• 제목/요약/키워드: train operation

검색결과 1,265건 처리시간 0.042초

전기철도 운행 중 차량 부하 변화에 따른 고조파 발생에 관한 분석 (The Analysis about Generating Harmonic by Load Variations during Electric Railway Train Operation)

  • 강철;임재찬;허재선;김재철;이수길;한성호;이은규
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.12_13
    • /
    • 2009
  • Recently, TTX(Tilting Train eXpress) has operated test. Electric railways, including the TTX, have electric problems(harmonic etc) that could bring about serious accidents.. Thus, TTX's electrical problems also need leading studies because the new Korean TTX will operate earnestly in 2012. In this paper, electrical signals in TTX operation were detected to analyze electrical harmonic. The electrical harmonics considered operation modes triparted(coasting, acceleration, braking) were analysed and evaluated.

  • PDF

열차 차량기지의 중정비 검수 용량 시뮬레이션 분석 (Simulation Analysis of the Train Overhaul Maintenance Capacity for Rolling Stock Depot)

  • 전병학;이원영;장성용;유재균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1481-1498
    • /
    • 2007
  • As railroad industry face the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high speed long distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for detailed operations of the sample maintenance center are developed. In this study, standard maintenance procedures, layout, equipments and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. Three simulation analysis using the developed simulation model are done. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Lastly, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared.

  • PDF

완전자동무인운전에 대한 신호제어시스템의 안전성 검토 (A Review on the Safety of the Railway Signal System for Fully Automated Manless Operation)

  • 이재봉;정계용;이해철;최시행
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1054-1060
    • /
    • 2010
  • LRT(Light Rail Transit) is currently adopting a more upgraded signal system these days. This latest signal system is a train on-board signal system with moving block based on the realtime bi-directional wireless communications. The system applies RF-CBTC(Radio Frequency - Communication Based Train Control System) in order th execute fully automated manless operation. This paper reviews the performance requirements and safety of RF-CBTC that will be applied to the fully automated manless operation for LRT.

  • PDF

인텔리전트 열차운전을 위한 정보 전송 (An Information Transmission for Intelligent Train Operation)

  • 안상권;최귀만;김양모
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 A
    • /
    • pp.339-341
    • /
    • 1997
  • This study is presenting the method for an effective data transmission in MAGLEV which is now tested and intends to provide for an intelligent operation of signal system in future. To exchange a lot of information, it is ideal to adopt a digital system and a micro-based system is essential for these purposes. FSK modulation and HDLC protocol are adopted on this study and information line assembly which is used as the information exchange, as the speech communication, and as the detection of speed and position is constructed in one unit. Actually this study is produced academic achievements of the data transmission system of MAGLEV train and an advanced method of intelligent operation in future railway system.

  • PDF

철도서비스 평가를 위한 항목 및 지표의 선정방안 (The Development of Performance Measures in Railway Services)

  • 김연규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.222-231
    • /
    • 2003
  • After the reform of rail industry, a system to evaluate service qualities is required for the continuous improvement of railway service and the strength of competitiveness. This research provides evaluation categories and indices which are considered to be suited to the evaluation of rail service qualities. This study provides 4 categories and 11 indices to assess the rail service qualities: provision-operation interval/average operation speed, reliability-regularity/operation cancellation rate, safety- train usage term/facilities for the weak, client satisfaction- easiness of reserving and purchasing of tickets/comfort of queuing facilities/ kindness of train crews/ pleasantness of trains/provision of information, etc.

  • PDF

서울~천안간 전철 개통후 일반철도 수요변화 분석 (New Electrified Rail Impact on Conventional Railroad ; An Empirical Analysis)

  • 김경태;이진선
    • 한국철도학회논문집
    • /
    • 제8권6호
    • /
    • pp.592-596
    • /
    • 2005
  • This study analyzed changes of train operation between Seoul~Cheonan after the introduction of new electrified rail in 2005. As expected number of passengers were reduced at specific service section and several railroad stations which were served by the Mugunghwa. Also, the statistic shows that passenter demand concentrated in a specific time, so train service frequency and level of service need to be modified to meet with changed demand pattern. The purpose of this paper is to identify critical demand pattern, especially, in several section of the railroad system. This studies provide a railroad transportation system that is significantly more efficient, with far greater capacity, by providing solutions to the problems of congestion impact.

유도전동기(誘導電動機)의 병렬운전(竝列運轉) System에서의 벡터제어(制御) (Field Oriented Control in Parallel Operation System of Induction Motors)

  • 김상훈
    • 산업기술연구
    • /
    • 제18권
    • /
    • pp.149-155
    • /
    • 1998
  • This paper describes a reference flux angle selection for a vector control in the parallel operation system that consists of a inverter and several induction motors. In particular, this paper suggests which flux angle of motors prefers for the vector control in the train drive system that diameters of wheels are different. Through simulation for a 210[kW] induction motor drive system, it is clear that the vector control by using of the flux angle of a motor having a minimum wheel diameter leads to a minimum torque difference. However, it requires too many current sensors. So, it is shown that the vector control by a average flux angle of motors is preferable.

  • PDF

전기철도 교/직 절연구분장치의 절연열화 현상 (Insulation Deterioration of AC/DC Section Insulators for Electric Railroad Catenary.)

  • 최규형
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제52권1호
    • /
    • pp.16-22
    • /
    • 2003
  • While passing through the AC/DC section insulators installed at electric railroad catenary, some electric trains undergo mis-operation of main circuit breaker after AC/DC change-over operation. This paper provides insulation resistance measurements of AC/DC section insulators, which confirm the insulation levels of section insulators are below the standard of insulators. The insulation deterioration and pantograph arrangement on the electric train can produce voltage impression on section insulator which induces mis-operation of main circuit breaker To mitigate the insulation deterioration of the section insulator installed at underground railroads, the section insulators have been cleaned periodically, but section insulator structure should be modified to make the section insulator performance perfect. Based on the above analysis, effective modification method of AC/DC section insulator is provided.

미지의 주행저항을 고려한 도시철도차량 ATO의 속도추종 및 정밀정차 제어 (The speed regulation and fixed point parking control of urban railway ATO considering unknown running resistance)

  • 변윤섭;한성호;김길동;백광선;한영재
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.280-287
    • /
    • 1999
  • An automatic train operation(ATO) system executes the operation of constant speed travelling and fixed point parking by using microprocessors instead of drivers manual operation. This paper describes the mathematical model for the train considering unknown disturbances which consist of start resistance, travelling resistance, slope resistance, curve resistance, and so on. The speed controller of ATO system is designed by considering the disturbances. The simulation is executed to verify the speed control and fixed point parking performance and to compare its performance with that of a PID-type ATO control system under disturbances. Simulation results show that the control performance of gain scheduled control scheme fur ATO system is better than that of the conventional PID controller.

  • PDF

승강장 혼잡관리를 위한 열차의 정차시간 예측모형 (Development of the Train Dwell Time Model : Metering Strategy to Control Passenger Flows in the Congested Platform)

  • 김현;이선하;임국현
    • 한국ITS학회 논문지
    • /
    • 제16권3호
    • /
    • pp.15-27
    • /
    • 2017
  • 열차 정차시간 증가는 열차 서비스 빈도를 감소시켜 열차와 승강장의 혼잡이 발생하게 된다. 그러므로 열차 정차시간(Train dwell time)에 관한 연구는 열차 운행 계획수립 관점에서 매우 중요하게 다루어 왔다. 본 논문은 계획된 정차시간을 준수할 수 있도록 승객의 유입을 관리하여 승강장 혼잡을 줄일 수 있는 전략들에 활용할 수 있는 실시간 열차 정차시간 예측모형을 개발하였다. 모형의 특징은 실시간으로 수집 가능한 승차인원, 하차인원, 그리고 열차의 중량 등 3가지 독립변수를 적용하였고, 모형의 설명력(${\bar{R^2}}=0.809$)이 대체적으로 정확한 결과를 보여주었다. 실시간 정차시간 모형은 열차가 계획된 정차시간을 준수하도록 승차 승객 수를 조정하는 게이트 미터링 전략에 활용될 수 있다.