• Title/Summary/Keyword: towing winch

Search Result 14, Processing Time 0.021 seconds

An Experimental Study on Development of the Opening Apparatus for Oil Boom (오일펜스 전개장치 개발에 관한 실험적 연구)

  • Jang Duck-Jong;Na Sun-Chol
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.9 no.1
    • /
    • pp.45-54
    • /
    • 2006
  • The study was to review methods by which a ship can unfold and tow an oil boom by attaching the opening apparatus to an oil boom through experiments. The shape and dimension of the opening apparatus were designed with the measurement value of the towing tension load of the oil boom and the dimension of winch drum of the oil boom installed in the ship considered. For the field experiment to identify the performance of the opening apparatus, opening apparatuses were prepared to have the dimension of $3.0m^2$ and $6.0m^2$ which is 91% and 75% of the calculation value for type B and C respectively. As a result, T(kg), the value of tension in type B oil boom according to the towing speed(v) change when two ships are towed together were proved to be $T=920v^{1.1}\;and\;T=500v^{0.9}$ in case the distance is 100 m and 50 m. Based on the result, the dimension of the opening apparatus for type B and C oil boom was calculated as $3.3m^2$ and $8.0m^2$ respectively. When unfolding and towing by attaching the opening apparatus and 200 m of towing line at both ends of type B and type C oil boom, the maximum width of the opening apparatus was shown as 114 m and 95 m in average(width of opening/total length of oil boom: 33% and 57%) in the towing speed of 1.5 kt. It was evaluated that the opening apparatus could concentrate the spilled oil in a good performance. However as far as the increase rate of oil boom opening width according to the length of the towing line is debatable, the increase rate is remarkably reduced when it is lengthened from 100 m to 150 m and to 200 m although it showed extreme increase of 31% and 40% when the length of the towing line was changed from 50 m to 100 m. Therefore, it is inferred that the towing line should be maintained more or less 100 m to get good spread efficiency of the opening apparatus. Additionally, if the towing speed is faster than 1.5 kt, the opening width was narrowed because of the reduced spread efficiency and the shape of the oil boom can be unstable because of the partial sinking of the oil boom, run over waves, or flap of skirt. Thus the reasonable towing speed can be within 1.5 kt for the operation of the opening apparatus.

  • PDF

The Basic Study on Improvement Bridge Layout by Link Analysis in Korean Coastal Large Trawler (링크분석에 의한 우리나라 근해대형트롤선의 선교 레이아웃 개선에 관한 기초연구)

  • Kim, Min-Son;Shin, Hyeon Ok
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.3
    • /
    • pp.724-732
    • /
    • 2013
  • The purpose of this study is to obtain a basic data on layout of the trawlers' bridge equipment. The task activities of bridge workers involved in the navigation and fishing operation were analyzed by link analysis methods. The results are as follows. It was found that the movement pattern and frequency of bridge workers are different accordance with the bridge work (navigation, casting net, towing net and hauling net). The central workstation of movement of the bridge workers was a radar workstation, a steering workstation and a trawl winch workstation in the bridge work. But the radar did not show up as the center of movement during the hauling net. Workstations related deeply to the central workstations of the movement on the bridge were as below. Radar workstation was related to a GPS plotter, a microphone location for external communication with VHF and MF/HF equipment and a steering in the case of the navigation, the steering, the GPS plotter and the net monitor in the case of the fishing operation. Steering workstation was related deeply to the GPS plotter, the radar in the case of the navigation, a speed controller, the GPS plotter, a fish finder, the net monitor and the microphone location in the case of the fishing operation. Trawl winch workstation showed deep relation with the GPS plotter and the speed control during the fishing operation. Through this study, it was found that Workstations related deeply to the central workstation of the movement of the bridge workers in accordance with the bridge work. The results of this study might be utilized as the basic data on the bridge layout to minimize the fatigue degree due to a physical movement of the bridge workers.

Structural Integrity Evaluation for Crane Bracket of Armored Recovery Vehicle (구난장갑차 크레인 브래킷에 대한 구조건전성 평가)

  • Jung, Jae-Woong;Jung, Un-Hwa;Kim, Cheon-Soo;Yu, Young-Soo;Park, Kyung-Chul;Park, Ki-Chul
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.16 no.5
    • /
    • pp.653-658
    • /
    • 2013
  • For towing the new type armored vehicle and maintaining the close support, the armored recovery vehicle(ARV) with winch and crane has been developed. In case of crane, it is mainly used to salvage heavy objects by rotational and vertical motion. Especially, the crane bracket is very important parts due to fixing the ARV's body and rotary joint and preventing the force rotation of crane. Therefore, the crane bracket needs to have an enough strength to endure the high load and it is very important to analyze the stress distribution under loads. In the present work, the experimental and analytical investigation on structural integrity evaluation of crane bracket were carried out. The simulation of three-dimensional finite element method(FEM) was compared with experimental datum. From the numerical results, the FEM simulations corresponded well with th experimental results and the structural safety was confirmed by safety factor.

development of a Depth Control System for Model Midwater Trawl Gear Using Fuzzy Logic (퍼지 논리를 이용한 모형 증층트롤 어구의 수심제어시스템 개발)

  • 이춘우
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.36 no.1
    • /
    • pp.54-59
    • /
    • 2000
  • This paper presents a control system that uses a fuzzy algorithm in controlling the depth of a model midwater trawl net, and experimental results carried out in the circulating water channel by using a model trawl winch system.The fuzzy controller calculates the length of the warp to be changed, based on the depth error between the desired depth and actual depth of the model trawl net and the ratio of change in the depth error. The error and the error change are calculated every sampling time. Then the control input, i.e. desirable length of the warp, is determined by inference from the linguistic control rules which an experienced captain or navigator uses in controlling the depth of the trawl winch controller and the length of the warp is changed. Two kinds of fuzzy control rules were tested, one was obtained from the actual operations used by a skilled skipper or navigator, and the other was a modified from the former by considering the hydrodynamic characteristics of the model trawl system.Two kinds of fuzzy control were tested, one was obtained fro the actual operations used by a skilled skipper or navigator, and the other was a modified from the former by considering the hydrodynamic characteristics of the model trawl system.The results of these model experiments indicate that the proposed fuzzy controllers rapidly follow the desired depth without steady-state error although the desired depth was given in one step, and show robustness properties against changes in the parameters such as the change of the towing sped. Especially, a modified rule shows smaller depth fluctuations and faster setting times than those obtained by a field oriented rule.

  • PDF