Estimation of RPS Method Using 3-Dimensional Numerical Analysis (3차원 수치해석을 이용한 RPS 공법의 적용성 평가)

  • Roh, Jeong-Min;Shin, Eun-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.174-179
    • /
    • 2006
  • Recently, the crossing tunnel has been constructed frequently to connect the separated area by highway and railroad. The construction of crossing tunnel must be progressed while maintaining the existing traffic of the highway as well as railroad. There are many cross funnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross funnelling methods are needed a little volume of concrete and easy to change the direction of cutting shoe during the construction of pipe roof, The 3-dimensional numerical analysis of RPS to consider the arching effect was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

Case Study of Environmental Impact Assessment about Groundwater Outflow during Railroad Tunnel Construction (철도건설사업시 터널지하수 유출에 관한 환경영향평가 사례 연구)

  • Lee Jeongho;Yoo Heonseok;Lee Young Soo;Park Chang Sug
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.303-308
    • /
    • 2004
  • It is recently reported that the importance of environmental impact assessment(EIA) about groundwater outflow problems is beingy raised in the case of tunnel excavation during railroad construction. The EIA about groundwater outflow into railroad tunnel is generally performed using the results of numerical analysis embodied through groundwater flow modeling program like MODFLOW. The basic data for this modeling include (1) the geological and hydrogeological investigation data along the planned block of tunnel excavation, (2) total amount of outflowed groundwater during tunnel excavation, and (3) the status of groundwater level fluctuation in the water-supply wells distributed in the planned block of tunnel excavation. In this study, the authors analyzed the cases of the computational modeling about groundwater outflow in three planned blocks of railroad tunnel, and suggest the environmental impact factors and mitigation plan during EIA of tunnel excavation in railroad construction.

  • PDF

A Case Study on Construction of Tunnel at Limestone Cavity Site (석회암공동 분포지역에서의 터널 시공사례)

  • Kim, Si-Kyeok;Kang, In-Seop;Kim, Yong-Ha;Yoon, Il-Byung;Moon, Hoon-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.66-75
    • /
    • 2006
  • As construction for road tunnel is increasing, various geotechnical conditions can be faced during the construction stage. Especially, if the tunnel is located in limestone area, many kinds of site investigations such as in-situ boring, electrical resistance survey, TSP(Tunnel Seismic Prediction) and etc., are conducted before and during the construction. By conducting these preliminary tests, location, size, and filling materials in limestone cavities can be approximately estimated. Once some cavities which can be harmful for tunnel safety are predicted, methods for ground reinforcement and tunnel excavation, corresponding those ground conditions, have to be established and verified by measurement data and numerical analysis. If necessary, invert lining should be also considered. In this paper, by studying some cases of tunnels constructed in limestone area, predicted problems during construction and rational countermeasures for those are presented.

  • PDF

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.

Deformation characteristics of surrounding rock in the intersection area between main tunnel and construction adit of the Xianglushan tunnel

  • Yunjuan Chen;Mengyue Liu;Fuqiang Yin;Lewen Zhang;Jing Wu;Jinrui Li
    • Geomechanics and Engineering
    • /
    • v.38 no.1
    • /
    • pp.1-13
    • /
    • 2024
  • The construction adit plays a pivotal role in enhancing the working face during the excavation of long-distance and deep hydraulic tunnels. However, the intersection zone between the main tunnel and the construction adit exhibits more intricate deformation patterns in surrounding rock, posing a significant threat to stability during excavation. Taking the Xianglushan tunnel in Yunnan Province, China, as a case study, the FLAC3D software is employed to simulate the excavation process at the intersection. The simulation results are verified combined with the field deformation monitoring results, and the spatial distribution of tunnel rock deformation in the intersection area are analyzed. Five excavation conditions with different intersection angles are simulated, and the surrounding rock deformation of the tunnel intersection area with different intersection angles is analyzed, and its influence range is discussed. The results show that: (1) The surrounding rock deformation in the intersection area increases rapidly during the tunnel excavation. With the increase of construction distance, the deformation of intersection area is gradually stable. (2) The deformation distribution of the tunnel rock is uneven, and the deformation of main tunnel near the intersection area is larger than that far away from the intersection area. (3) With the increase of the intersection angle, the surrounding rock deformation of the tunnel intersection and its influence range decreases gradually. The research results have certain guiding significance for the construction safety of the tunnel intersection area.

A study on the EVA reforming processes transparency sheet and nonwoven warm air point adhesion using of tunnel waterproofing method. (EVA개질 투명시트와 부직포를 열풍 점융착한 일체형 방수시트를 이용한 터널방수공법에 관한 연구)

  • Seon Yun-Suk;Kim Jaun-Sull;Kim Su-Ryon;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.185-190
    • /
    • 2005
  • Safe, economical and environment-friendly tunnel construction are required again along with social continuous development, the importance of waterproof work that is portion that actually all of user and builder can find that is embossed by tunnel construction's one of important construction. Also, ECB (Ethylen Copolymer Bitumen) sheet that is used in existing tunnel waterproofing method (ECB waterproofing method) being black because asphalt (Bitumen) is added, by purpose that make illumination of tunnel interior brightly and scar discovery eases in sheet with coating white film, but ECB that is used present according as ECB that asphalt is added does not satisfy high tensile strength of construction field, quality standard of extension. Also ECB denigrates color of black M/B that asphalt is excepted.

  • PDF

Technical lessons learnt from the case history of tunnel collapses (터널 붕괴사례로 부터의 기술적 교훈)

  • Shin, Hyu-Soung;Kwon, Young-Cheul;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.835-844
    • /
    • 2009
  • In this study, a database composed by 46 cases of tunnel collapses has been built up. Based on the database, comprehensive data analysis is carried out, providing us a number of the technical lessons, which can be considered in future design and construction to minimize possibility of tunnel collapse disaster. For making a better understanding, the technical lessons are given in two divisions: mountain tunnel and urban tunnel. Tunnel collapses taking place in the former tunnel are generally due to bad discontinuity condition of jointed rock mass. Otherwise, urban tunnel has weak condition generally on ground water and weathering of ground. Most of technical comments given in this paper are made based on the cases of tunnel collapses only used in this study, so that the comments seems to be hard to be available to all the tunnelling cases. However, the comment should be valuable technical lessons for tunnel engineers to consider in tunnel design or construction.

  • PDF

A Case on Design and Construction of Tunnel for Under Passing an Underground Transformer Substation (지중변전실 하부통과를 위한 터널설계 및 시공사례)

  • 정동호;문상조;김선홍;이광제;석진호
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.11-18
    • /
    • 2001
  • This is a case history on design and cnostruction of tunnel for under passing an underground transformer substation. The original construction plan was cut & cover method to avoid blasting vibrations and displacements of facilities during the construction stages. But this plan was changed to tunnel because of the difficulties from construction period, cost and the required relocation site. As a results of tunnel construction, the relocation of transformer substation and replacements of transmission cables were not necessary. Therefore about 10 months of construction period and 3.5 billion wonts of construction cost were saved. Additionally, quantitative criterion for blasting was provided through the results of blasting vibration analysis.

  • PDF

Prediction of duration and construction cost of road tunnels using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Ali, Hunar Farid Hama;Nejati, Hamid Reza;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.1
    • /
    • pp.65-75
    • /
    • 2022
  • Time and cost of construction are key factors in decision-making during a tunnel project's planning and design phase. Estimations of time and cost of tunnel construction projects are subject to significant uncertainties caused by uncertain geotechnical and geological conditions. The Gaussian Process Regression (GPR) technique for predicting ground condition and construction time and cost of mountain tunnel projects is used in this work. The GPR model is trained with data from past mountain tunnel projects. The model is applied to a case study in which the predicted time and cost of tunnel construction using the GPR model are compared with the actual construction time and cost for model validation and reducing the uncertainty for the future projects. In addition, the results obtained from the GPR have been compared with to other models of artificial neural network (ANN) and support vector regression (SVR) that the GPR model provides more accurate results.

Site Investigation and stability analysis for water tunnel being neighboring construction (근접시공에 대한 수로터널 지반조사 및 안정성 분석)

  • Jeon, Je-Sung;Kim, Ki-Young;Lee, Sang-Duk;Kim, Doo-Jun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.550-555
    • /
    • 2005
  • In vicinity of Seoul, there has been water service tunnel that classified into 1st grade facility by special act for the safety control of public structures and with providing capacity equals to $1,543{\times}10^3$(ton/day) and inner pressure equals to $2.5-3.5kg/cm^2$. In this research, site investigation and stability analysis for water tunnel caused by new construction of road tunnel were carried out. the ground near water tunnel were zoned into spatial area having similar geotechnical characteristics and estimating geotechnical properties for each area. The site for analysis consists of banded biotite gneiss, biotite schist and granite gneiss with spatial non-homogeneity, and for that reason weathering and fault zone were distributed with large scale. It's important thing to consider spatial ground zone and their geotechnical properties properly into stability analysis at design and construction stage. Also, using results of site investigation, stability of existing tunnel have been analyzed for Hydraulic Fracture/Jacking and deformation in detail.