A Markov-based prediction model of tunnel geology, construction time, and construction costs

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Ali, Hunar Farid Hama;Salim, Sirwan Ghafoor;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.4
    • /
    • pp.421-435
    • /
    • 2022
  • The necessity of estimating the time and cost required for tunnel construction has led to extensive research in this regard. Since geological conditions are significant factors in terms of time and cost of road tunnels, considering these conditions is crucial. Uncertainties about the geological conditions of a tunnel alignment cause difficulties in planning ahead of the required construction time and costs. In this paper, the continuous-space, discrete-state Markov process has been used to predict geological conditions. The Monte-Carlo (MC) simulation (MCS) method is employed to estimate the construction time and costs of a road tunnel project using the input data obtained from six tunneling expert questionnaires. In the first case, the input data obtained from each expert are individually considered and in the second case, they are simultaneously considered. Finally, a comparison of these two modes based on the technique presented in this article suggests considering views of several experts simultaneously to reduce uncertainties and ensure the results obtained for geological conditions and the construction time and costs.

Three-Dimensional Borehole Radar Modeling (3차원 시추공 레이다 모델링)

  • 예병주
    • Economic and Environmental Geology
    • /
    • v.33 no.1
    • /
    • pp.41-50
    • /
    • 2000
  • Geo-radar survey which has the advantage of high-resolution and relatively fast survey has been widely used for engineering and environmental problems. Three-dimensional effects have to be considered in the interpretation of geo-radar for high-resolution. However, there exists a trouble on the analysis of the three dimensional effects. To solve this problem an efficient three dimension numerical modeling algorithm is needed. Numerical radar modeling in three dimensional case requires large memory and long calculating time. In this paper, a finite difference method time domain solution to Maxwell's equations for simulating electromagnetic wave propagation in three dimensional media was developed to make economic algorithm which requires smaller memory and shorter calculating time. And in using boundary condition Liao absorption boundary. The numerical result of cross-hole radar survey for tunnel is compared with real data. The two results are well matched. To prove application to three dimensional analysis, the results with variation of tunnel's incident angle to survey cross-section and the result when the tunnel is parallel to the cross-section were examined. This algorithm is useful in various geo-radar survey and can give basic data to develop dat processing and inversion program.

  • PDF

A Study on the Stability Analysis and Countermeasure of Tunnel Portal Failure Slope - in Suanbo Hot Springs 1 and 2 Tunnel Failure Site (터널 갱구부 붕괴 사면의 안정성 해석 및 보강공법에 관한 연구 - 수안보 온천 1, 2터널 붕괴 현장을 중심으로)

  • Baek, Yong;Koo, Ho-Bon;Yoo, Ki-Jeong
    • The Journal of Engineering Geology
    • /
    • v.12 no.4
    • /
    • pp.367-378
    • /
    • 2002
  • Recently, the number of tunnels on national roads has been increased due to the trend that construction of the large-scaled cut slopes is limited because of the environmental issues. Therefore, the slope failures of tunnel portal have often occurred. The tunnel portal in use has limitations on selection of the countermeasure and construction against slope failure. In the cases of Suanbo hot springs 1 and 2 tunnel portals, seedding was chosen and constructed as the countermeasureof slope failure when the tunnel was first built but collapsed in April, 2002. In this study, the failure sites were examined accurately through the site investigation and an efficient countermeasure according to stability analysis is presented. It is shown that it is very efficient to use resloping for Suanbo hot springs 1 tunnel and concrete buttress, rock anchor to reinforcement countermeasure, and attached rockfall prevention net by dividing the site into 3 sections for Suanbo hot springs 2 tunnel.

Evaluation of Groundwater Level Decline and Water Quality Due to Tunnel Excavation (터널굴착으로 인한 지하수위 저하 및 수질영향 평가)

  • Kim, Min Gyu;Kim, Minsoo;Jeong, Gyocheol;Lee, Jeongwoo;Chung, Il-Moon
    • The Journal of Engineering Geology
    • /
    • v.29 no.2
    • /
    • pp.113-122
    • /
    • 2019
  • In this study, the flow analysis to evaluate the extent of groundwater decline and the effect of the small valleys caused by the decrease of groundwater level in the construction of road tunnel, and the pollutant movement analysis to evaluate pollution of nearby water source by pollutant discharge during tunnel construction, respectively. The decrease of the groundwater during the 30 month tunnel excavation period was maximum 27 m and it was found to be the largest within 50 m from the tunnel center. The flow of groundwater is shown in the form of flowing into the tunnels and the effects of groundwater level decline were observed up to a tunnel radius of 200 m. As a result of the numerical modeling of the contaminant transport to examine the influence of the polluted water discharge from the tunnel, the range of the turbid water generated at the end of the tunnel is up to 120 m and it is estimated that the risk of contamination of the small river is not large.

Effect of the Yeongcheon Dam Waterway Tunnel, Korea, on Local Groundwater Levels (영천댐 도수터널 주변지역 지하수위 영향 분석)

  • Gyu-Han Kim;Seong-Woo Moon;Yong-Seok Seo
    • The Journal of Engineering Geology
    • /
    • v.33 no.3
    • /
    • pp.461-474
    • /
    • 2023
  • The study area is located in Hyeonseo-myeon and Andeok-myeon of Cheongsong-gun, Korea around the Yeongcheon dam waterway tunnel, and in this paper, it is analyzed whether the groundwater level is recovered or not compared to groundwater level before waterway tunnel construction by measuring the groundwater level of 156 wells which were installed in areas near and away from the waterway tunnel. From September 2017 to August 2018, the groundwater level of the well was measured at least once a month, and as a result of groundwater level observation survey, the groundwater level of wells distributed in the directly affected zone by the waterway tunnel is relatively lower than that of the indirectly affected zone apart from the waterway tunnel. These results are estimated to be predominantly affected by the effect of waterway tunnel acting on geologic discontinuities rather than by terrain conditions, i.e. groundwater flows being leaked to the waterway tunnel through direct or indirect channels. Continuous monitoring and further investigation will be required to maintain groundwater facilities and preserve groundwater environments in the future.

Assessment of Tunnel Displacement with Weak Zone Orientation using 3-D Numerical Analysis (3차원 수치해석을 이용한 연약대 방향에 따른 터널 거동 특성 평가)

  • Yim, Sung-Bin;Jeong, Hae-Geun;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.19 no.1
    • /
    • pp.43-50
    • /
    • 2009
  • A 3-D numerical analysis was carried out to observe potential effects of orientation of inherent weak zones to tunnel behaviors and stress distributions during tunnel excavation. Weak zones used for the analysis were placed at the upper 1D part from crown, on the crown and on the center of face, using orientations derived from the 6th RMR parameter for assessment of joint orientation effect on tunnel. Mechanical properties of rock mass were derived through a in-situ displacement measurement-based back analysis. Finally, a classification chart for crown settlement with five ranks based on orientation and location of weak zones is suggested.

Stability Analysis of Existing Tunnel in Stratified Sedimentary Rocks Subjected to Bridge Pier Load (퇴적암 지역에서의 교각 기초 하중을 받는 기존터널의 안정성에 대한 해석적 고찰)

  • 김교원
    • The Journal of Engineering Geology
    • /
    • v.8 no.2
    • /
    • pp.153-161
    • /
    • 1998
  • An anisotropic characteristics of stratified sedimentary rocks should be considered in the design of tunnel. The second line of Taegu subway is under construction through the sedimentary rocks which is stratified by alternation of shale and sandstone, and Tongsoe over bridge road is planned to be constructed along the subway line. Thus the subway twin tunnels will be subjected by the bridge load of 76.2 MN per pier that will be placed in between the twin tunnels of the subway line. A numerical analysis is carried out for the stability of the twin tunnel, and the result shows that the maximum principal stress of surrounding ground is increased by 5∼6 MPa and the additional displacement of concrete lining is reached up to 8∼10mm due to the external bridge load. For the safety operation of the subway, reinforcement of the tunnel structure is highly recommended.

  • PDF

3D Resistivity Survey at a Collapsed Tunnel Site (붕락 터널에서의 3차원 전기비저항 탐사)

  • Cho, In-Ky;Kim, Ki-Seog;Lee, Keun-Soo
    • Geophysics and Geophysical Exploration
    • /
    • v.18 no.1
    • /
    • pp.14-20
    • /
    • 2015
  • Three-dimensional (3D) resistivity method is an effective tool in the engineering site survey because it can provide a 3D resistivity distribution of the site. In this study, we tried to find out faults, fractures and coal seams that can cause the collapse of the tunnel. We carried out 2D resistivity survey along 5 parallel lines and 11 cross lines and merged all the apparent resistivity data for 3D inversion. Finally, from the 3D resistivity image and drilling data we presented the 3D distribution of faults, fractures and coal seams that are considered the main cause of the tunnel collapse.

Sensitivity Analysis of a Transient Groundwater Flow Modeling for Tunnel Excavation (터널 굴착에 따른 지하수 유동계의 변화에 대한 수리상수들의 민감도 분석)

  • Jeong Bok- Seon;Koo Min-Ho;Kim Yongje;Lee Jin-Yong
    • The Journal of Engineering Geology
    • /
    • v.14 no.3 s.40
    • /
    • pp.287-300
    • /
    • 2004
  • By using a simple conceptual model, a sensitivity analysis is performed to examine the effects of changing model parameters on the model outputs, the groundwater discharge and the radius of influence, induced by tunnel construction. The results indicate that the model outputs are most sensitive to the tunnel depth and the hydraulic conductivity, and their sensitivities vary with time. It is also revealed that the sensitivity of the specific yield in- creases constantly with time, and therefore it is as important as the hydraulic conductivity for constructing a wet-system tunnel. A transient model is suggested to simulate the stepwise tunnel excavation and the watertight lining. The model is used for a tunnel construction site to predict groundwater mow into the tunnel and the transient response of the surrounding aquifer system. The predicted results are highly sensitive to the hydraulic conductivites assigned by model calibration. Thus, a postaudit should be made to reduce the uncertainty of the predictive model.

Visualization of Tunneling Using a BIM-based 3D Tunnel Model (BIM 기반 3D 터널 모델 가시화에 관한 연구)

  • Yoo, Wan-Kyu;Kim, Jinhwan;Zheng, Xiumei;Kim, Jeong-Heum;Gi, Sang-bok;Kim, Chang-Yong
    • The Journal of Engineering Geology
    • /
    • v.25 no.3
    • /
    • pp.395-401
    • /
    • 2015
  • An investigation of the tunnel face, as well as related measurement data collected during tunneling, is necessary for rock classification and to determine tunnel stability and the cost efficiency of tunneling. However, systematic management and efficient use of such data have yet to be successfully implemented domestically, and the number of experts in this field in Korea is limited. Thus, measures to develop and implement systematic management and effective use of data and expertise are urgently needed. This study aimed to develop measures to efficiently provide online tunnel design and construction data using a building information model (BIM)-based data visualization approach, based on an integrated 3D tunnel model generation module and a web viewer module. The development technology was verified through ○○ tunnel design and construction. Directions for future study and system improvement are proposed.