016
  • Underground tunnelling is one of the sustainable construction methods which can facilitate the increasing passenger transportation in the urban areas and benefit the community in the long term. Tunnelling in various ground conditions requires careful consideration of the stability factor. This paper investigates three dimensional stability of a shallow circular tunnel in a layered soil. Upper bound theorem of limit analysis was utilised to solve the tunnel face stability problem. A three dimensional kinematic admissible failure mechanism was improved to model a layered soil and limiting assumptions of the previous studies were resolved. The study includes calculation of the minimum support pressure acting on the face of the excavation in closed-face excavations. The effects of the characteristics of the layers on the minimum support pressure were examined. It was found that the ratio of the thickness of cover layers particularly when a weak layer is overlying a stronger layer, has the most significant influence on the minimum tunnel support pressure. Comparisons have been made with the results of the numerical modelling using FLAC3D software. Results of the current study were in a remarkable agreement with those of numerical modelling.

Reliability analysis of anti-seismic stability of 3D pressurized tunnel faces by response surfaces method

  • Zhang, Biao;Ma, Zongyu;Wang, Xuan;Zhang, Jiasheng;Peng, Wenqing
    • Geomechanics and Engineering
    • /
    • 제20권1호
    • /
    • pp.43-54
    • /
    • 2020
  • The limit analysis and response surfaces method were combined to investigate the reliability of pressurized tunnel faces subjected to seismic force. The quasi-static method was utilized to introduce seismic force into the tunnel face. A 3D horn failure mechanism of pressurized tunnel faces subjected to seismic force was constructed. The collapse pressure of pressurized tunnel faces was solved by the kinematical approach. The limit state equation of pressurized tunnel faces was obtained according to the collapse pressure and support pressure. And then a reliability model of pressurized tunnel faces was established. The feasibility and superiority of the response surfaces method was verified by comparing with the Monte Carlo method. The influence of the mean of soil parameters and support pressure, variation coefficients, distribution type and correlation of c-φ on the reliability of pressurized tunnel faces was discussed. The reasonable safety factor and support pressure required by pressurized tunnel faces to satisfy 3 safety levels were presented. In addition, the effects of horizontal seismic force, vertical seismic force and correlation of kh-kv on the reliability of pressurized tunnel faces were also performed. The method of this work can give a new idea for anti-seismic design of pressurized tunnel faces.

Deterministic and reliability-based design of necessary support pressures for tunnel faces

  • Li, Bin;Yao, Kai;Li, Hong
    • Geomechanics and Engineering
    • /
    • 제22권1호
    • /
    • pp.35-48
    • /
    • 2020
  • This paper provides methods for the deterministic and reliability-based design of the support pressures necessary to prevent tunnel face collapse. The deterministic method is developed by extending the use of the unique load multiplier, which is embedded within OptumG2/G3 with the intention of determining the maximum load that can be supported by a system. Both two-dimensional and three-dimensional examples are presented to illustrate the applications. The obtained solutions are validated according to those derived from the existing methods. The reliability-based method is developed by incorporating the Response Surface Method and the advanced first-order second-moment reliability method into the bisection algorithm, which continuously updates the support pressure within previously determined brackets until the difference between the computed reliability index and the user-defined value is less than a specified tolerance. Two-dimensional reliability-based support pressure is compared and validated via Monte Carlo simulations, whereas the three-dimensional solution is compared with the relationship between the support pressure and the resulting reliability index provided in the existing literature. Finally, a parametric study is carried out to investigate the influences of factors on the required support pressure.

NATE터널의 갱문 가시설 배후 균열에 따른 조치 및 보강사례

  • 길호언;김진흥;유재성;차복남
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.342-355
    • /
    • 2006
  • The Tunnel portal is designed on temporary support system which is composed by 28m height H-Pile method and Ground Anchor method. The tunnel has excavated about 30m from the portal, but some deformation is found on the surface ground just above the tunnel face. It was investigated very carefully to find out the causes of deformation. By the observation and study, two main causes of deformation are found out. The one is earth pressure increase compared with classical earth pressure theory. That was due to the direction of ground rock mass's discontinuities. It causes the increase of earth pressure that are activated by the direction of discontinuity. The other one is that present design method neglect the transferred force by removal of temporary support members and ground anchor within the tunnel contour line as the tunnel excavation proceeds As the result of removals of the member and anchor, some force transferred from removed systems to remaining supporting systems. In designing the portal support systems, lt must be considered the discontiunity of ground mass and the transfered force due to excation.

  • PDF

2-Arch 도로터널에 적용된 표준지보패턴의 적정성 검토 (A Evaluation of Standard Support Pattern for Two-Arch Road Tunnel)

  • 천병식;최광보;김혜양;유준희
    • 한국지반환경공학회 논문집
    • /
    • 제9권7호
    • /
    • pp.25-35
    • /
    • 2008
  • 국내의 경우 일반적인 2차로 도로터널은 시공경험 및 축적된 제반자료가 풍부하여 표준적인 지보패턴이 제시되고 있으나, 2-Arch 도로터널의 경우 아직 시공경험 및 계측자료가 부족하여 특정지형 및 암질에 대해 별도의 발파설계와 해석을 통해 선정한 지보패턴을 표준적으로 적용하고 있다. 따라서 본 연구에서는 2-Arch 도로터널의 설계 및 시공시 적용되고 있는 표준지보패턴에 대하여 하중분담률 및 편토압에 따른 거동을 분석하고 발파진동이 중앙벽체에 미치는 영향을 분석하여 적용된 지보재의 적정성 여부를 검토하였다. 그 결과 표준지보패턴에 적용되는 지보량은 적정한 것으로 나타났으나, 이는 특정지형 및 암질 조건을 고려하여 해석 후 선정된 것으로, 향후 2-Arch 도로터널의 설계 및 시공시 최종적인 표준지보패턴 선정은 대상 터널의 지형조건, 토질조건, 시공조건 등을 종합적으로 고려하여 결정되어야 할 것으로 사료된다.

  • PDF