• Title/Summary/Keyword: the Operation Schedule

Search Result 414, Processing Time 0.024 seconds

The effect of supportive periodontal therapy after periodontal treatment : A 1-year follow up. (치주치료 후 유지치주치료의 효과에 관한 평가 : 1년 관찰)

  • Kim, Shin-Young;Kim, Yong-Gun
    • The Journal of the Korean dental association
    • /
    • v.55 no.1
    • /
    • pp.22-29
    • /
    • 2017
  • Purpose : Preservation of the periodontal health of the treated patient requires supportive periodontal therapy for the elimination of periodontal disease. After Phase I therapy is completed, patients are placed on a schedule of periodic recall visits for maintenance care to prevent recurrence of the disease. The amount of tooth loss would be the most relevant criterion in an evaluation of the effect of periodontal treatment, but this would require studies with extremely long follow-up periods. Thus the most commonly used outcome criteria in clinical research have been clinical attachment level change, reduction of pocket depth and bleeding frequency. The purpose of this case study is to identify the effect of supportive periodontal therapy after periodontal flap surgery. Materials & Methods : Following routine hygienic phase of treatment, patients with chronic periodontitis received surgical periodontal treatment. Bleeding on probing, pocket depth and clinical attachment level were measured at baseline, pre-operation and 1 year follow up. All procedures were performed by one operator. Results : One year a total of 28 patients (58sites) to recheck remained, when conducted maintenance program after periodontal flap surgery was observed reduction of bleeding frequency, pocket depth and improvement of clinical attachment level. Conclusion : The results from this study indicate that supportive periodontal therapy after periodontal flap surgery is effective for reduction of bleeding frequency, pocket depth and gain of clinical attachment level.

  • PDF

Development of the Enhanced Cross-Docking Model through Compromise between Line-haul and Shuttle Service (간선과 지선간 절충을 통한 개선된 크로스도킹 모델 개발)

  • Kim, Ki-Hong;Shin, Seung-Jun;Choi, See-Yeong;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.4
    • /
    • pp.199-207
    • /
    • 2008
  • Many logistics enterprises have made efforts to achieve low costly and high efficient logistics network. The cross-docking system can be a good solution for them. However, it requires tight schedule and all-night operation inevitably for realization of ideal cross-docking. These causes the difficulty of the attainment of daily delivery target and the leave of delivery service persons. In this paper, we develop the line-haul and shuttle service compromised cross-docking model in order to solve the problems practically. We apply the storage process with the cross-docking system and the direct cross-docking between line-haul and shuttle services. The simulation model validates the shorter delivery time by the developed model than the present model.

Performance Analysis of Fault-Tolerant Scheduling in a Uniprocessor Computer (단일칩 컴퓨터의 결함허용 스케쥴링 성능 분석)

  • Kim, Sung-Soo
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.6
    • /
    • pp.1639-1651
    • /
    • 1998
  • In this paper, we present analytical and simulation models for evaluating the operation of a uniprocessor computer which utilizes a time redundant approach (such as recomputation by shilted operands) for lault-tolerant computing. In the proposed approach, all incoming jobs to the uniprocessor are duplicated, thus two versions 01 each job must be processed. Three methods for appropriately scheduling the primary and sL'Condary versions of the jobs are proposed and analyzed. The proposed scheduling methods take into account the load and the fault rate of the uniprocessor to evaluate two figures of merit for cost and profit with respect to a delay in response time due to faults and fault tolerance. Our model utilizes a fault-tolerant schedule according to which it is possible to find an optimal delay (given by $\kappa$) based on empiric parameters such as cost, the load and the fault rate of the uniprocessor.

  • PDF

A study on ship automatic berthing with assistance of auxiliary devices

  • Tran, Van Luong;Im, Nam-Kyun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.4 no.3
    • /
    • pp.199-210
    • /
    • 2012
  • The recent researches on the automatic berthing control problems have used various kinds of tools as a control method such as expert system, fuzzy logic controllers and artificial neural network (ANN). Among them, ANN has proved to be one of the most effective and attractive options. In a marine context, the berthing maneuver is a complicated procedure in which both human experience and intensive control operations are involved. Nowadays, in most cases of berthing operation, auxiliary devices are used to make the schedule safer and faster but none of above researches has taken into account. In this study, ANN is applied to design the controllers for automatic ship berthing using assistant devices such as bow thruster and tug. Using back-propagation algorithm, we trained ANN with set of teaching data to get a minimal error between output values and desired values of four control outputs including rudder, propeller revolution, bow thruster and tug. Then, computer simulations of automatic berthing were carried out to verify the effectiveness of the system. The results of the simulations showed good performance for the proposed berthing control system.

Online training and education from the VR-1 reactor-Lessons learned

  • Ondrej Novak;Tomas Bily;Ondrej Huml;Lubomir Sklenka;Filip Fejt;Jan Rataj
    • Nuclear Engineering and Technology
    • /
    • v.55 no.12
    • /
    • pp.4465-4471
    • /
    • 2023
  • Hands-on education and training is a key part of fixing and developing technology knowledge and is an inherent part of many engineering and scientific curricula. However, access to large complex training facilities, such as nuclear reactor, could be limited by various factors, such as unavailability of those facilities in the region, high traveling costs or harmonization of the schedules of hands-on E&T with theoretical lectures and with the operational schedule of the facility. To handle the issue, several success stories have been reached with the introduction of the Internet Reactor Labs (IRL). The Internet Reactor Labs can strongly contribute to accessibility of training at research reactors and can contribute to improvements in their utilization. The paper describes the development of the Internet Reactor Lab at the VR-1 reactor of the Czech Technical University in Prague. Contrary to single-purpose IRLs, it presents various modalities of online teaching and training in experimental reactor physics and reactor operation in general as well as outreach activities that have been developed in recent years.

A Time Tree Scheduling Scheme for Energy Efficiency and Collision Avoidance in Sensor Networks (센서 네트워크에서 에너지 효율과 충돌 회피를 위한 타임 트리 스케줄링)

  • Lee, Kil-Hung
    • Journal of Korea Multimedia Society
    • /
    • v.12 no.7
    • /
    • pp.962-970
    • /
    • 2009
  • This paper presents a data gathering and scheduling scheme for wireless sensor networks. We use a data gathering tree for sending the data from the sensor node to the base station. For an energy efficient operation of the sensor networks in a distributed manner, a time tree is built in order to reduce the collision probability and to minimize the total energy required to send data to the base station. A time tree is a data gathering tree where the base station is the root and each sensor node is either a relaying or a leaf node of the tree. Each tree operates in a different time schedule with possible different activation rate. Through the simulation, we found that the proposed scheme that uses time trees shows better characteristics in energy and data arrival rate when compared with other schemes such as SMAC and DMAC.

  • PDF

민자사업의 사업관리 사례분석

  • Lee Kwan-Young;Kim Se-Jong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.13-19
    • /
    • 2004
  • In most PFI(Private Finance Initiative) projects in Korea, the project management are in charge of the Special Purpose Company(SPC) established for carrying out the project. This paper is a case study about an owner CM executed by the organizations and staffs of SPC itself. : Seoulbeltway (Ilsan $\~$ Toegaewon) Private Investment Project. In time management area, the SfC was the leader of project management throughout the life circle - plan, design, permit, construction, operation and maintenance - beyond the schedule manager's role. In cost management area, the methods of reducing the total costs by VE, new technologies, etc. has been needed assuming the construction risks were subject to SPC.

  • PDF

The Sludge Collection Scheduling and Vehicle Routing Strategies (하수처리시설의 슬러지 수거 일정계획 수립 및 수거차량 경로결정)

  • Kim Min-Je;No Ui-Su;Heo Eun-Jeong;Choi Gyeong-Hyeon
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1170-1177
    • /
    • 2006
  • We apply VRP(Vehicle Routing Problem) to sludge collection system in this study. Sewage stores of villages are located in each village around a multipurpose dam. Sludge which is produced in sewage store of village is transported from the sewage store of village to the sewage treatment plants by the special purpose vehicle such as the tank lorry. In this paper, we propose sludge collection strategies which allocate each sewage store of village to sewage treatment plants and decide the schedule of sludge collection in order to collect sludge efficiently. The strategies aim to decrease transportation cost with deciding proposed vehicle routing and scheduling the sludge collection. When we decide route of vehicles, we consider the collection time in sewage store of village, distance between sewage store of villages and vehicle information as average velocity of vehicle, operation time of vehicle driver. We also develop the SCMS(Sludge Collection Management System) based on windows system with real data which is used in certain circumstance. And we experiment to figure out vehicle route and transportation cost throughout changing input data.

  • PDF

Understanding Watching Patterns of Live TV Programs on Mobile Devices: A Content Centric Perspective

  • Li, Yuheng;Zhao, Qianchuan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.9
    • /
    • pp.3635-3654
    • /
    • 2015
  • With the rapid development of smart devices and mobile Internet, the video application plays an increasingly important role on mobile devices. Understanding user behavior patterns is critical for optimized operation of mobile live streaming systems. On the other hand, volume based billing models on cloud services make it easier for video service providers to scale their services as well as to reduce the waste from oversized service capacities. In this paper, the watching behaviors of a commercial mobile live streaming system are studied in a content-centric manner. Our analysis captures the intrinsic correlation existing between popularity and watching intensity of programs due to the synchronized watching behaviors with program schedule. The watching pattern is further used to estimate traffic volume generated by the program, which is useful on data volume capacity reservation and billing strategy selection in cloud services. The traffic range of programs is estimated based on a naive popularity prediction. In cross validation, the traffic ranges of around 94% of programs are successfully estimated. In high popularity programs (>20000 viewers), the overestimated traffic is less than 15% of real happened traffic when using upper bound to estimate program traffic.

EP Based PSO Method for Solving Multi Area Unit Commitment Problem with Import and Export Constraints

  • Venkatesan, K.;Selvakumar, G.;Rajan, C. Christober Asir
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.415-422
    • /
    • 2014
  • This paper presents a new approach to solve the multi area unit commitment problem (MAUCP) using an evolutionary programming based particle swarm optimization (EPPSO) method. The objective of this paper is to determine the optimal or near optimal commitment schedule for generating units located in multiple areas that are interconnected via tie lines. The evolutionary programming based particle swarm optimization method is used to solve multi area unit commitment problem, allocated generation for each area and find the operating cost of generation for each hour. Joint operation of generation resources can result in significant operational cost savings. Power transfer between the areas through the tie lines depends upon the operating cost of generation at each hour and tie line transfer limits. Case study of four areas with different load pattern each containing 7 units (NTPS) and 26 units connected via tie lines have been taken for analysis. Numerical results showed comparing the operating cost using evolutionary programming-based particle swarm optimization method with conventional dynamic programming (DP), evolutionary programming (EP), and particle swarm optimization (PSO) method. Experimental results show that the application of this evolutionary programming based particle swarm optimization method has the potential to solve multi area unit commitment problem with lesser computation time.