• Title/Summary/Keyword: tunnel performance

Search Result 1,144, Processing Time 0.026 seconds

Study on tunnel geometry protecting a propeller using potential based panel method (포텐셜 기저 패널법에 의한 프로펠러 보호터널의 형상변화에 관한 연구)

  • Suh, Sung-Bu
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.31 no.5
    • /
    • pp.614-621
    • /
    • 2007
  • The fishing boat propulsion system employing the modified stern shape and the tunnel to protect a propeller is developed to increase the cruise speed and reduce he problem resulting from the open propeller accidentally catching the waste net and able on the sea. Using 3 different tunnel types, the model test was performed in the circular water channel and the panel method based on the potential theory is applied to analyze the open water performance of the propeller. In the numerical analysis using he potential-based panel method, it calculates the hydrodynamic interaction between the propeller and the tunnel and evaluates the effect of the tunnel geometry. From the numerical and experimental results differing tunnel geometries, the propulsion efficiency is increased by the larger diameter of the inlet than the outlet of the tunnel and the smaller gap between the propeller tip and the tunnel internal surface. These results provide the information of the propeller system with the tunnel and the hydrodynamic interaction between the propeller and the tunnel.

Improvement Plan of Excavation Performance Based on Shield TBM Performance Prediction Models and Field Data (쉴드 TBM 성능예측모델과 굴진자료 분석을 통한 굴진성능 개선방안)

  • Jung, Hyuksang;Kang, Hyoungnam;Choi, Jungmyung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.2
    • /
    • pp.43-52
    • /
    • 2010
  • Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.

The Comparison on Resistance Performance and Running Attitude of Asymmetric Catamaran Changing Angle of Inclination of Tunnel Stern Exit Region (비대칭 고속 쌍동선의 선미터널 출구영역의 경사각 변화에 따른 저항성능 및 항주자세 분석)

  • Kim, Sang-Won;Seo, Kwang-Cheol;Cho, Dea-Hwan;Kim, Byung-Jae;Lee, Gyeong-Woo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2017.11a
    • /
    • pp.232-233
    • /
    • 2017
  • In this research, tunnel stern was applied on the asymmetric high-speed catamaran to evaluate vessel's hydrodynamic performance by numerical method, and the tunnel stern types are distinguished by angle of inclination of tunnel exit region into 3cases ($0^{\circ}$, $3^{\circ}$ and $6^{\circ}$). Consequently, it is confirmed that the total resistances of tunnel stern which have $0^{\circ}$ of inclination are lower about 4.8-17.9% than the bare hull in the wide speed range, but those of $3^{\circ}$ and $6^{\circ}$ of inclination tunnel stern are higher than bare hull about 5-14% and 5-29%, respectively. On the other hand, trim angles of $0^{\circ}$ of inclination tunnel stern show similar trend with those of bare hull in whole ranges of FnV but those of $3^{\circ}$ and $6^{\circ}$ of inclination tunnel stern are stabilized and declined respectively after FnV=1.54. These phenomena indicated that increasing angle of inclination of tunnel exit region had negative influence on resistance performance, however, it could make vessel's operation performance better than bare hull.

  • PDF

Influence of TBM operational parameters on optimized penetration rate in schistose rocks, a case study: Golab tunnel Lot-1, Iran

  • Eftekhari, A.;Aalianvari, A.;Rostami, J.
    • Computers and Concrete
    • /
    • v.22 no.2
    • /
    • pp.239-248
    • /
    • 2018
  • TBM penetration rate is a function of intact rock properties, rock mass conditions and TBM operational parameters. Machine rate of penetrationcan be predicted by knowledge of the ground conditions and its effects on machine performance. The variation of TBM operational parameters such as penetration rate and thrust plays an important role in its performance. This study presents the results of the analysis on the TBM penetration rates in schistose rock types present along the alignment of Golab tunnel based on the analysis of a TBM performance database established for every stroke through different schistose rock types. The results of the analysis are compared to the results of some empirical and theoretical predictive models such as NTH and QTBM. Additional analysis was performed to find the optimum thrust and revolution per minute values for different schistose rock types.

A Study on the Performance Requirement of Noise Absorbing Material for Railway tunnel (터널내부 소음 저감을 위한 흡음제 요구성능에 관한 연구)

  • Cho Jun-Ho;Yang Sin-Chu;Kim Hyung-Jun;Yoon Je-Won;Kim Young-Chan
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.479-483
    • /
    • 2003
  • In general, urban railroad in Korea is constructed as a tunnel type under ground due to the various restricted conditions. Passengers in train running through underground tunnel compare to open space are exposed to severe noise environment. In this study, various performance characteristics of many candidate materials are surveyed and analyzed. And some important characteristics are tested. From this study, various performance requirement for noise reduction in railway tunnel were suggested.

  • PDF

The effect of vehicle velocity and drift angle on through-body AUV tunnel thruster performance

  • Saunders, Aaron;Nahon, Meyer
    • Ocean Systems Engineering
    • /
    • v.1 no.4
    • /
    • pp.297-315
    • /
    • 2011
  • New applications of streamlined Autonomous Underwater Vehicles require an AUV capable of completing missions with both high-speed straight-line runs and slow maneuvers or station keeping tasks. At low, or zero, forward speeds, the AUV's control surfaces become ineffective. To improve an AUV's low speed maneuverability, while maintaining a low drag profile, through-body tunnel thrusters have become a popular addition to modern AUV systems. The effect of forward vehicle motion and sideslip on these types of thrusters is not well understood. In order to characterize these effects and to adapt existing tunnel thruster models to include them, an experimental system was constructed. This system includes a transverse tunnel thruster mounted in a streamlined AUV. A 6-axis load cell mounted internally was used to measure the thrust directly. The AUV was mounted in Memorial University of Newfoundland's tow tank, and several tests were run to characterize the effect of vehicle motion on the transient and steady state thruster performance. Finally, a thruster model was modified to include these effects.

An Efficient Electric Installation Design and Implementation for Electric Railway Tunnels (전기 철도 터널 내 전력설비의 효율적 설계 및 구현)

  • Lee, Gyu-Dae;Jeon, Jeong-Pyo;Kim, Kwang-Ho
    • Journal of Industrial Technology
    • /
    • v.31 no.B
    • /
    • pp.23-26
    • /
    • 2011
  • The efficiency and performance of electric facilities in electric railway tunnels are quite important factors for operation and maintenance of railway since most of maintenance works for railways are doing during the night. Specially, in the railways like Gyeong-Chun Line passing through many mountains, many parts of railways are constructed with tunnels. So, this paper proposes the efficient electrical installation design scheme for railway tunnel considering the system performance, economics, and the reliability of power supply to tunnel electric facilities. Finally, the proposed design scheme is implemented to the tunnel design for Gyeong-Chun Line (Electric Railway).

  • PDF

Dynamic Network Provisioning for Time-Varying Traffic

  • Sharma, Vicky;Kar, Koushik;La, Richard;Tassiulas, Leandros
    • Journal of Communications and Networks
    • /
    • v.9 no.4
    • /
    • pp.408-418
    • /
    • 2007
  • In this paper, we address the question of dynamic network provisioning for time-varying traffic rates, with the objective of maximizing the system throughput. We assume that the network is capable of providing bandwidth guaranteed traffic tunnels for an ingress-egress pair and present an approach that (1) updates the tunnel routes and (2) adjusts the tunnel bandwidths, in an incremental, adaptive manner, based on the variations in the incoming traffic. First, we consider a simpler scenario where tunnel routes are fixed, and present an approach for adjusting the tunnel bandwidths dynamically. We show, through simulations, that our dynamic bandwidth assignment algorithm significantly outperforms the optimal static bandwidth provisioning policy, and yields a performance close to that of the optimal dynamic bandwidth provisioning policy. We also propose an adaptive route update algorithm, which can be used in conjunction with our dynamic bandwidth assignment policy, and leads to further improvement in the overall system performance.

Performance Assesment of the Existing Tunnel drain and higher permeable for the In-plane Test (평면투수 실험을 통한 기존 배수재와 고투수성 배수재의 성능 평가)

  • Ma, Sang-Joon;Lee, Heung-Soo;Choi, Hee-Sup;Kim, Kyung-Duk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1581-1584
    • /
    • 2008
  • In this study, performance Assesment of the existing tunnel drain and higher permeable for the In-plane Test. Two separate simulation tests from geotexitile and Lightweight Foamed Mortar compare. perfomed:the one is the in-plane test and the other is the clogging phenomenon test. As a result, NATM Composite used to Ligheweight Foamed Mortar pemability 80%, more than existing tunnel drain. Also, clogging phenomenon test do low assesment more than existing tunnel drain geotextile.

  • PDF

Evaluation of Support Performance of Fiber-Net Integrated Shotcrete in Tunnel Support System (숏크리트용 섬유 그물망 일체형 터널 지보시스템의 지보 성능 평가)

  • Kim, Jiyoung;Choi, Seongcheol
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.4
    • /
    • pp.545-552
    • /
    • 2020
  • This study evaluated the support performance of fiber-net integrated shotcrete in tunnel support system developed for the purpose of improving constructability and stability while fully performing its mechanical performance as a tunnel support materials by four-point bending test, two-dimensional numerical analysis, and cross-sectional analysis. As a result of evaluating the flexural performance through a four-point bending test, in the case of fiber-net reinforced shotcrete, the tensile performance of fiber-net resulted in a continuous increase in load after crack occurrence, unlike steel fiber reinforced shotcrete. Also, the results of the tunnel cross-sectional structure analysis for ground conditions and the cross-sectional analysis of fiber-net and steel fiber reinforced shotcrete showed that sufficient support performance can be exhibited even if the thickness of fiber-net reinforced shotcrete was reduced compared to the previous one. Additionally, through these results, the support pattern of fiber-net integrated shotcrete in tunnel support system, which can be applied efficiently to the construction sections requiring higher stability among the rock mass class III, was proposed.