• 제목/요약/키워드: transmission line conductors

검색결과 90건 처리시간 0.023초

소화약제 및 산불에 노출된 가공송전선의 전기적, 기계적 거동 변화 (The Mechanical and Electrical behavior Changes of Overhead Conductor due to Forest Fire and Agents)

  • 장용호;김병걸;김상수;한세원;김진한
    • 전기학회논문지
    • /
    • 제58권2호
    • /
    • pp.242-247
    • /
    • 2009
  • Forest Fire can cause a serious damage to overhead conductors. Therefore, the detailed investigation for the changes of mechanical and electrical properties of damaged conductors should be carried out to understand the effect of forest fires on conductors. This is very much important to maintain transmission line safely. Oxidation of overhead conductor was increased with temperature and time(maximum time : 30min). Conductivity of Al conductor was decreased by Agents. The detailed will be given in the text.

가공송전선로의 소도체 구성방식에 따른 전기적 특성 해석 (An Analysis of Electrical Characteristics for Bundled Conductor Configurations in Overhead Transmission Lines.)

  • 정연호;손홍관;이형권;조연규;신복덕
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 추계학술대회 논문집 학회본부A
    • /
    • pp.245-247
    • /
    • 1998
  • Compacting of Overhead power transmission lines can be helpful in solving many problems, such as reduction of land and forest losses. decrease of the line's environmental impact zones, improvement of its electrical performance. And in overhead transmission lines, regular polygon configuration of bundled conductors are considered and adopted. This papers are compared to subconductor surface charges and electric field gradients, line parameters, natural capacities for regular polygon and modified configurations in 345kV 4 bundle 2 circuits horizontal type transmission lines.

  • PDF

765kV 2회선 송전선의 코로나 방전에 의한 환경영향 연구 (Environmental effects by corona discharge from a 765kV double circuit transmission line)

  • 김정부;이동일;신구용;양광호;안희성;구자윤
    • 대한전기학회논문지
    • /
    • 제45권3호
    • /
    • pp.451-455
    • /
    • 1996
  • This paper specified the measurement results conducted by the Korea Electric Power Research Institute (KEPRI) 765kV double circuit transmission test line that measured the audible noise, hum noise, radio interference, electric field and aeolian measurement. This test line consists of 6-480mm$^{2}$ conductors per phase. The analysis of the test results shows that this 6-Rail conductor bundle satisfies the audible noise criterion under the stable rainy weather condition and the radio interference level under the fair weather. And the other items are also agreed with the design level criterion. (author). 9 refs., 7 figs., 2 tabs.

  • PDF

345KV 송전선의 과도안정도계산 I (A study on transient stability of 345 KV power transmission line)

  • 이재숙
    • 전기의세계
    • /
    • 제18권1호
    • /
    • pp.24-29
    • /
    • 1969
  • This is preliminary study concerning the future construction and operation of 345KV power transmission line in Korea which will be added to the existing 161KV power system by the end of 1970 in order to increase the power carrying capacity between Seoul and Pusan area; 350 kilo meters aparts, in accordance with the ambitious second five years power development schedule of Korea Electric Company. The result of this study says that an intermidiate switching station should be installed at the middle position of the line to improve the transient stability of the system, considerable amount of capacitors or synchronous condenser are to be installed to reduce the voltage drop at receving end of line during the heavy load hours, and also in some measure to avoid the voltage rise by self-excitation of power generators during the light load hours and while energizing the line. This is the first attempt to realize the EHV power transmission line in Korea so that the additional study is necessary on the kind and size of conductors, the necessary number of insulators and the suitable clearance distances between conductor and steel tower or earth from the technical and economical view points. These are necessary steps to be taken by the writer before getting into the calculation on the transient stablity of the power system.

  • PDF

광식각 기술을 이용한 미세라인의 형성 및 Series Resonator의 구현

  • 박성대;조현민;이영신;이우성;박종철
    • 한국마이크로전자및패키징학회:학술대회논문집
    • /
    • 한국마이크로전자및패키징학회 2001년도 The IMAPS-Korea Workshop 2001 Emerging Technology on packaging
    • /
    • pp.151-156
    • /
    • 2001
  • Using the photoimageable thick film conductors, $25\mu\textrm{m}$ line widths and $25\mu\textrm{m}$ spaces can be obtained. Test patterns are made by green tape lamination, paste printing, exposing to UV light, developing in an aqueous process and cofiring. Postfiring method using alumina substrate can be also applied to fine line formation. Series gap resonator formed by photopatterning process showed the improved signal transmission characteristics compared to that obtained by conventional screen printing.

  • PDF

765kV 실규모 실증시험장 건설 (The construction or 765kV test line)

  • 조성배;이동일;김정부
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1991년도 추계학술대회 논문집 학회본부
    • /
    • pp.431-434
    • /
    • 1991
  • To develop the EHV transmission technology, the electrical environment problems such as Audible Noise etc. have been studied by the use of Corona Cage with artifical water spray equipment. However, this study has difficulties in simulating the amount of natural conditions. Therefore, We will plan to install full scale EHV test line to prove the measuring values of Corona Noise, and to selection of Conductors, Insulators, and to economical design, construction data.

  • PDF

Capacity assessment of existing corroded overhead power line structures subjected to synoptic winds

  • Niu, Huawei;Li, Xuan;Zhang, Wei
    • Wind and Structures
    • /
    • 제27권5호
    • /
    • pp.325-336
    • /
    • 2018
  • The physical infrastructure of the power systems, including the high-voltage transmission towers and lines as well as the poles and wires for power distribution at a lower voltage level, is critical for the resilience of the community since the failures or nonfunctioning of these structures could introduce large area power outages under the extreme weather events. In the current engineering practices, single circuit lattice steel towers linked by transmission lines are widely used to form power transmission systems. After years of service and continues interactions with natural and built environment, progressive damages accumulate at various structural details and could gradually change the structural performance. This study is to evaluate the typical existing transmission tower-line system subjected to synoptic winds (atmospheric boundary layer winds). Effects from the possible corrosion penetration on the structural members of the transmission towers and the aerodynamic damping force on the conductors are evaluated. However, corrosion in connections is not included. Meanwhile, corrosion on the structural members is assumed to be evenly distributed. Wind loads are calculated based on the codes used for synoptic winds and the wind tunnel experiments were carried out to obtain the drag coefficients for different panels of the transmission towers as well as for the transmission lines. Sensitivity analysis is carried out based upon the incremental dynamic analysis (IDA) to evaluate the structural capacity of the transmission tower-line system for different corrosion and loading conditions. Meanwhile, extreme value analysis is also performed to further estimate the short-term extreme response of the transmission tower-line system.

송전철탑 Compact화에 따른 전기환경 영향 연구 (A Study on the Environmental Effects of Compact Tower in Transmission Line)

  • 이정원;이원교;이동일
    • 한국전기전자재료학회논문지
    • /
    • 제23권8호
    • /
    • pp.645-650
    • /
    • 2010
  • The continuous increase demand for electric power leads to the additional construction of transmission facilities, but it is not easy to acquire right-of-way for transmission facilities. Therefor, there is a need for compact tower that can be built on a narrow right-of-way the compact tower with polymer insulation arm is a solution. It can be upgrading conventional 154 kV transmission line voltages to 345 kV levels. However transmission voltage is increasing, environment interference (corona noise, radio interference, etc.) will occur gradually. This environment interference is depending on the electrical clearances of tower and configuration of conductors. Therefore the analysis of the factors of environmental interference is necessary in order to upgrading transmission voltage. This paper presents the design factor of a compact tower to meet the environmental interference standard.

765kV 1회선 송전선로 기술기준 및 설계방안 (Technology and Design Standards of 765kV 1cct Transmission Line)

  • 심순보;민병욱;박갑호;조춘익;김재열;신일섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.80-82
    • /
    • 2002
  • To solve the difficulty in obtaining transmission routes and substation sites. increase the transmission capacity between generation sites and load centers. and enhance the stability of the power system. we have constructed and operated the 765kV double circuit transmission line(hereunder T/L) from the Dangjin thermal power plant and the Uljin nuclear power plant to the metropolitan. It makes it possible for us to accumulate know-how of the 765kV system that is the highest operating system level in Asia. As the second 765kV project, we are going to construct the 765kV single circuit T/L between Ansung and Gap yung. Because of the different electrical and mechanical characteristics. we are in need of different design technology. This paper presents the optimal design of 765kV single circuit transmission line after due consideration about the arrangement of conductors. the shape of a tower, insulation, etc.

  • PDF

한전 765 kV 송전선로 전선가선설계에 관한 검토 (A study on the design of conductor stringing for KEPCO 765kV Transmission Lines)

  • 박광희;김용완;원봉주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 C
    • /
    • pp.1330-1331
    • /
    • 1995
  • This paper deals with the design of conductor stringing of KEPCO 765kV transmission line. The main subject in the design of conductor stringing is the determination on what the stringing tension is. According to the stringing tension, the weight and height of towers and the strength necessary for conductor, hardware, insulator vary, and the construction cost and the reliability of tower are affected largely. Therefore, in order to determine the optimum condition for stringing conductors, We appraised various items : estimation of economic comparision, strength appraisal of conductor, hardware, insulator, etc. After studying these entirely, we present the condition of condutor stringing for KEPCO 765kV transmission line.

  • PDF