Journal of the Korea Society of Computer and Information
/
v.12
no.4
/
pp.1-10
/
2007
This paper describes the development of a network-based passenger information system(PIS) which provides the convenience of the passenger of the train and heightens the effect of the subtitle service, the advertising and the shelter guidance broadcasting against the urgent event. The existing system uses VGA signal distributor in order to broadcast information with image and subtitle and voice guidance. In this paper we improve the existing system by applying the UDP and TCP/IP protocol and use a reference clock to solve a data loss and synchronization problem which occurs in this case. We also developed an XML-based subtitle authoring tool which can edit and play the subtitles with various 3D to improve the automatic guidance broadcasting and advertisement effect according to the operation schedule of the train. The system performance was evaluated through a simulation.
The train conflict resolution problem refers to an adjustment of the train operation schedule in order to minimize the delay propagation when a train conflict is predicted or when a train conflict occurs. Previous train studies of train conflict resolutions are limited in terms of the size of the problems to be solved due to exponential increases in the variables. In this paper, we propose a train conflict resolution model using a time-space network to solve the train conflict situation in the operational phase. The proposed model adjusts the size of the problem by giving only the dwell tolerance in the time-space network only for stops at the station after a train conflict. In addition, the proposed model can solve large problems using a path flow variable. The study presents a train delay propagation analysis and experimental results of train conflict resolution assessments as well using the proposed model.
Park, Yun-Ha;Lee, Yong-Ho;Cho, Young-Hum;Hwang, Jung-Ha
Journal of the Korean Solar Energy Society
/
v.35
no.3
/
pp.27-39
/
2015
Under the goal of analyzing the compulsory supply share of new renewable energy according to the application of a daylighting system to indoor gymnasiums, this study conducted analysis of energy consumption and operation schedule at three indoor gymnasiums in the nation through a survey. The investigator did an Energy Plus simulation on Building A based on the analysis results and analyzed the supply share of new renewable energy in the saving effects of lighting energy according to the application of a daylighting system. As a result, When 92 prism daylighting system were installed in the upper ceiling of a stadium, they were able to meet the criteria for the minimum illumination for official games(Min : 600㏓) and optimum illumination for general games and recreations, thus saving lighting energy during the daytime(09:00~17:00). The resulting saving effects of lighting energy amounted to 44.4% for official games, 57.6% for general games, and 66.7% for recreations. In addition, the daylighting systems had a compulsory supply share of new renewable energy at 2.04% for official games, 2.75% for general games, and 2.62% for recreations, recording an average compulsory supply share of 2.5%.
International conference on construction engineering and project management
/
2009.05a
/
pp.732-737
/
2009
Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.
The level of transference of NGN is beginning as the operation of Access Gateway in korea at present, but NGN will keep developing continuously to the NGN integrated network until 2010. This research is finding the meaning and assignment of NGN QoS to deduct how to manage the control system and presenting the QoS control process and trial framework. The trial framework is the modeling of the QoS measurement metrics, the measurement time schedule, the section, hierarchy, instrument, equipment and method of measurement and the series of cycle & the methodology about analysis of the result of measurement. The objective standard of quality in communication service is guaranteed not by itself but by controlling and measuring continuously. Especially it's very important time to maintain the research about NGN QoS measurement and control because the big conversion of new network technology paradigm is now spreading.
Kim, Yong-Soon;Park, Jee-Won;Park, Yon-Ok;Cho, Eun-Sook;Kim, Myung-Wook
Quality Improvement in Health Care
/
v.2
no.2
/
pp.32-45
/
1996
Background : A critical path defines an optimal sequencing and timing of interventions by physicians, nurses, and other staff for a particular diagnosis or procedure, designed to better utilize resources, maximize quality of care, and minimize delays. It can be thought of as a visualization of the patient care process. In this study, a review of appendectomy patient records was undertaken to identify a critical path for the management of this treatment. Methods: For this study, records of patients under 15 or over 65 years of age were excluded ; cases where the patient was pregnant, or where complications developed were also excluded. The remaining 21 cases were divided into two categories according to the indication for appendectomy : for acute appendicitis, and for perforated appendix or drainage of periappendical abscess. The time frame for the review was from patient examination immediately prior to operation, through discharge. The study team was composed of a surgeon, research head nurse, education head nurse, surgical part head nurse, and medical recorder. Following their review of the 21 charts, the team determined an appropriate progression and schedule for an appendectomy. Result : Through the chart and literature review, the following aspects of the care process were identified as typical and tracked : monitoring/assessment, treatment, lines/drains, medication, activity, diet, tests and patient education. Conclusion : From this study, the design team determined two separate critical paths : one for appendectomy only, and one for appendectomy plus drainage. Next, these paths must be validated and fine-tuned through clinical implementation. In addition, a comparison of our design with the critical paths determined at other hospitals would be extremely valuable for advancing research in this area. Lastly, the critical path approach to improving patient care and maximizing hospital resources should be applied to other procedures.
Proceedings of the Korea Contents Association Conference
/
2007.11a
/
pp.644-646
/
2007
On-line game industry had accomplished much growths and development. One in pain of the game enterprises according to quality of on-line comes to be short Game production pipeline and it is suitable in quick production schedule and to be easy to the standard research of form by of 3D game character animations which are various the game production at the time of application is possible, operation by and type by in necessity. Element by model classification of the digital base game character which is used in game it set from the research which it sees and research it analyzed and the fundamental data which is necessary to 3D game character animation productions escape it tried. And the digital motioncapture it applies a cap department system and real picture of the character animation which is various at real-time the control research moving and it advances at the time when the effectiveness is short highly in game industry and digital contents industry application the character animation production process which is possible and production pipeline escape the reporter to do it does.
Journal of Korean Society of Archives and Records Management
/
v.15
no.3
/
pp.7-28
/
2015
This study aims to provide enhanced management strategies for information disclosure deliberative committees in the Government 3.0 era. It confirms that there has been no progress on the committees' management since the implementation of the Government 3.0 policies. On the contrary, certain retrogression aspect on the committees have been discussed. The study suggests the four alternative strategies as follows: First, the committees should be held regularly and exercise their authority for referring to discussion. Second, it must be configured that outside committee members are more than internal committee members. Also, there should not be any restriction so that external members can be a chairman. Third, the committee meetings should be in the face-to-face form in principle. The documentary deliberation could only be allowed if issues are repeated and they are similar. For this type of deliberation, the procedure and schedule should be established and complied to. Fourth, for the effective operation of the information disclosure system, department and staffing in charge are required.
International conference on construction engineering and project management
/
2022.06a
/
pp.823-830
/
2022
The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2007.12a
/
pp.337-339
/
2007
The productivity of container terminal is usually regarded same as the productivity of quay crane. Operation of quay crane for the export is started from picking up a container in yard block. In doing so, smooth flow of container is vital to maximize the productivity of quay crane. Improvement of quay crane's productivity means improvement of entire productivity in container terminal, which reinforces the competitiveness of terminal consequently. Setting effective plan is essential to improve work flow from yard to quay crane. For optimal plan, it is necessary to gather information about exact time schedule of come-and-go containers for loading, amount of containers that will be come to terminal. Generally, the arrival time of containers and the amount of containers are definite and predictable. However, in the case of export container, the arrival time of containers is random and unpredictable. This study examines the pattern of coming-in containers as time goes in container yard and provides the solution to how to plan export yard considering the change of state in terminal and adapt it to container yard plan
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.