• Title/Summary/Keyword: track circuit current

Search Result 62, Processing Time 0.027 seconds

A Internal Signal Modeling for a Defect Diagnosis of Track Circuit on HSL (고속선 궤도회로 결함진단을 위한 내부 모델링)

  • Park, Ki-Bum;Lee, Tae-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.779-785
    • /
    • 2006
  • This paper introduces a result of internal signal modeling for a defect diagnosis of the UM-71C track circuit using on HSL. Actually, We fixed a sample area within operating section on HSL and performed the simulations for short circuit current that is reflected characteristic impedance and propagation factor. We compared the measuring data with the result of the simulation. These modeling can be used as the basic data for secure of the safety. Also, It need to make a criteria of analysis for the maintenance through comparison simulation data and inspection data.

  • PDF

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Kwon, Jae-Wook;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1169-1177
    • /
    • 2008
  • The system of the railway signaling using the track transmits the approved speed to the location of a train and it. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

  • PDF

Estimation and Measurement of the Traction return current on the electrified Gyeongbu line.

  • Kim, Y.K.;Yang, D.C.;Han, M.S.;Ryu, C.K.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.99.5-99
    • /
    • 2001
  • This study presents a simulation of the traction return current based on $2{\times}25kV$ power supply system in order to determine the impedance bond intensity of impulse type track circuit on the electrified Gyeongbu line. The results of the simulation enables us to measure the precise intensity of catenary current that returns to the substation through KTX (Korean Train Express) operated by $2{\times}25kV$ power supply system with common earth network. The combination of $2{\times}25kV$ and common earth network established on the electrified Gyeongbu line for the first time in Korea. We show that the relationships among the traction return current, earth current, and catenary current, and catenary current can be applied to this line in order to determine the optimal impedance bond intensity ...

  • PDF

Analysis of EMI Between Overlapped Railway Signalling Systems and Its Countermeasure (철도신호시스템 중첩운영으로 인한 전자파장해현상 분석 및 대책)

  • Kho, Young-Hwan;Yoon, Sun-Ho;Choi, Kyu-Hyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.6
    • /
    • pp.1116-1122
    • /
    • 2009
  • ATS(Automatic Train Stop) system makes train stop when it runs over the speed limit and ensure the safe operation of train. Seoul Metro line 2 in Korea, which started its passenger service in 1982, has adopted ATS system for its signaling system. The ATS system has only a train stop function at the time of emergency, and Seoul Metro is planning to replaced them with ATC(Automatic Train Control)/ATO(Automatic Train Operation) system which can provide the dedicated speed control for headway reduction and automatic operation of train. Until all the ATS system is replaced with the new ATC system, both systems are to operate simultaneously at the same metro line. In this situation, ATS system sometimes reveals improper operation: train stops suddenly without any obstacles in front of it. These emergency stops cause interruption of passenger service, and abnormal abrasion of wheels and rail. This paper makes it clear that these interruptions are caused by EMI phenomena between ATS on-board device and ATC wayside device : Signal current flowing in AF track circuit of ATC is turn out to be a EMI source that prevent normal operation of the ATS on-board device. Although the two systems have different frequency-ranges (ATS system has frequency range between $78{\sim}130$[kHz] and ATC system has frequency range between $9.5{\sim}16.5$[kHz]), it turned out that EMI phenomena appears between the both systems. This is investigated by measuring the output signal from ATS on-board device passing over ATC wayside device. The FFT(Fast Fourier Transform) analysis of the signal reveals that AF track circuit signal is transmitted to the ATS on-board device and induce noise causing improper operation. The countermeasures to the EMI phenomena are examined in three ways; blocking EMI transmission, enforcement of EMS (Electromagnetic Susceptibility) of ATS on-board device, and blocking the EMI source. It is suggested that the practical solution be blocking EMI source temporarily, that is breaking AF track circuit signal when the trains with ATS on-board device pass over it. To this purpose, TODS(Train Occupation Detection System) is developed, and has made a success in preventing the EMI problem of Seoul Metro line 2.

A Mathematical Model For The Track Circuit Of The Korea High Speed Line (한국 고속 전철 궤도회로의 수학적 모델링)

  • Um Jung-Kyou;Lee Wang-Hee;Cho Yong-Gi;Yoo Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1233-1239
    • /
    • 2004
  • This study analysis the current level of the Korea High Speed Line by mathematical model of the rail and compensation capacitors. The rail and compensation capacitors are represented by transmission parameters and the analysis is processed by computer simulation.

  • PDF

Fabrication and Characteristics of 30〔kVA〕 Superconducting Generator (30(kVA) 초전도발전기 제작 및 특성)

  • ;;;;;;;I. Muta;I. Hoshino
    • Progress in Superconductivity and Cryogenics
    • /
    • v.3 no.2
    • /
    • pp.32-38
    • /
    • 2001
  • A 30[kVA] superconducting generator (SCG) is built and tested at Korea Electrotechnology Research Institute (KERI) in Korea. This superconducting generator has an air-gap winding instead of the typical steel teeth structure. The rotor has 4 field coils of race-track type with NbTi superconducting wired. The rotor is composed of two dampers and a liquid helium composed of two dampers and a liquid helium container in which the field poles reside. The space between the outermost damper and the container is vacuum insulated. A ferrofluid seal is used between the stationary part connected to the couping and the rotor. A helium transfer coupling(HTC) has 3 passages of the recovered heilum gas and a gas flow control system. The open circuit test and sustained short circuit test are preformed to obtain the open circuit characteristics (OCC) and short circuit characteristics (SCC) Also. the test results usder the light load (up to 3.6[kW]) are given. The structure, manufacturing and basis test of the 30[kVA]SCG are discussed.

  • PDF

Applying New Algorithm on AC Auto-Transformer Feeding System under Multiple Trains Operating (AT 교류 철도급전계통 내 다수 열차 운행시 새로운 계통해석 알고리즘 연구)

  • 전용주;추동욱;전명수;임성정;김재철
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.712-719
    • /
    • 2000
  • This paper presents a new algorithm to analyze a train voltages of multi-trains in auto-transformer-fed AC railway systems, using electrical equivalent change. The train current will be divided into circulation and return currents, and these current values are the same. By evaluating each current independently, the result will be more precise. The train current flows through the all auto-transformer corresponding to track impedance. In analyzing the railway system, the algorithm is based on the K.C.L, K.V.L, superposition and circuit separation method. Multi-train's voltages are determined by calculating the catenary voltage at each train's position and adding up these train's voltage drop. Case studies use a field operational data, show that tile proposed method is easily applied.

  • PDF

The comparison and investigation of harmonic magnification according to power supply schemes in high speed railway (고속철도의 급전계통 구성에 따른 고조파 확대율 비교 검토)

  • Lee, Chang-Mu;Oh, Kwang-Hae;Chang, Sang-Hun
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1402-1404
    • /
    • 2000
  • The electrified railway has various power supply schemes. Although the identical trains are operated in same condition and the impedance of track are equal, the genealogy impedance of track is changed according to composition method of feeding scheme. So, the harmonic current flowing into the railway substation are greatly unlike. For simulation of harmonic magnification flowing into the railway substation according to feeding scheme, we propose 6-port network analysis method based on 4-port network, find 6-port equivalent model of each circuit component, and compare and investigate harmonic magnification in the case of parallel post and normal feeding scheme.

  • PDF

A Study of Detecting Broken Rail using the Real-time Monitoring System (실시간 모니터링을 통한 레일절손 검지에 관한 연구)

  • Kim, Tae Geon;Eom, Beom Gyu;Lee, Hi Sung
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.4
    • /
    • pp.1-7
    • /
    • 2013
  • Train accidents can be directly connected to fatal accidents-collision, derailment, Fire, railway crossing accidents-resulting in tremendous human casualties. First of all, the railway derailment is not only related to most of railway accidents but also it can lead to much more catastrophic accompanying train overtured than other factors. Therefore, it is most important factor to ensure railway safety. some foreign countries have applied to the detector machines(e.g., ultrasonic detector car, sleep mode, current detector, optical sensing, optical fiber). Since it was developed in order to prevent train from being derailed. In korea, the existing track method has been used to monitor rail condition using track circuit. However, we found out it impossible for Communication Based Train Control system(CBTC), recent technology to detect rail condition using balise(data transmission devices) without no track circuit. For this reason, it is needed instantly to develop real-time monitoring system used to detect broken rails. Firstly, this paper presents domestic and international statues analysis of rail breaks technology. Secondly, the composition and the characteristics of the real-time monitoring system. Finally, the evidence that this system could assumed the location and type of broken rails was proved by the experiment of prototype and operation line tests. We concluded that this system can detect rail break section in which error span exist within${\pm}1m$.

A Maximum Power Point Tracking Control for Photovoltaic Array without Voltage Sensor

  • Senjyu Tomonobu;Shirasawa Tomiyuki;Uezato Katsumi
    • Proceedings of the KIPE Conference
    • /
    • 2001.10a
    • /
    • pp.617-621
    • /
    • 2001
  • This paper presents a maximum power point tracking algorithm for Photovoltaic array using only instantaneous output current information. The conventional Hill climbing method of peak power tracking has a disadvantage of oscillations about the maximum power point. To overcome this problem, we have developed a algorithm, that will estimate the duty ratio corresponding to maximum power operation of solar cell. The estimation of the optimal duty ratio involves, finding the duty ratio at which integral value of output current is maximum. For the estimation, we have used the well know Lagrange's interpolation method. This method can track maximum power point quickly even for changing solar insolations and avoids oscillations after reaching the maximum power point.

  • PDF