The urban transit system is operated by driverless and automatic.In driverless and automatic system, the system function is accomplished exactly to obtain the safety and reliability of system and the system is designed to minimize risk. In order to design the system, the functional analysis is performed. Recently functional analysis is performed by design toolwhich is used and verified by aerospace, military, etc. Generally, the design tool is used to perform functional analysis in urban transit system development project. The design toolassist the system engineer to analysis the function of system in basic design. Therefore, In this paper, it is performed the functional analysis to satisfy the system requirement of urban transit system and to confirm the operation of system using design tool.
The urban transit system is operated by driverless and automatic. In driverless and automatic system, the system function is accomplished exactly to obtain the safety and reliability of system and the system is designed to minimize risk. In order to design the system, the functional analysis is performed. Recently functional analysis is performed by design tool which is used and verified by aerospace, military, etc. Generally, the design tool is used to perform functional analysis in urban transit system development project. The design toolassist the system engineer to analysis the function of system in basic design. Therefore, in this paper, it is performed the functional analysis to satisfy the system requirement of urban transit system and to confirm the operation of system using design tool.
The Incoterms and United Nations Convention on Contract for the international Sales of Goods(CISG) allocate a risk in their articles. These rules make a decision that the parties who make a transaction are bound to bear the risk or damages of goods. Though a goods have a damages or loss during a transportation, buyer is liable for the payment of purchase price. In this case, this paper defines the meaning whether who can bear the risk under Incoterms and CISG. In the majority cases which deal between parties, after shipment or at the end of carriage, the loss or damages are found in buyer's hand. If a damages or loss is made during transit, customarily these risk are covered by insurance. Otherwise, these rules provide a tools for solving this problems. Then, between parties should be accomplished their target equitably.
The main objective of study was to analyze the effectiveness of transit mall. To this end, this study compared operational status of transit malls in operation (Daegu, Seoul and Busan). For the city of Busan where the latest transit mall became operational in 2015, a discriminant model was proposed to determine user satisfaction/dissatisfaction. The outcomes of comparative study showed that each city has different operational focus - Seoul has focus on traffic demand management, Busan has focus on walking environment, and Daegu has focus on accessibility to public transportation. Also, the discriminant model indicated that market sentiment, convenience of bus service, traffic accident risk, number of pedestrian, market user number have effects on user satisfaction. These results implied that, to improve user satisfaction, measures for market revitalization such as opening events and forming consultative groups need to be prepared and traffic conditions should also be improved through expansion of curfew time, linkage with subway station.
This article intends to examine main features of revision in relation to the duration of cover in the Institute Cargo Clauses 2009 and the results of analysis are as followings. First, the cover, which had been "warehouse to warehouse", has been extended to what may be called "shelf to unloading". Thus the insurance attaches when the goods are first moved within the warehouse or place of storage at the named place for the purpose of immediate loading for the commencement of transit. Secondly, the new termination Clause 8.1.3 requires an election by the assured, or their employees, to use a vehicle or container, for storage other than in the ordinary course of transit. Thirdly, Clause 10.1, which deals with the assured's voluntary change of voyage, was amended to solve the problem that the words "held covered" could be misunderstood by an assured without specialist knowledge of English marine insurance law to be a guarantee of cover, even where cover would not be commercially available. Finally, Clause 10.2 is designed to solve the so-called "phantom ship problem", arising from the harsh decision in The Prestrioka. The new Clause 10.2 provides protection for an innocent assured in the situation of a phantom ship.
Mombasa is the principle port of Kenya, serving inland countries in Eastern and central Africa. Mombasa port has undergone a massive infrastructure upgrade and dredging works with an expectation that more vessels and large post Panamax ships will be able to enter Mombasa port. Therefore, it is vital to carry out a marine traffic risk assessment in order to quantify the degree of navigation safety needed in the Mombasa approach channel and also to evaluate the navigation risk imposed on transit traffic by local ferry traffic. In this paper, a marine traffic risk assessment is carried out using the IWRAP mk2, Environmental Stress (ES) model, and the PARK model. Risk assessment results show that Likoni area has an unacceptable stress/risk ranking at 20.7% by the ES model and 38.89% by the PARK model. The IWRAP mk2 model shows that the crossing area has the highest risk of crossing collision and the area at the entrance to the inner channel has a high risk of grounding. The conclusions derived from this study will provide the basis for proposing the most effective countermeasure to improve navigation safety in the Mombasa approach channel.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2016.05a
/
pp.81-84
/
2016
Mombasa is the principle port of Kenya, serving hinter countries in Eastern and central Africa. Mombasa port has undergone a massive infrastructure upgrade and dredging works with an expectation that more vessels and large post Panamax ships will be able to call at Mombasa port. Therefore, it is vital to carry out a marine traffic risk assessment so as to quantify the degree of navigation safety on Mombasa approach channel and also to evaluate navigation risk imposed on transit traffic by local ferry traffic. In this paper marine traffic risk assessment is carried out using IWRAP mk2, Environmental Stress model, and PARK model. Risk assessment results show that Likoni area has unacceptable stress/ risk ranking at 20.7% on ES model and 38.89% by PARK model. IWRAP mk2 model shows that crossing area has the highest risk of crossing collision and the area at the entrance to inner channel has a high risk of grounding. The conclusions derived from this study will provide the basis for proposing the most effective countermeasure so as to improve navigation safety in Mombasa approach channel.
Light Rail Transit(LRT) is a large scale complex system which combines rolling stocks, power supply, signal communication, tracks & stations, and hundreds of billions of wons per project are spent for construction. Therefore efficient integration of sub-systems is very important. The systems engineering is a good method to reduce the cost and risk of LRT project. In this paper, we introduce a research plan on the application of systems engineering to LRT project. We, Korea Railroad Research Institute(KRRI), launched a research program with 4 companies, which is support by the governmen and project period is 4.5 years. Main research topic is to develop the technology for the application of systems engineering technical process to LRT project based on ISO/IEC 15288.
This paper focused on the ways of disater prevention and risk analysis of the passengers setting up the hypothesis when urban rapid transit broke out fire in subway tunnel which is PSD(Platform Screen Door) installed environment. compared the flud dynamic changes and evacuation specifications whether PSD being installed or not, tried to search the effective ways for sustaining passengers safety.
Journal of the Korean Society of Marine Environment & Safety
/
v.2
no.S1
/
pp.63-73
/
1996
The assesment of the safety of ship's transit in a curved narrow channl consists of the maneuvering safety determined by the chance of running aground, the maneuvering difficulty determined by shop's workload, and shiphandler's subjective evaluation. In this study to examine the correlation between shiphandler's subjectice evaluation and the maneuvering risk, the real-time and full-mission shiphandling simulator in the Korean Marine Training & Research Institutes(KMTRI) was utilized. In the conning bridge of the shiphandling simulator, 50 experienced masters conducted masters conducted the modeled vessel of 60,000 deadweight tonnage along the designed channel under 3 different envrinmental conditions. The findings were as follows: (1) The frequencies of stress levels, work difficulties, vessel controllability and overall workload of shiphandlers are similar irrespective of environmental conditions and they are able to be represented as shiphandler's subjective evaluation. (2) It is possible to assess and analyze theoretically the correlation between the shiphandler's subjective ecaluation and maneuvering risk each environmental cindition by quantifying the data obtioned from the tests. The results are as follows: ① As the degree of maneuvering risk increases, the shiphandler's subjective evaluation increases sharply near the curvature area of the desgined channel. ② In the area of the curvature of the designed channel, maneuvering risk increases sharply with the danger of running aground under the environmental condition of current and wind comung from the stem.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.