• Title/Summary/Keyword: train operation

Search Result 1,265, Processing Time 0.029 seconds

The Influence of Coupling Coefficient between Wayside Transmitter and On-board Receiver upon Operation Characteristics of the ATS System

  • Kim, Min-Seok;Kim, Min-Kyu;Lee, Sang-Hyeok;Lee, Jong-Woo
    • International Journal of Railway
    • /
    • v.4 no.1
    • /
    • pp.12-18
    • /
    • 2011
  • The ATS system is used to provide wayside signaling. Currently, the oscillation frequency is set at 78[kHz] in the normal state. As the on-board receiver crosses over the wayside transmitter, the oscillation frequency is changed by capacitors of the wayside transmitter in a manner dependent on the train speed. As the oscillation frequency is changed, the waveform is modified in the wayside transmitter as well as in the on-board receiver. When there are other signal systems such as a ATO system present near the wayside transmitter, frequency interference occurs. This phenomenon arises since other signals or communication frequencies present will be included in the waveform. Trains often stop due to these other frequencies included in the waveform. In this paper, a model of the interaction between the wayside transmitter and on-board receiver is suggested and frequency response in the wayside transmitter and on-board receiver in the presence of the other signals are estimated by the coupling coefficient. Also, the coupling coefficients are estimated, and the optimal value is proposed.

Development of Integrated Monitoring Middleware System for 400km/h High Speed Railway Measurement Data (400km/h급 고속철도 계측데이터 통합 모니터링 미들웨어 시스템 개발)

  • Hwang, KyungHun;Na, JunSu;Song, ByungKeun;Yang, OKYul
    • Convergence Security Journal
    • /
    • v.13 no.6
    • /
    • pp.61-68
    • /
    • 2013
  • Needs for a new technologies of infrastructure systems arose, following the development of next generation EMU(Electric Multiple Unit) train with maximum speed over 400km/h. For high-speed operation tests of the new EMU, a high-speed railway infrastructure test-bed was constructed in a 28km long section of the Honam High-speed Railway. Diverse sensors and monitoring system was installed for continuous monitoring of the railway. Due to such effort, further demands and needs of the integrated monitoring system was derived in a more comprehensive and long-term perspective.

Mathematical Models of a Transformer Cooling System for the Control Algorithm Development (제어알고리즘 개발을 위한 변압기 냉각시스템의 수학적모델)

  • Han, Do-Young;Noh, Hee-Jeon
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.2
    • /
    • pp.70-77
    • /
    • 2010
  • In order to improve the efficiency of a main transformer in a train, the optimal operation of a cooling system is necessary. For the development of optimal control algorithms of a cooling system, mathematical models of a main transformer cooling system were developed. These include static and dynamic models of a main transformer, an oil pump, an oil cooler, and a blower. Static models were used to find optimal oil temperatures of the inlet and the outlet of a transformer. Dynamic models were used to predict transient performances of control algorithms of a blower and an oil pump. Simulation results showed good predictions of the static and the dynamic behavior of a main transformer cooling system. Therefore, mathematical models developed in this study may be effectively used for the development of control algorithms of a main transformer cooling system.

Beacon Color Code Scheduling for the Localization of Multiple Robots (다 개체 로봇의 위치인식을 위한 비컨 컬러 코드 스케줄링)

  • Park, Jae-Hyun;Lee, Jang-Myung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.16 no.5
    • /
    • pp.433-439
    • /
    • 2010
  • This paper proposes a beacon color code scheduling algorithm for the localization of multiple robots in a multi-block workspace. With the developments of intelligent robotics and ubiquitous technology, service robots are applicable for the wide area such as airports and train stations where multiple indoor GPS systems are required for the localization of the mobile robots. Indoor localization schemes using ultrasonic sensors have been widely studied due to its cheap price and high accuracy. However, ultrasonic sensors have some shortages of short transmission range and interferences with other ultrasonic signals. In order to use multiple robots in wide workspace concurrently, it is necessary to resolve the interference problem among the multiple robots in the localization process. This paper proposes an indoor localization system for concurrent multiple robots localization in a wide service area which is divided into multi-block for the reliable sensor operation. The beacon color code scheduling algorithm is developed to avoid the signal interferences and to achieve efficient localization with high accuracy and short sampling time. The performance of the proposed localization system is verified through the simulations and the real experiments.

A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS) (수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구)

  • Son, Yeong-Jin;Park, Keun-Soo;Min, Kyung-Yun
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.755-770
    • /
    • 2006
  • 1974. 8.15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basic design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

  • PDF

A Study on the Crushing Characteristic of the Ballast Gravel at High-Speed Railroad (고속선 도상자갈의 파쇄특성에 관한 연구)

  • Lee, Choon-Kil;Kim, Nam-Hong;Woo, Byoung-Koo;Lee, Sung-Uk
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.4
    • /
    • pp.384-389
    • /
    • 2008
  • The ballast, one of track components, plays an essential role as intermedium in transmitting train load to subgrade safely, and the deterioration of ballast directly effects the growth of track irregularity. In this study, we determined the main factor of ballast deterioration was miniature of ballast gravel caused MTT (Multiple Tie Tamper) works and accumulated traffic loads. To estimate the deterioration characteristics of ballast, we carried out field test (Chap.2) through track construction for test and the model test (Chap.3) simulating the actual operation environment, have done a comparative analysis with the sample's result (crushing rate) of high-speed railroad running actually.

A Study on ATO Control Pattern for Improving the Passenger's Comfort (승차감 향상을 위한 자동열차운전시의 제어패턴에 관한 연구)

  • 신한순;원충연
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.2
    • /
    • pp.49-56
    • /
    • 2001
  • This paper describes the improvement of passenger's comfort by analyzing the debasement of early adapted ATO control pattern. First we give the characteristics of ATO controller, principle of running control, distance & velocity calculation methods used mainly in INCHEON subway UNE 1 and then analyze the ATO control pattern. For early control pattern, we reviewed it in view of passenger's comfort while keeping the track conditions. In order to achieve the improvement of passenger's comfort we propose the modification of early ATO control pattern based on JERX characteristics. Simulation and application test are performed to prove the effectiveness of modified ATO control pattern.

  • PDF

A Study on the Behavior of Skid Gear During the Helicopter Autorotation (헬리콥터 오토로테이션시 착륙장치 거동에 관한 연구)

  • Choi, Hyung-Tai;Oh, Jung-Jin;Kim, Geun-Won;Shin, Ki-Su
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.15 no.6
    • /
    • pp.746-753
    • /
    • 2012
  • ROK military helicopters are frequently exposed to the hazard situations due to the characteristic of operation. Especially, helicopter accident may lead to critical damage of human and structure. Accordingly, pilots have to train the autorotation procedures and learn the skill to prevent hard landing. In this paper, the behavior of skid gear subject to the helicopter autorotation was conducted by using numerical method. The computer simulation approach by using finite element method was employed to accomplish this goal. Additionally, the behavior of skid gear was evaluated for the different landing conditions. In conclusion, the maximum stress concentration was occurred at the attached area of skid cross-tube to the fuselage. Also, it was revealed that the most proper attitude was level landing to prevent hard landing.

User-centric Scalability Measurement System of Large-Scale Measurement Data for 400km/h High-Speed Railway (400km/h 고속철도 대규모 계측데이터 사용자 중심 확장성 계측시스템)

  • Hwang, Kyung-Hun;Park, Sun-Kyu;Song, Byung-Keun;Yang, OK-Yul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1157-1163
    • /
    • 2014
  • Needs for a new technologies of infrastructure systems arose, following the development of next generation EMU(Electric Multiple Unit) train with maximum speed over 400km/h. For high-speed operation tests of the new EMU, a high-speed railway infrastructure test-bed was constructed in a 28km long section of the Honam High-speed Railway. Diverse sensors and monitoring system was installed for continuous monitoring of the railway. Due to such effort, further demands and needs of the integrated monitoring system was derived in a more comprehensive and long-term perspective.

A New Approach for Hierarchical Dividing to Passenger Nodes in Passenger Dedicated Line

  • Zhao, Chanchan;Liu, Feng;Hai, Xiaowei
    • Journal of Information Processing Systems
    • /
    • v.14 no.3
    • /
    • pp.694-708
    • /
    • 2018
  • China possesses a passenger dedicated line system of large scale, passenger flow intensity with uneven distribution, and passenger nodes with complicated relations. Consequently, the significance of passenger nodes shall be considered and the dissimilarity of passenger nodes shall be analyzed in compiling passenger train operation and conducting transportation allocation. For this purpose, the passenger nodes need to be hierarchically divided. Targeting at problems such as hierarchical dividing process vulnerable to subjective factors and local optimum in the current research, we propose a clustering approach based on self-organizing map (SOM) and k-means, and then, harnessing the new approach, hierarchical dividing of passenger dedicated line passenger nodes is effectuated. Specifically, objective passenger nodes parameters are selected and SOM is used to give a preliminary passenger nodes clustering firstly; secondly, Davies-Bouldin index is used to determine the number of clusters of the passenger nodes; and thirdly, k-means is used to conduct accurate clustering, thus getting the hierarchical dividing of passenger nodes. Through example analysis, the feasibility and rationality of the algorithm was proved.