• 제목/요약/키워드: total construction cost

검색결과 581건 처리시간 0.031초

The need for upgrading the seismic performance objectives

  • Kutanis, Mustafa;Boru, Elif Orak
    • Earthquakes and Structures
    • /
    • 제7권4호
    • /
    • pp.401-414
    • /
    • 2014
  • The economic consequences of large earthquakes require a revolutionary change in the seismic performance objective of residential and commercial buildings. The majority of total construction costs consist of non-structural and architectural costs. Therefore, the aim of this research is to upgrade current Life Safety performance objectives and to offset adverse effects on country's economy after an occurrence of large earthquakes. However, such a proposal cannot easily prove the feasibility of cost-benefit analysis in structural design. In this paper, six generic reinforced concrete frames and dual system structures designed based on Turkish Seismic Code were used in cost analysis. The study reveals that load bearing structural systems with Immediate Occupancy performance level in seismic zones can be achieved with negligible costs.

공공도서관에 지열시스템 적용시 경제성에 관한 연구 (A Study on the Economic Analysis of Cooling-Heating System Using Ground Source Heat in a public library)

  • 최창호
    • 한국태양에너지학회 논문집
    • /
    • 제32권1호
    • /
    • pp.56-66
    • /
    • 2012
  • This study evaluated the economic benefits by comparing Cooling-Heating System with the existing system in the public library. The building's annual energy consumption was measured by adding the figures of the absorber chillers, the air conditioners and heaters in the building. The total amount of annual energy consumption was 143.51RT in air-conditioning and 83.66RT in heating. So, We made the capacity of geothermal heat pumps three 50RTs in order to check up this system. In order to estimate each construction and equipment cost and to evaluate economical efficiency, LCC(Life Cycle Cost) method was used and the service life of the building was sixty years. The result of analysis was that the geothermal cooling-heating system was more efficient than the existing system in public library.

하수처리비용을 감안하고 7Q10과 저수량에 기초한 영산강 수질관리방안 연구 (Water Quality Management of the Youngsan River based on the 7Q10 and Q275 considering Wastewater Treatment Cost)

  • 조재현;유태종
    • 상하수도학회지
    • /
    • 제16권6호
    • /
    • pp.700-709
    • /
    • 2002
  • Present condition of the Youngsan River pollution is serious. Concentrations of organic materials and nutrients are high and algal bloom takes place frequently. The pollution is mainly caused by domestic wastewater input from urban areas like Kwangju and Naju City. In this study, 6 times of water quality surveys were done for mainstream and tributaries. Delivery ratios of each tributaries are calculated with the water quality and flow data. With Arc/View GIS, sub-basin are divided and pollution loads are estimated. These data are used for water quality modeling. River quality improvement effects are analysed with 5 scenarios including process upgrade of present WWTPs and construction of new WWTPs. These scenarios are applied for the Youngsan River based on the 7Q10 and Q275. And total wastewater treatment cost in the basin is analysed for each scenario.

자재물류관리를 위한 자재 속성별 자재관리 지표 (Selection of management factors for material distribution management according to materail management indexes)

  • 하영서;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.553-557
    • /
    • 2007
  • 건설산업에서 자재와 관련된 비용은 프로젝트 특성에 따라 다르지만 일반적으로 원가구성비 측면에서 40% 이상을 차지한다. 최근 대형화, 전문화, 복잡화 되어가는 건축 공사에서 자재의 반입, 이동 및 적재공간의 협소로 인해 자재관리가 매우 복잡하다. 하지만 대두분의 경우 자재관리는 현장 관리자의 경험에 의존해 관리되고 있으며 건설관리분야중 자재관리의 중요성에 대한 인식도 낮은 실정이다. 이에 대한 건설 산업에서 자재관리에 대한 연구도 활발히 진행되고 있다. 본 연구에서는 자재의 속성에 따른 ETO, ATO, MTO, MTS의 네가지 분류 방법과 자재 조달 특성 및 자재 고유특성을 통하여 현장 자재의 효율적인 공급관리를 위한 자재의 속성별 관리요소를 파악한다. 이를 이용하여 자재 속성별 자재관리 지표를 선정한다.

  • PDF

프로젝트 예비비 편성 방법에 관한 연구 (Contingency and Management Reserves Estimation Method for Project Budget)

  • 권혁천;강창욱
    • 산업경영시스템학회지
    • /
    • 제39권1호
    • /
    • pp.17-24
    • /
    • 2016
  • Many organizations have transformed their business in order to survive and compete in the future. They generate projects by creating a vision, using strategies and objectives with funds aligning strategies and make efforts to complete them successfully because project success leads to business success. All projects have triple constraints such as scope, time, and cost to be completed. Project cost performance is a key factor to achieve project goals and which is mostly related with risks among various cost drivers. Projects require a cost estimation method to complete them within their budget and on time. An accurate budget cannot be estimated due to the uncertainties and risks. Thus some additional money should be funded in addition to the base budget as a contingency reserve for identified risks and a management reserve for unidentified risks. While research on contingency reserve for identified risks included in project budget baseline have been presented, research on management reserve for unidentified risks included in total project budget is still scarce. The lack of research on estimation method and role of the management reserve have made project managers little confidence to estimate project budget accurately with reasonable basis. This study proposes a practical model to estimate budgets including contingency and management reserves for not only project cost management but also to keep the balance of organization's total funds to maximize return on investments for project portfolio management. The advantages of the proposed model are demonstrated by its application to construction projects in Korea and the processes to apply this model for verification are also provided.

A Relationship of Managing Impacts of FOREX Fluctuations and Organizational Capabilities in Construction Business

  • Mohamed, Mohd Amizan Bin;Teo, Melissa;Kajewski, Stephen;Trigunarsyah, Bambang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.477-480
    • /
    • 2015
  • Construction projects are high-risk activities. When undertaking such projects in an international setting, it can be complicated by foreign exchange (FOREX) fluctuation risk. This affects the construction business performance in various ways, namely its progress due to delays, which in turn create further problems, specifically cost overruns as a result of price increase in raw materials, disputes, arbitration, litigation and even, total abandonment. Thus, the effective management of FOREX fluctuations is crucial. Previous studies have focused on the need for contract safeguards, adequate insurance, careful planning and management, as well as foreign exchange futures hedging to address some of the risks triggered by FOREX fluctuations. An analysis of FOREX fluctuations in the international construction industry revealed that more often it was focused on project-specific issues. Currently, there is a relative lack of awareness on Organizational Capabilities (OC), the abilities that owned by the organization, which is essential in managing the impact of FOREX fluctuations. Where research has focused on OC, these are viewed in isolation. Therefore, this study attempts to close the gap by proposing a framework on managing the impact of FOREX fluctuations in the international construction industry, employing the OC perspective.

  • PDF

APR+ 표준설계 발전원가 분석 (A Generating Cost Evaluation of APR+ Standard Design)

  • 하각현;김성환;이재호
    • 에너지공학
    • /
    • 제23권4호
    • /
    • pp.236-239
    • /
    • 2014
  • 한수원 중앙연구원은 2007년부터 정부과제의 하나로 전기출력이 1500MWe급인 GEN.III+ 원전 APR+를 개발하고 있다. APR1400에 비해 보다 개선된 안전성과 경제성을 갖는 원전을 개발하기 위해 국내 건설 중인 원전과 해외에서 개발 또는 건설 중인 ALWR(Advanced Light Water Reactor)의 설계내용 및 후쿠시마 원전사고로부터 도출된 개선사항을 반영하여 한국 실정에도 맞고, 해외 수출형 원전에도 부합되는 원전을 설계하고 있다. APR+의 경쟁력을 확인하기 위해 APR+ 표준설계개발 단계에서 3회의 경제성 평가를 수행하였다. 표준설계개발 단계에의 3차(최종) 경제성 평가 결과 APR+ N-th호기는 국내석탄화력 1000MWe급 대비 약 23% 경쟁력 우위인 것으로 평가되었다.

몽골에서의 지열 시스템 적용을 위한 주택 에너지분석 (Analysis on Housing Energy for Applying Geothermal System in Mongolia)

  • 김진호;김중헌;신승호
    • 한국지열·수열에너지학회논문집
    • /
    • 제10권2호
    • /
    • pp.19-23
    • /
    • 2014
  • In the capital of Mongolia where the air quality is getting worse due to the coal consumption used for electricity generation and district heating, the application of geothermal systems in the housing sector is recently designed for high class resort. In this study, the case of applying a geothermal system in a house in Mongolia is examined. The effects of passive house design on the needed heat pump capacity, as well as the annual energy consumption are analyzed. Moreover, as the initial costs, except labor fee, are assumed similar to Korea, cost analysis for several cases is examined, too. From the results, if a house is designed according to passive house standard instead of ASHRAE standard, the heat pump capacity can be expected to be reduced from 16 to 5~6 RT. Furthermore, although the initial cost of architectural cost might increased by 29 M\, the total initial cost is reduced by 14 M\, while the annual energy consumption is reduced by 14%. This is mainly driven by the fact that the geothermal system which serves as the main system to cover the building needs, with a high initial cost for fulfilling the peak requirements.

A Study on DEM-based Automatic Calculation of Earthwork Volume for BIM Application

  • Cho, Sun Il;Lim, Jae Hyoung;Lim, Soo Bong;Yun, Hee Cheon
    • 한국측량학회지
    • /
    • 제38권2호
    • /
    • pp.131-140
    • /
    • 2020
  • Recently the importance of BIM (Building Information Modeling) that enables 3D location-based design and construction work is being highlighted around the world. In Korea, the road map has been established to settle the design based on BIM using drone survey results by 2025. As the first step, BIM would be applied to road construction projects worth more than 50 billion Korean Won from 2020. On the other hand, drone survey regulation has been enacted and the data for drone survey cost were also included on Standard of construction estimate in 2020. However, more careful improvement is required to reflect drone survey results in BIM design and construction. Currently, Engineering instructions and Standard of construction estimate specifies that earthwork volume must be calculated by cross section method only. So it is required to add the method of DEM (Digital Elevation Model) based volume calculation on these regulations to realize BIM application. In order for that, this study verified the method of DEM based earthwork volume calculation. To get an accurate DEM for accurate volume computation, drone survey was carried out according to the drone survey regulation and then could get an accurate DEM data which have errors less than 3cm in X, Y and 6.8cm in H. As each DEM cell has 3D coordinate component, the volume of each cell can be calculated by obtaining the height of area of the cell then total volume is calculated by multiplying total number of cells by volume of each cell for the construction area. Verification for the new calculation method compare with existing method was carried out. The difference between DEM based volume by drone survey and cross section based volume by traditional survey was less than 1.33% and it can be seen that new DEM method will be able to be applied to BIM design and construction instead of cross section method.

Evaluation of Structural Behaviour of High Performance Permanent Form with Stainless Steel Fiber

  • Sim Jong Sung;Oh Hong Seob;Ju Min Kwan;Shih Hyun Yang;Han Jeong Jin;Sohn Yushin
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 봄학술 발표회 논문집(I)
    • /
    • pp.499-502
    • /
    • 2005
  • Nowadays, the stripping work of form has generated some problems such as increasing total constructing cost result from delayed work schedule by the stripping work of form and environmental issues by wasting the debonded form. According to recent research for form work, it has studied about permanent form to solve economic and environmental problem which is commented above. In this study, high performance permanent form method was developed and tested by adopting COM and TEN specimens adopted on the Compression and Tensile section then the structural behaviour was investigated. In the test result, the specimen adopted the form showed better structural performance than control specimen in the point of ductility, failure mode and ultimate load.

  • PDF