• 제목/요약/키워드: tunnel stability analysis

검색결과 651건 처리시간 0.023초

침투력을 고려한 토사터널 막장의 안정성 평가방법에 대한 고찰 (Evaluation of Tunnel Face Stability with the Consideration of Seepage Forces)

  • 남석우;이인모
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.193-200
    • /
    • 1999
  • Since Broms and Bennermark(1967) suggested the face stability criterion based on laboratory extrusion tests and field observations, the face stability of a tunnel driven in cohesive material has been studied by several authors. And recently, more general solution for the tunnel front is given by Leca and Panet(1988). They adopted a limit state design concept to evaluate the face stability of a shallow tunnel driven into cohesionless material and showed that the calculated upper bound solution represented the actual behavior reasonably well. In this study, two factors are simultaneously considered for assessing tunnel face stability: One is the effective stress acting on the tunnel front calculated by upper bound solution; and the other is the seepage force calculated by numerical analysis under the condition of steady state ground water flow. The model tests were performed to evaluate the seepage force acting on the tunnel front and these results were compared with results of numerical analysis. Consequently, the methodology to evaluate the stability of a tunnel face including limit analysis and seepage analysis is suggested under the condition of steady state ground water flow.

  • PDF

굴착단계를 고려한 2 아치 터널의 안정성 해석 (Stability analysis of a 2 arch tunnel considering excavation sequence)

  • 유광호;박연준
    • 한국터널지하공간학회 논문집
    • /
    • 제4권2호
    • /
    • pp.167-174
    • /
    • 2002
  • 본 연구에서는 시공순서를 고려한 대단면 터널의 안정성 평가를 수치해석에 의해 수행하였다. 일반적으로 터널의 안정성은 최종 굴착 후의 안정성에 의해 판단하는 것이 보통이나, 본 연구에서는 굴착단계별 안정성을 비교·검토하였다. 해석결과를 종합하면, 터널의 안정성에는 별 문제가 없을 것으로 판단되며, 이곳을 시공할 때 계측을 철저히 하는 등의 각별한 주의가 요구된다. 또한, 굴착단계별 안정성을 비교한 결과, 우측 본선터널 상부 반단면 굴착시 (5 단계)의 안정성이 오히려 최종굴착 후의 안정성보다 취약한 것으로 나타났다.

  • PDF

Structural stability evaluation of TBM tunnels using numerical analysis approach

  • Dohyun Kim
    • Geomechanics and Engineering
    • /
    • 제38권6호
    • /
    • pp.583-591
    • /
    • 2024
  • To properly simulate the excavation process and evaluate the structural stability of the tunnel, rigorous large deformation analysis method is necessary. This study applies two most widely used numerical approaches capable of modelling and considering the large deformations behavior during excavation process to analyze and evaluate the structural stability of circular tunnel based on tunnel boring machine (TBM) excavation. By comparing and combining the results from two numerical approaches, the deformation of the excavated ground will be analyzed. The stability of the circular tunnel from TBM tunneling was assessed based on the maximum deformation occurred during the excavation process. From the numerical computation it was concluded that although the range of the damage on the ground done during excavation was found to be larger under hard rock condition, maximum deformation within the circular tunnel structure was larger under weak ground conditions and deeper tunnel depths.

역해석기법을 통한 NATM 터널의 안정성 평가 (Stability Estimation of NATM Tunnel due to Excavation using Back Analysis)

  • 이재호;김영수;김광일;박진규;박시현;최칠용
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.494-504
    • /
    • 2008
  • Successful design, construction and maintenance of NATM tunnel demands prediction, control, stability estimation and monitoring of surface settlement, gradient and ground displacement with high accuracy. Back analysis using measured data and forward analysis have been and are indispensable tools to achieve this goal. Sakurai provided the hazard warning levels for assessing the stability of tunnels using the relation of critical strain and apparent Young's modulus. This paper performed the estimation of tunnel stability on construction. Firstly, the apparent Young's modulus concept and back analysis method is introduced for the assessment of tunnel safety during excavation a brief framework. Secondly, this paper deals with case study using "Apparent Young's modulus" and "Back analysis" for the purpose of estimating the stability of NATM tunnel in Korea. Finally, a general method that can be estimated the tunnel stability discussed by a flow chart.

  • PDF

Analysis of pile group behaviour to adjacent tunnelling considering ground reinforcement conditions with assessment of stability of superstructures

  • Young-Jin Jeon;Cheol-Ju Lee
    • Geomechanics and Engineering
    • /
    • 제33권5호
    • /
    • pp.463-475
    • /
    • 2023
  • Tunnel construction activity, conducted mainly in mountains and within urban centres, causes soil settlement, thus requiring the relevant management of slopes and structures as well as evaluations of risk and stability. Accordingly, in this study we performed a three-dimensional finite element analysis to examine the behaviour of piles and pile cap stability when a tunnel passes near the bottom of the foundation of a pile group connected by a pile cap. We examined the results via numerical analysis considering different conditions for reinforcement of the ground between the tunnel and the pile foundation. The numerical analysis assessed the angular distortion of the pile cap, pile settlement, axial force, shear stress, relative displacement, and volume loss due to tunnel excavation, and pile cap stability was evaluated based on Son and Cording's evaluation criterion for damage to adjacent structures. The pile located closest to the tunnel under the condition of no ground reinforcement exhibited pile head settlement approximately 70% greater than that of the pile located farthest from the tunnel under the condition of greatest ground reinforcement. Additionally, pile head settlement was greatest when the largest volume loss occurred, being approximately 18% greater than pile head settlement under the condition having the smallest volume loss. This paper closely examines the main factors influencing the behaviour of a pile group connected by a pile cap for three ground reinforcement conditions and presents an evaluation of pile cap stability.

대심도 터널의 안정성 해석 방법에 대한 고찰 (A Consideration on the Stability Analysis Method of Great Deep Tunnels)

  • 김주봉;안경철;김영준
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.301-308
    • /
    • 1999
  • The construction of great deep tunnels has become an important part in tunnel construction especially in the mountain area. Therefore, it is necessary to establish the proper method of the stability analysis for great deep tunnels. In this paper presents the study result on the followings: (1) Evaluation of practical problem on the stability analysis of great deep tunnels. (2) Proposal of the proper on method for great deep tunnels analysis considering the depth of overburden. (3) Understanding of the ground behavior of the great deep tunnel through the sensitivity analysis and the parametric study.

  • PDF

근접시공에 대한 수로터널 지반조사 및 안정성 분석 (Site Investigation and stability analysis for water tunnel being neighboring construction)

  • 전제성;김기영;이상덕;김두준
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.550-555
    • /
    • 2005
  • In vicinity of Seoul, there has been water service tunnel that classified into 1st grade facility by special act for the safety control of public structures and with providing capacity equals to $1,543{\times}10^3$(ton/day) and inner pressure equals to $2.5-3.5kg/cm^2$. In this research, site investigation and stability analysis for water tunnel caused by new construction of road tunnel were carried out. the ground near water tunnel were zoned into spatial area having similar geotechnical characteristics and estimating geotechnical properties for each area. The site for analysis consists of banded biotite gneiss, biotite schist and granite gneiss with spatial non-homogeneity, and for that reason weathering and fault zone were distributed with large scale. It's important thing to consider spatial ground zone and their geotechnical properties properly into stability analysis at design and construction stage. Also, using results of site investigation, stability of existing tunnel have been analyzed for Hydraulic Fracture/Jacking and deformation in detail.

  • PDF

암반분류와 Mohr-Coulomb 이론해를 이용한 터널 전구간 안정성 분석 (Analysis of Whole Tunnel Stability by Using Rock Mass Classification and Mohr-Coulomb Analytical Solution)

  • 정용복;박의섭;류동우;천대성
    • 터널과지하공간
    • /
    • 제23권4호
    • /
    • pp.280-287
    • /
    • 2013
  • 터널의 안정성 평가방법 중 유한요소법이나 유한차분법과 같은 수치해석을 수행하면 정밀한 지반거동을 예측할 수 있으나 터널노선 전구간에 대한 수치해석은 경제적으로 비효율적이다. 따라서 본 연구에서는 이론해를 사용하고 이를 적용할 수 있도록 터널을 등가면적의 원형으로 가정하여 터널 전구간에 대한 안정성을 분석하는 방법을 제시하였다. 이를 실제 터널에 적용하여 터널 전구간에 대해 예상되는 변형거동과 정량적인 변형률 및 소성반경을 계산하였고 이로부터 변형을 적정한 수준 이내로 제한하기 위한 지보압을 제시하였다. 적용 결과 제안된 방법은 전체 터널 구간에 대한 신속한 안정성 평가와 주요 불안정 구간에 대한 정밀 해석이나 계측설계와 같은 후속조치를 위한 정량적 자료를 제공할 수 있음을 확인하였다.

컨테이너 크레인의 안정성에 대한 풍동실험과 유한요소해석의 비교 (Comparison of finite element analysis with wind tunnel test on stability of a container crane)

  • 한동섭;이성욱;한근조
    • 동력기계공학회지
    • /
    • 제12권6호
    • /
    • pp.29-35
    • /
    • 2008
  • This study is conducted to provide the proper analysis method to evaluate the stability of a container crane under wind load. Two analysis method, namely structure analysis and fluid-structure interaction, are adopted to evaluate the stability of a container crane in this investigation. To evaluate the effect of wind load on the stability of the crane, 50-ton class container crane widely used in container terminals is adopted for analysis model and 19-values are considered for wind direction as design parameter. We conduct structure analysis and fluid-structure interaction for a container crane with respect to the wind direction using ANSYS and CFX. Then we compare the uplift forces yielded from two analysis with it yielded from wind tunnel test. The results are as follows: 1) A correlation coefficient between structure analysis and wind tunnel test is lower than 0.65(as $0.29{\sim}0.57$), but between fluid-structure interaction and wind tunnel test is higher than 0.65(as $0.78{\sim}0.86$). 2) There is low correlation between structure analysis and wind tunnel test but very high correlation between fluid-structure interaction and wind tunnel test.

  • PDF

단양 석회석 광산터널의 암반 평가 및 안정성 연구 (Study on the stability of tunnel and rock mass classification in Danyang limestone quarry)

  • 신희순
    • 터널과지하공간
    • /
    • 제6권2호
    • /
    • pp.131-143
    • /
    • 1996
  • In-situ survey and laboratory rock test were carried out for rating rock mass around the tunnel that some failures had been occurred in Danyang limestone quarry. For rating rock mass, several methods such as RMR, Q-system, rock strength etc. were applied. The stability analysis on tunnel was evaluated by numerical method FLAC. And The block theory using streographic projection was also applied for stability analysis. The 3-4 major discontinuity sets are distributed in rock mass around tunnel.

  • PDF