• Title/Summary/Keyword: train model

Search Result 1,719, Processing Time 0.028 seconds

A study on dynamic simulation for estimation of leakage current (누설전류 예측을 위한 동적 시뮬레이션에 관한 연구)

  • Jung, Ho-Sung;Han, Moon-Seob;Park, Young;Chung, Sang-Gi;Kwon, Sam-Young;Lee, Jea-Bong
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.250-252
    • /
    • 2008
  • DC traction system generates leakage current because running rails are used in return circuit. And it is very important to estimate the leakage current to the train operation situation. Therefore this paper presents dynamic simulation technique that is very similar to the real operation situation using TPS and PSCAD/EMTDC. For this we model DC traction system included in DC substation, variable feeding circuit model and variable train model. And we extract train location and power using TPS program and use these data for dynamic simulation. Finally we can estimate leakage current to the various operation condition using dynamic simulation.

  • PDF

Verified 20-car Model of High-speed Train for Dynamic Response Analysis of Railway Bridges (검증된 고속철도 차량의 20량편성 정밀모형에 의한 철도교량의 동적응답 분석)

  • 김상효;김병석;허진영;최성락
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.10a
    • /
    • pp.485-492
    • /
    • 2001
  • The dynamic analysis model is developed with the high-speed train (KTX) and a 2-span continuous prestressed concrete box girder bridge with a double track. The analytical results are compared with the dynamic field test results and found to be valid to yield quite accurate dynamic responses. The various trainset models with different number of cars are developed and compared with the results of the regular 20-car trainset model. It is concluded that the reduced trainset models, such as 7-car and 10-car models, cannot exactly produce the dynamic responses of bridges, especially when the train speed is high. Under the coincidence condition of two trains traveling with resonance velocity in the opposite directions, it is found that the impact factor under two-way coincidence is three times larger than that under one-way traffic. Consequently, for the bridge with a double-track it is necessary to check not only the dynamic responses of the bridge with one-way traffic but those with two-way coincidence.

  • PDF

Simulations for an ASCU of a Train Brake including a Pneumatic Model (공압모델이 포함된 철도차량 제동 ASCU 시뮬레이션)

  • Kim, Ho-Yeon;Kang, Chul-Goo
    • 유공압시스템학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.93-97
    • /
    • 2010
  • Wheel skids may occur during train operations due to low adhesion at the wheel-rail contact point abnormally, and the skids, in turn, result in flats appearing on the wheels, which affect safety and ride comfort significantly. Thus, anti-skid control has a crucial role for safe braking and prevention from flats that could cause a disastrous train accident. This paper presents simulation studies on an anti-skid control unit (ASCU) with a brake system of a rolling stock including a pneumatic model for brake power supply and dump valve operation.

  • PDF

A Study on the Dynamic Load Model of Truss Bridge subjected to Moving Train Loads (열차하중을 받는 트러스교의 동적하중모형 연구)

  • 안주옥;박상준
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1996.04a
    • /
    • pp.111-118
    • /
    • 1996
  • Dynamic load models which show the practical behavior of truss bridge subjected to moving train load are presented. Three basically approaches are available for evaluating structural response to dynamic effects : moving force, moving mass, and influence moving force and mass. Simple warren truss bridge model is selected in this research, and idealized lumped mass system, modelled as a planar structure. In the process of dynamic analysis, the uncoupled equation of motion is derived from simultaneous equation of the motion of truss bridge and moving train load. The solution of the uncoupled equations of motion is solved by Newmark-$\beta$ method. The results show that dynamic response of moving mass and static analysis considering the impact factor specified in the present railway bridge code was nearly the same. Generally, the dynamic response of moving force is somewhat greater than that of moving mass. The dynamic load models which are presented by this study are obtained relatively adequate load model when apply to a truss bridge.

  • PDF

Noise reduction of noise barrier with noise reducer for high speed train by using scale down model test (축척모형 실험에 의한 고속전철 방음벽용 소음저감 장치)

  • 정성수;전병수;나희승;김준엽;양신추
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.11b
    • /
    • pp.647-652
    • /
    • 2001
  • A noise reduction of noise barrier for high speed train was measured by using scale down model test. A selected types of noise barriers were simple vertical barrier, interference type barrier with plate, interference type barrier with cylindrical pipes. On experiment, in order to make similar present test lane condition, reduced train model and multiple noise sources were considered. As a result. interference type noise barrier with cylindrical pipes is most effective than other barriers. A present height of noise barrier which is established in a test lane is not high enough for reducing patograph noise.

  • PDF

Reliability Allocation Model for KTX-II High Speed Train (KTX-II 고속 차량을 위한 신뢰도 할당 모델)

  • Lee, Kang-Won;Chung, In-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.319-326
    • /
    • 2007
  • During the design phase of a system, which requires high reliability and safety such as aircraft, high speed train and nuclear power plant, reliability engineer must set up the target system reliability. To meet a reliability goal for the system, reliability allocation should be done gradually from the system to its element. For this end, first of all, we need to construct functional block diagram based on the design output and PWBS(Project Work Breakdown System). Another important input data for reliability allocation is the relationship between the cost and the reliability. In this study we investigate various reliability allocation models, which can be applicable to aircraft, vehicle, and power plant, and etc. And we suggest a proper reliability allocation model which can be effectively applicable to KTX-II high speed train to achieve the target system reliability.

Torsional Stress Prediction of Turbine Rotor Train Using Stress Model (스트레스 모델을 이용한 터빈 축계의 비틀림 응력 예측)

  • Lee, Hyuk-Soon;Yoo, Seong-Yeon
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.9
    • /
    • pp.850-856
    • /
    • 2013
  • Torsional interaction between electrical network phenomena and turbine-generator shaft cause torsional stress on turbine-generator shaft and torsional fatigue fracture on vulnerable component, but the prediction of the torsional stress is difficult because the torsional stress is occurred instantly and randomly. Therefore continuous monitoring of the torsional stress on turbine-generator shaft is necessary to predict the torsional fatigue, but installing the sensors on the surface of the shaft directly to monitor the stress is impossible practically. In this study torsional vibration was measured using magnetic sensor at a point of turbine-generator rotor kit, the torsional stress of whole train of rotor kit was calculated using rotor kit's stress model and the calculated results were verified in comparison with the measured results using strain gauge at several point of turbine-generator rotor kit. It is expected that these experiment results will be used effectively to calculate the torsional stress of whole train of turbine-generator rotor in power plants.

A Study on the Prediction of Train Noise Propagation Using the Spark Discharge Sound Source (스파크 음원을 이용한 철도소음전파 예측에 관한 연구)

  • Joo Jin-Soo;Kim Jae-Chul
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.485-490
    • /
    • 2005
  • With the historical opening of the express rail, Korea has joined the league of France, Japan, Germany and Spain and entered into the super high-speed train era. Opening of the express rail will not only bring about enormous changes to the lives of Koreans, but it will also have a huge influence on the economic, social and cultural aspects of the country. With construction of the Seoul - Busan KTX line, railway passenger transportation capacity and freight transportation capacity will increase. Fast, safe, convenient and environmentally friendly, the express rail is a product of the latest technology and will secure its position as the newest and most preferred method of transportation for the next generation. As the traffic noise, train noise from KTX will become a social problems with the acceleration of speed and increase in the lines. In order to predict the train noise propagation from KTX, this paper presents the sound source system, the calculation model and the scale model experiment. Noise level unit patterns of a KTX that take the rolling noise, the motor noise and aerodynamic noise into consideration are simulated by the scale model experiment and numerical analysis.

  • PDF

Development and Shaking Table Tests of a Base Isolator for Controling Subway Train-Induced Vibration of a Steel Building (지하철 진동에 대한 철골건물 기초진동 절연장치의 개발 및 진동대 실험)

  • Kim, Jin-Koo;Song, Young-Hoon;Kwun, Hyong-Oh;Huh, Young
    • Journal of KSNVE
    • /
    • v.7 no.5
    • /
    • pp.789-796
    • /
    • 1997
  • In this study a conventional rubber mount and a new form of base isolator made of steel spring coated with natural and articial rubber were manufactured and tested on a shaking table to investigate the capacity of reducing the vertical vibration of a building induced by subway train. The model structure used in the test is a 1/4 scaled steel structure, and a white noise input and train vibration records were used to check the effectiveness of the isolators. According to the results all three types of isolators turned out to perform effectively in reducing the acceleration and the natural rubber-coated one is ranked best among the isolators. However the vertical displacement of the model is increased due to the instolation of the bearings, and the safty against the lateral load induced by earthquake ground motion should be provided to be able to apply the system to the real buildings.

  • PDF

Dynamic response characteristics of crossing tunnels under heavy-haul train loads

  • Dong, Jie;Zhong, Shuai;Wang, Hai-long;Wu, Zhi-hui
    • Geomechanics and Engineering
    • /
    • v.20 no.2
    • /
    • pp.103-112
    • /
    • 2020
  • The dynamic response of crossing tunnels under heavy-haul train loads is still not fully understood. In this study, based on the case of a high-speed tunnel underneath an existing heavy-haul railway tunnel, a model experiment was performed to research the dynamic response characteristics of crossing tunnels. It is found that the under-crossing changes the dynamic response of the existing tunnel and surrounding rock. The acceleration response of the existing tunnel enhances, and the dynamic stress of rock mass between crossing tunnels decreases after the excavation. Both tunneling and the excitation of heavy-haul train loads stretch the tunnel base, and the maximum tensile strain is 18.35 µε in this model test. Then, the measured results were validated by numerical simulation. Also, a parametric study was performed to discuss the influence of the relative position between crossing tunnels and the advanced support on the dynamic behavior of the existing tunnel, where an amplifying coefficient of tunnel vibration was introduced to describe the change in acceleration due to tunneling. These results reveal the dynamic amplifying phenomenon of the existing tunnel during the new tunnel construction, which can be referred in the dynamic design of crossing tunnels.