Study on Reducing Overbreak in Tunnel Excavation (터널에서의 여굴 저감 방안에 관한 연구)

  • Bae Sang-Hun;Kim Dae-Sang;Kim Mu-Il
    • Explosives and Blasting
    • /
    • v.23 no.1
    • /
    • pp.41-46
    • /
    • 2005
  • Overbreak is an inevitable during tunnel excavation. It significantly affects tunnel construction cost and safety The overbreak occurs due to incorrect expectations to the geologic structures, excessive charge or strength of explosives, etc. This paper introduces multi-hole drilling method to minimize the overbreak in tunnel excavation. Although the drilling cost of the method is more expensive than those of the existing other drilling method, it is expected at that cost will be reduced.

2D numerical investigation of twin tunnels-Influence of excavation phase shift

  • Djelloul, Chafia;Karech, Toufik;Demagh, Rafik;Limam, Oualid;Martinez, Juan
    • Geomechanics and Engineering
    • /
    • v.16 no.3
    • /
    • pp.295-308
    • /
    • 2018
  • The excavation of twin tunnels is a process that destabilizes the ground. The stability of the tunnel lining, the control of ground displacements around the tunnel resulting from each excavation and the interaction between them must be controlled. This paper provides a new approach for replacing the costly 3D analyses with the equivalent 2D analyses that closely reflects the in-situ measurements when excavating twin tunnels. The modeling was performed in two dimensions using the FLAC2D finite difference code. The three-dimensional effect of excavation is taken into account through the deconfinement rate ${\lambda}$ of the soil surrounding the excavation by applying the convergence-confinement method. A comparison between settlements derived by the proposed 2D analysis and the settlements measured in a real project in Algeria shows an acceptable agreement. Also, this paper reports the investigation into the changes in deformations on tunnel linings and surface settlements which may be expected if the twin tunnels of T4 El-Harouche Skikda were constructed with a tunneling machine. Special attention was paid to the influence of the excavation phase shift distance between the two mechanized tunnel faces. It is revealed that the ground movements and the lining deformations during tunnel excavation depend on the distance between the tunnels' axis and the excavation phase shift.

Application of Seismic Reflection Method in the tunnel of Youngdong Railroad(Mt. Dongbaek~Dokye) (영동선 동백산-도계간 터널내 반사법 탄성파탐사 적용사례)

  • 김용일;윤영훈;조상국;양종화;김장수;이내용
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.696-708
    • /
    • 2002
  • Seismic Reflection Methods(TSP, HSP) have been applied in the junction between 2nd Adit and Main Tunnel (Solan Tunnel) of Youngdiong Railroad(Mt. Dongbaek∼Dokye). In this paper, methods and case study will be introduced to predict discontinuties in the tunnel before excavation by the Seismic Reflection Methods(TSP, HSP)and secure construction stability of the tunnel in blasting and excavation.

  • PDF

Improvement Plan of Excavation Performance Based on Shield TBM Performance Prediction Models and Field Data (쉴드 TBM 성능예측모델과 굴진자료 분석을 통한 굴진성능 개선방안)

  • Jung, Hyuksang;Kang, Hyoungnam;Choi, Jungmyung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.2
    • /
    • pp.43-52
    • /
    • 2010
  • Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.

Modeling the Effect of Excavation Sequence and Reinforcement on the Response of Tunnels with Discontinuous Deformation Analysis Method (불연속 변형 해석법에 의한 굴착순서 및 지반보강이 터널의 거동에 미치는 영향 모델링)

  • 김용일;김영근
    • Tunnel and Underground Space
    • /
    • v.10 no.1
    • /
    • pp.25-32
    • /
    • 2000
  • This paper presents two new extensions to the DDA method. The extensions consist of sequential loading or unloading and rock reinforcement by rockbolts, shotcrete or concrete lining. Examples of application of the DDA method with the new extensions are presented. Simulations of the underground excavation of the Unju Tunnel of Kyungbu High Speed Railway Project in Korea were carried out to evaluate the influence of excavation sequence and reinforcement on the tunnel stability. The results of the present study indicate that improper selection of excavation sequence could have a destabilizing effect on the tunnel stability. On the other hand, reinforcement by rockbolts and shotcrete can stabilize the tunnel. It is found that, in general, the DDA program with the three new extensions can now be used as d practical tool in the design of underground structures. In particular, phases of construction (excavation, reinforcement) can now be simulated more realistically.

  • PDF

Development of Rockmass Predictiom System during tunnel excavation(Sol-An Tunnel) (터널 굴착시 암반예측시스템 개발(솔안터널))

  • Kim Yong-Il;Cho Sang-Kook;Yang Jong-hwa;Kim Jang-Soo;Lee Nai-Yong
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.53-67
    • /
    • 2003
  • In this paper, a new systematic method will be introduced, in which a Rock-mass Prediction System(RPS) predicts the geological conditions and rock mass movements before tunnel excavation and the appropriate counter-measures are taken in the expected weak zones during tunnel construction. The Rock-mass Prediction System(RPS) consists of the LIM, a horizontal con drilling and a seismic exploration method (TSP/HSP). In the Rock-mass Prediction System(RPS), the seismic exploration method (TSP/HSP) gives information on the locations of the weak zones such as major faults and voids in wide-range, and the horizontal core drillings are utilized to find exact location and widths of the faults or voids near the weak zones which was predicted by the seismic exploration method (TSP/HSP). The LIM is used to find the hardness of the rock mass and small weak zones near the excavation face. The Rock-mass Prediction System(RPS) was successfully applied to the Sol-An Tunnel and the effectiveness of the system was verified.

  • PDF

Safety Assessment to Construction Position of Constructed Steel Structures under Declinating Earth Pressure (편토압을 받는 파형강판 구조물의 시공위치별 안전성 평가)

  • Lee, Sang-Hyun;Lim, Heui-Dae
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.1
    • /
    • pp.28-34
    • /
    • 2008
  • The corrugated steel plate structures is applied to the construction of mountain tunnel portal part with shallow depth, the tunnel on the outskirts of urban areas and ecology move passage. In this study, A finite element method is used for research the behavior of corrugated steel plate structures due to construction position under declinating earth pressure and excavation depth. A finite element method were performed varying construction position(10, 15, 20 and 25m) from slope and excavation depth from surface. The hoop thrust and moment, displacement of corrugated steel plate subjected to construction position and excavation depth is determined from a finite element method. From results of finite element method, it was found that the increase of thrust and the decrease of displacement as the amount of distance increase from slope with construction position. But the thrust and moment, displacement has not different value with excavation depth.

A Study on the Excavation of Tunnel Portal Zone Located at High Steep Slope (급경사 지형에 위치하고 있는 갱구부의 굴착 방안 연구)

  • Kim, Woo-Sung;Lee, Sang-Eun
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.38-44
    • /
    • 2008
  • Recently, planning road construction in South Korea is focused on upgrading of the existing road by rerouting or restructuring. For this, roads under current construction in Korea go for more straight in its alignments and routing. Straight routing makes it all the more required to construct many mountain tunnels and bridges in Korea where mountains are so widely spread. Some portal of mountain tunnel is not rarely planed at high steep slope of mountain valley where it is not easy to secure working space for tunnel excavation. Reverse excavation is an alternative measure for excavation of tunnel portal at high steep slope. Construction in reverse excavation method has three important points requiring careful consideration: 1)planning of pilot tunnel in proper width, height, and length etc., 2)measure against the effect of one-side earth pressure to the direction of tunnel portal, 3)securing tunnel safety against shallow ground condition at portal zone. This paper intends to suggest applicable range of pilot tunnel for reverse excavation at the portal zone located at high steep slope, and shows result of study on the appropriateness of a reverse excavation by means of 3D numerical analysis. Result of 3D numerical analysis for reverse excavation at high steep slope shows that pilot tunneling will be applicable to start from the point $20{\sim}25m$ before the portal from inside the tunnel.

Revisions on the payline for overbreak in Tunnel

  • Park, T.;Ahn, B.;Baek, S.;Tae, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.714-715
    • /
    • 2015
  • Drill and blast method has been most widely used in tunnel excavation, after NATM (New Austrian Tunneling Method) was introduced in 1983. The NATM method utilized mass of shotcrete to secure the bearing capacity of tunnels. Overbreak defined how much larger the actual excavation was than the planned. When it became larger, more shotcrete was required to fill in it Here, payline fixed allowable overbreak, referring to payable amounts of shotcrete. Since owner was not responsible for shotcrete exceeding payline, it was important to properly establish the standards for payline. Although the standards were provided in 'Poom-sam'(standardized quantity per unit), they did not properly reflect the actual conditions for excavation. Thus, this study reviewed existing domestic and foreign standards for overbreak, and estimated overbreak for each type of support using survey data, and finally provided the improvements on the current standards.

  • PDF

A study on the shallow tunneling method using cover structure (복개 구조물을 이용한 저토피 계곡부 터널의 통과방안에 대한 연구)

  • Chung, Yong-Jin;Nam, Hyun-Woo;Choi, Ho-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.564-569
    • /
    • 2005
  • Usually, Steel pipe grouting method or cut and cover method has been applied to tunnel with very shallow overburden or it is situated in valley. However, in case of lack of overburden height to reinforcement tunnel crown which is very difficult to construction. Also, application of cut and cover method that do not consider surrounding site condition causes popular enmity generation and environmental damage. It is the best alternative method that reduces the amount of excavated soil and excavate tunnel under ground to solve these problems. The tunneling method using cover structure which is to prevent a tunnel from collapse because this method can be reduce excavation area and construct tunnel under ground after set a cover structure and backfill ground. In this study, to know more effective structure type, comparative analysis was performed to behavior characters of slab and arch type construction that can be used to cover structure. Also a 2D and 3D numerical analysis have been performed to verify the stability of ground during excavation. As the result, the tunneling method using cover structure that it can be good alternative method for tunnel with shallow overburden and it through valley