• Title/Summary/Keyword: tunnel geology

Search Result 201, Processing Time 0.023 seconds

The Lateral Earth Pressure Distribution of the Earth Retaining Structure Installed in Colluvial Soil (붕적토에 설치된 흙막이구조물의 측방토압분포)

  • Hong, Won-Pyo;Yea, Geu-Guwen
    • The Journal of Engineering Geology
    • /
    • v.18 no.4
    • /
    • pp.433-437
    • /
    • 2008
  • It's essential to build an earth retaining structure at the beginning and end point of a tunnel constructed in a colluvium area. A large scale of colluvial soil may cause a problem to the stability of the excavation ground. An excavation in colluvium has different behavior characteristics from those in a sandy soil due to unstable elements and needs counter measures for it. There are few systematic research efforts on the behavior characteristics of an earth retaining structure installed in colluvial soil. Thus this study set out to collect measuring data from an excavation site at the tunnel pit mouth in colluvium and set quantitative criteria for the safety of an earth retaining structure. After comparing and analyzing the theoretical and empirical earth pressure from the measuring data, the lateral earth pressure distribution acted on the earth retaining wall was suggested.

Tunneling in Severe Groundwater Inflow Condition (지하수 과다유입 조건하에서의 터널굴착)

  • Lee, Young-Nam;Kim, Dae-Young
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.2
    • /
    • pp.67-76
    • /
    • 2006
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3 m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3km upstream of the powerhouse and headrace tunnel of 20km in length and penstock of 440m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflowraised the water level inside tunnel to 70cm, 17% of tunnel diameter (3.9m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made forthe excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

Stability Analysis on the Intersection Area of Subway Tunnels by Observational Method (계측에 의한 지하철터널 교차부의 안정성 검토)

  • Kim Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.15 no.1 s.54
    • /
    • pp.71-79
    • /
    • 2005
  • The stability of the intersection area of two tunnels is analyzed by observational method. The depth from ground surface to the intersected area is shallow and the geology around the area consists of soil and/or weathered rock. The tunnel is supported by reinforced protective umbrella method with 12 m long 3-layer steel-pipes and the intersected area is additionally reinforced with 6 m long rockbolts. The measured displacements are converged and mechanical stability of the intersected area of two tunnels is confirmed; tunnel arch settles to 6-7 mm at the crown and the sidewalls converges to about 5 mm. So based on the displacement measurements, the supporting system for the tunnel intersection proves to be effective to not only reduce the deformation of tunnels but also maintain the stability of tunnels.

The effect of ball size on the hollow center cracked disc (HCCD) in Brazilian test

  • Haeri, Hadi;Sarfarazi, Vahab;Zhu, Zheming;Moradizadeh, Masih
    • Computers and Concrete
    • /
    • v.22 no.4
    • /
    • pp.373-381
    • /
    • 2018
  • Hollow center cracked disc (HCCD) in Brazilian test was modelled numerically to study the crack propagation in the pre-cracked disc. The pre-existing edge cracks in the disc models were considered to investigate the crack propagation and coalescence paths within the modelled samples. The effect of particle size on the hollow center cracked disc (HCCD) in Brazilian test were considered too. The results shows that Failure pattern is constant by increasing the ball diameter. Tensile cracks are dominant mode of failure. These crack initiates from notch tip, propagate parallel to loading axis and coalescence with upper model boundary. Number of cracks increase by decreasing the ball diameter. Also, tensile fracture toughness was decreased with increasing the particle size. In this research, it is tried to improve the understanding of the crack propagation and crack coalescence phenomena in brittle materials which is of paramount importance in the stability analyses of rock and concrete structures, such as the underground openings, rock slopes and tunnel construction.

Reinforcement Effect of Viscoplastic Rockboft - Numerical Study (록볼트 점소성 거동에 의한 지보효과 분석 - 수치해석)

  • 조태진;이정인
    • The Journal of Engineering Geology
    • /
    • v.3 no.3
    • /
    • pp.215-230
    • /
    • 1993
  • In-situ rock mass demonstrates the variety of structural features, and especially the mechanical and spatial characteristics of joint (or joint system) greatly affect the deformation and fallure strength of the rock mass. In this study finite element model capable of analyzing the viscoplastic behavior of reinforced jointed rock mass has been developed based on equivalent material approach. Accuracy and reliability of the numerical model have verified by simuiating the behavior of simplified block model and comparing the results with analytic solutions. Practical applicability was also demonstrated by analyzing the time-dependent behavior of underground oil storage tunnel and assessing the reinforcement effect of rockbolt.

  • PDF

Mechanical Properties of Fault Rocks in Korea

  • Seo, Yong-Seok;Yun, Hyun-Seok;Ban, Jae-Doo;Lee, Chung-Ki
    • The Journal of Engineering Geology
    • /
    • v.26 no.4
    • /
    • pp.571-581
    • /
    • 2016
  • To understand the mechanical properties of fault rocks, data from 584 in situ and laboratory tests on fault rocks from 33 tunnels were analyzed. The unit weights of the fault rocks range from 17.3 to $28.2kN/m^3$ and the cohesion and friction angles vary from 5 to 260 kPa and $14.7^{\circ}$ to $44.0^{\circ}$, respectively. The modulus of deformation and elasticity were generally < 200 MPa. In most cases, the uniaxial compressive strength was < 0.5 MPa, and Poisson's ratios were mainly 0.20-0.35. The mechanical properties of individual rock types were analyzed using box plots, revealing that the cohesion values and friction angles of shale and phyllite have relatively wide inter-quartile ranges and that the modulus of deformation and elasticity of shale have the lowest values of all rock types. In the analysis of mechanical properties by components of fault rocks, the largest values were shown in damage zones of individual rock types.

Geological and Geophysical Surveys for Determining Causes of Rack Slides (암반사면 사태의 원인규명을 위한 지질조사 및 전기비저항 탐사)

  • 황학수;이태섭;기원서;박종오;문창규;최정환
    • The Journal of Engineering Geology
    • /
    • v.11 no.3
    • /
    • pp.295-301
    • /
    • 2001
  • Geological and geophysical surveys were performed to examined the cause of the rock-mass slide occurred at the opening site of the Wanglim tunnel of the Seoul-Pusan High Speed Railway. The results of geophygical survey and geometrical analysis for the geological structures indicate that the rock-mass slide was triggered by the heavy rainfall which increases the groundwater level and results in high pore pressure in the N60$^{\circ}$ E-trending major fractured zone of the slope, and that the foliation dipping toward the vertical open face of the slope acted as a main sliding plane during movement.

  • PDF

Case Studies for the Stress Measurements on the Shotcrete Tunnel Lining (터널에서의 숏크리트 응력 측정 사례 연구)

  • Kim, Hak Joon;Kim, Mi-Ran
    • The Journal of Engineering Geology
    • /
    • v.24 no.1
    • /
    • pp.81-89
    • /
    • 2014
  • Stress measurements of shotcrete lining were performed to evaluate the stability of the primary lining and to determine the thickness and the construction timing of the secondary lining. The current situation of stress measurements of shotcrete and problems related to judging the safety of shotcrete linings are presented, based on the results of several case studies. An improved method of performing stress measurements on shotcrete lining is also presented. In evaluating the safety of shotcrete lining, the use of absolute values of measured stresses would improve the reliability of the measurements.

A Study on the Cause Analysis of the Ground Subsidence in Limestone Mine (석회석 광산에서 발생한 지반침하에 대한 원인 분석 연구)

  • Lee, Sangeun;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.30 no.4
    • /
    • pp.497-514
    • /
    • 2020
  • This study investigated the causes of large-scale ground subsidence in the upper part of mining cavities of the Samdo limestone mine, Samcheok city, Gangwondo, Korea. Geological and electrical resistivity surveys were undertaken on the collapsed slope of the mountain and in the mine tunnel where subsidence occurred, with geotechnical evaluations and numerical analysis. It is concluded that wide mining cavities, with irregular pillars in unstable rock masses hosting discontinuities, weathered over time, resulting in subsidence occurring along a fault plane due to increasing ground stress.

Survey of the Geology and Geological Structure of the Foundations at a Construction Site for Tram (경전철 건설구간의 지질 및 지질구조특성에 관한 지반조사)

  • Lee, Byung-Joo;SunWoo, Chun;Chae, Byung-Gon
    • The Journal of Engineering Geology
    • /
    • v.20 no.3
    • /
    • pp.329-338
    • /
    • 2010
  • The foundation area for tram contains biotite gneiss, quartzo-feldspathic gneiss, calc-silicate rock, and porphyroblastic gneiss of the pre-Cambrian Kyeonggi gneiss complex. These rocks record at least three stages of deformation, as indicated by fold sets of contrasting orientations (D1-D3). Joints are generally steeply dipping and strike NW-SE to WNW-ESE. The Gonjiam Fault, which strikes WNW-ESE, follows a river in the area. The fault possesses a 3-m-wide fracture zone, a 10-m-wide damage zone, and is 15 km long. Two tunnels have been constructed through the biotite gneiss. The geometric relationship between discontinuities (e.g., joints and foliation) and tunneling direction reveals that set 3 of the AA tunnel is unstable but that BB tunnel is relatively safe.