• Title/Summary/Keyword: the Operation Schedule

Search Result 414, Processing Time 0.024 seconds

Synchronization of the Train PIS using the reference clock and development of a subtitle authoring tool (레퍼런스 클럭을 이용한 객차 PI 시스템 동기화 및 자막 편집기 개발)

  • Kim, Jung-Hoon;Jang, Dong-Wook;Han, Kwang-Rok
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.4
    • /
    • pp.1-10
    • /
    • 2007
  • This paper describes the development of a network-based passenger information system(PIS) which provides the convenience of the passenger of the train and heightens the effect of the subtitle service, the advertising and the shelter guidance broadcasting against the urgent event. The existing system uses VGA signal distributor in order to broadcast information with image and subtitle and voice guidance. In this paper we improve the existing system by applying the UDP and TCP/IP protocol and use a reference clock to solve a data loss and synchronization problem which occurs in this case. We also developed an XML-based subtitle authoring tool which can edit and play the subtitles with various 3D to improve the automatic guidance broadcasting and advertisement effect according to the operation schedule of the train. The system performance was evaluated through a simulation.

  • PDF

The Train Conflict Resolution Model Using Time-space Network (시공간 네트워크를 이용한 열차 경합해소모형)

  • Kim, Young-Hoon;Rim, Suk-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.6
    • /
    • pp.619-629
    • /
    • 2015
  • The train conflict resolution problem refers to an adjustment of the train operation schedule in order to minimize the delay propagation when a train conflict is predicted or when a train conflict occurs. Previous train studies of train conflict resolutions are limited in terms of the size of the problems to be solved due to exponential increases in the variables. In this paper, we propose a train conflict resolution model using a time-space network to solve the train conflict situation in the operational phase. The proposed model adjusts the size of the problem by giving only the dwell tolerance in the time-space network only for stops at the station after a train conflict. In addition, the proposed model can solve large problems using a path flow variable. The study presents a train delay propagation analysis and experimental results of train conflict resolution assessments as well using the proposed model.

A Study on the Supply obligations allotment rate of New Renewable Energy in Indoor Gymnasiums with the Application of a Daylighting System (집광채광시스템을 적용한 실내체육관의 신재생에너지 공급의무 분담률에 관한 연구)

  • Park, Yun-Ha;Lee, Yong-Ho;Cho, Young-Hum;Hwang, Jung-Ha
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.3
    • /
    • pp.27-39
    • /
    • 2015
  • Under the goal of analyzing the compulsory supply share of new renewable energy according to the application of a daylighting system to indoor gymnasiums, this study conducted analysis of energy consumption and operation schedule at three indoor gymnasiums in the nation through a survey. The investigator did an Energy Plus simulation on Building A based on the analysis results and analyzed the supply share of new renewable energy in the saving effects of lighting energy according to the application of a daylighting system. As a result, When 92 prism daylighting system were installed in the upper ceiling of a stadium, they were able to meet the criteria for the minimum illumination for official games(Min : 600㏓) and optimum illumination for general games and recreations, thus saving lighting energy during the daytime(09:00~17:00). The resulting saving effects of lighting energy amounted to 44.4% for official games, 57.6% for general games, and 66.7% for recreations. In addition, the daylighting systems had a compulsory supply share of new renewable energy at 2.04% for official games, 2.75% for general games, and 2.62% for recreations, recording an average compulsory supply share of 2.5%.

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

A Study on Designing Method of Framework for NGN QoS Management (NGN 운용과정의 QoS 관리를 위한 프레임워크 설계방법)

  • Noh, Si-Choon;Bang, Kee-Chun
    • Journal of Digital Contents Society
    • /
    • v.9 no.1
    • /
    • pp.101-107
    • /
    • 2008
  • The level of transference of NGN is beginning as the operation of Access Gateway in korea at present, but NGN will keep developing continuously to the NGN integrated network until 2010. This research is finding the meaning and assignment of NGN QoS to deduct how to manage the control system and presenting the QoS control process and trial framework. The trial framework is the modeling of the QoS measurement metrics, the measurement time schedule, the section, hierarchy, instrument, equipment and method of measurement and the series of cycle & the methodology about analysis of the result of measurement. The objective standard of quality in communication service is guaranteed not by itself but by controlling and measuring continuously. Especially it's very important time to maintain the research about NGN QoS measurement and control because the big conversion of new network technology paradigm is now spreading.

  • PDF

Development of Critical Paths for Appendectomy (표준 진료 지침서(Critical Paths) 개발에 관한 연구 - 충수절제술(Appendectomy) 환자용 -)

  • Kim, Yong-Soon;Park, Jee-Won;Park, Yon-Ok;Cho, Eun-Sook;Kim, Myung-Wook
    • Quality Improvement in Health Care
    • /
    • v.2 no.2
    • /
    • pp.32-45
    • /
    • 1996
  • Background : A critical path defines an optimal sequencing and timing of interventions by physicians, nurses, and other staff for a particular diagnosis or procedure, designed to better utilize resources, maximize quality of care, and minimize delays. It can be thought of as a visualization of the patient care process. In this study, a review of appendectomy patient records was undertaken to identify a critical path for the management of this treatment. Methods: For this study, records of patients under 15 or over 65 years of age were excluded ; cases where the patient was pregnant, or where complications developed were also excluded. The remaining 21 cases were divided into two categories according to the indication for appendectomy : for acute appendicitis, and for perforated appendix or drainage of periappendical abscess. The time frame for the review was from patient examination immediately prior to operation, through discharge. The study team was composed of a surgeon, research head nurse, education head nurse, surgical part head nurse, and medical recorder. Following their review of the 21 charts, the team determined an appropriate progression and schedule for an appendectomy. Result : Through the chart and literature review, the following aspects of the care process were identified as typical and tracked : monitoring/assessment, treatment, lines/drains, medication, activity, diet, tests and patient education. Conclusion : From this study, the design team determined two separate critical paths : one for appendectomy only, and one for appendectomy plus drainage. Next, these paths must be validated and fine-tuned through clinical implementation. In addition, a comparison of our design with the critical paths determined at other hospitals would be extremely valuable for advancing research in this area. Lastly, the critical path approach to improving patient care and maximizing hospital resources should be applied to other procedures.

  • PDF

3D game animation production pipeline and application instance proposal (3D게임 애니메이션 제작 파이프라인 및 적용 사례 제안)

  • Han, Dong Hoon;Ryu, Seuc-Ho;Lee, Dong-Lyeor;Che, Te-June;Lee, Hung-Woo
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.644-646
    • /
    • 2007
  • On-line game industry had accomplished much growths and development. One in pain of the game enterprises according to quality of on-line comes to be short Game production pipeline and it is suitable in quick production schedule and to be easy to the standard research of form by of 3D game character animations which are various the game production at the time of application is possible, operation by and type by in necessity. Element by model classification of the digital base game character which is used in game it set from the research which it sees and research it analyzed and the fundamental data which is necessary to 3D game character animation productions escape it tried. And the digital motioncapture it applies a cap department system and real picture of the character animation which is various at real-time the control research moving and it advances at the time when the effectiveness is short highly in game industry and digital contents industry application the character animation production process which is possible and production pipeline escape the reporter to do it does.

  • PDF

A Study on the Enhanced Strategies for Information Disclosure Deliberative Committees (중앙행정기관 정보공개심의회 운영 개선방안 연구)

  • Choi, Jeong Min;Kim, You-seung
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.15 no.3
    • /
    • pp.7-28
    • /
    • 2015
  • This study aims to provide enhanced management strategies for information disclosure deliberative committees in the Government 3.0 era. It confirms that there has been no progress on the committees' management since the implementation of the Government 3.0 policies. On the contrary, certain retrogression aspect on the committees have been discussed. The study suggests the four alternative strategies as follows: First, the committees should be held regularly and exercise their authority for referring to discussion. Second, it must be configured that outside committee members are more than internal committee members. Also, there should not be any restriction so that external members can be a chairman. Third, the committee meetings should be in the face-to-face form in principle. The documentary deliberation could only be allowed if issues are repeated and they are similar. For this type of deliberation, the procedure and schedule should be established and complied to. Fourth, for the effective operation of the information disclosure system, department and staffing in charge are required.

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

A Study on the Dynamic Export Yard Planning Considering Pattern of Coming-in Containers (반입 패턴을 고려한 동적 수출 장치장 운영 계획에 관한 연구)

  • Lee, Jong-Ho;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.337-339
    • /
    • 2007
  • The productivity of container terminal is usually regarded same as the productivity of quay crane. Operation of quay crane for the export is started from picking up a container in yard block. In doing so, smooth flow of container is vital to maximize the productivity of quay crane. Improvement of quay crane's productivity means improvement of entire productivity in container terminal, which reinforces the competitiveness of terminal consequently. Setting effective plan is essential to improve work flow from yard to quay crane. For optimal plan, it is necessary to gather information about exact time schedule of come-and-go containers for loading, amount of containers that will be come to terminal. Generally, the arrival time of containers and the amount of containers are definite and predictable. However, in the case of export container, the arrival time of containers is random and unpredictable. This study examines the pattern of coming-in containers as time goes in container yard and provides the solution to how to plan export yard considering the change of state in terminal and adapt it to container yard plan

  • PDF