The purpose of this study was to understand the current status of education and programs and to identify the items that urban residents need most for garden management. First of all, there were 45 sites (40.5%) with gardens operated by city and county local governments nationwide, and 41(91.1%) of them had dedicated staff (1.8 persons on average). The average area of gardens was 18,623 m2, garden area per person was 20.27m2, the average number of participants was 683, and the average period of use was 8.69 months. In addition to gardening activities, 14 (31.1%) out of 45 sites were operating small group meetings, with an average of 2.29 meetings and 67 participants. In the satisfaction survey after gardening activities, 88.9% of 18 sites were satisfied. According to the questionnaire about education and programs related to garden users, an average of four sessions were conducted per education. In terms of education, the contents were in the following order: basic education on garden cultivation (33.9%) > prior education on garden operation (28.9%) > pest control (14.0%) > eco-friendly management (11.6%) > pesticides and Positive List System (9.9%) > others (1.7%). Over 95% of the respondents were generally satisfied. Regarding the perception survey on which items are needed to develop garden management guidelines, the most necessary items were in the order of crop management (38.7%) > public garden etiquettes among users (27.9%) > pest control (14.4%) > weed management (13.5%) > activities using harvest (5.4%). The contents that are to be included in the guidelines were in the order of garden planning and crop selection (17.2%) > cultivation techniques and schedule (16.5%) > pest and soil management (15.7%) > introduction of garden crops and gardening models (12.7%) > garden etiquettes (10.7%). In establishing urban garden management plans by region, the results will have high utility value as the basic data for continuous garden operation by setting a direction that meets the regional characteristics as well as the needs of urban residents.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2015.05a
/
pp.735-737
/
2015
In this paper, SaaS (Software as a Service) based transport and construction process safety management systems by utilizing the construction work process management and safety management and schedule, and results for various types of construction process, achieved through high-speed wireless Internet access by applying to ensure a systematic means for safety and can quickly and accurately manage all made within the process control system. The operator should be indicated by using a smart phone to work as a supervisor report the current status and results of the operation. Also be reported to the supervisor immediately in an emergency situation and there is no vibration occurs over a period of time the smartphone is to check the danger to the operator. If the commissioner is directed to specific business processes that establish and verify the results obtained and the result is satisfied by presenting the part down the measures insufficient command of the field workers risk situations. In the case of software (server) to store all the data relating to the operation member in charge of management and security.
Mixed Model Assembly Lines (MMALs) are increasingly used to produce differentiated products on a single assembly line without work-in-process storage, Usually, a typical MMAL consists of a number of (1) stations doing exactly the same operation on every job, (2) stations involving operations with different choices, and (3) stations offering operations that are not performed on every job, or that are performed on every job but with many options. For stations of the first type there is no sequencing problem at all. However, for the second type a set-up cost is incurred each time the operation switches from one choice to another. At the third type of stations, different models, requring different amounts and choices of assembly work, creates an uneven flow of work along the line and variations in the work load at these stations. When a subsequence of jobs requires more work load than the station can handle, it is necessary to help the operations at the station or to complete the work elsewhere. Therefore, a schedule which minimize the sum of set-up cost and utility work cost is desired. So this study has developed Fixed Random Ordering Rule (FROR), Fixed Ascending Ordering Rule (FAOR), Fixed Descending Ordering Rule, and Extended NHR (ENHR). ENHR is to choose optimal color ordering of each batch with NHR, and to decide job sequence of the batch with it, too. As the result of experiments, ENHR was the best heuristic algorithm. NHR is a new heuristic rule in which only the minimum addition of violations from both partial sequence and unassigned sequence at every branch could be considered. And this is a heuristic sequencing rule for the third type of stations at MMAL. This study developed one more heuristic algorithm to test the performance of NHR, which is named as Practical Heuristic Rule (PHR).
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.2
/
pp.113-118
/
2016
Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.
Kim, Sun-Ju;Jeong, Hyeonju;Choi, Sewan;Cho, Jun-Ho;Jeon, Yujong;Park, Jun-Sung;Yoon, Hye-Sung
The Transactions of the Korean Institute of Power Electronics
/
v.27
no.1
/
pp.26-32
/
2022
This paper proposes a power system that includes a 120k W fuel cell DC-DC converter (FDC) and 30 kW bidirectional DC-DC converter (BHDC) for a 150 kW fuel-cell vehicle. With a high DC link voltage of 800 V, the efficiency and power density of the power electronic components are improved. Through the modular design of FDC and BHDC, electric components are shared, resulting in reduced mass production costs. The switching frequency of 30 kHz of full SiC devices and optimal design of coupled inductor reduce the volume, achieving a power density of 8.3 kW/L. Furthermore, a synergetic operation strategy using variable limiter control of FDC and BHDC was proposed to efficiently operate the fuel cell vehicle considering the fuel cell stack efficiency according to the load. Finally, the performance of the prototype was verified by Highway Fuel Economy Driving Schedule testing, EMI test, and the linked operation between FDC and BHDC. The full load efficiencies of the FDC and BHDC prototypes are 98.47% and 98.74%, respectively.
Ahn, Eun Yeong;Kang, Byoungho;Kang, Jaeho;Ryu, Kwang Ryel;Kim, Kap Hwan
Journal of Intelligence and Information Systems
/
v.12
no.3
/
pp.47-65
/
2006
These days, the number of automated container terminals is increasing to encourage the productivity of the container terminal inside and outside of the country. So far, there have been a lot of researches on the operating one type of equipments in a container terminal. However, there is still room for further improvement as none of equipment works itself but cooperate each other to finish a job, which means synchronization among the equipments is necessary. Among lots of equipments in a terminal, this paper concerns with the operation of ATCs (Automated Transfer Crane) and YTs (Yard Truck). The purpose of this paper is to find the efficient heuristic methods for operating ATCs and YTs that can set up a schedule in a real time. Moreover, using simulation this paper shows the efficient stacking strategy to decide the location of containers to be put and the proper selection range of YTs.
This paper proposes a realtime scheduling method using local search algorithm for non-crossable yard cranes in automated container terminal. To take into consideration the dynamic property of yard crane operation and satisfy the real time constraint, the proposed method repeatedly builds crane schedule for the jobs in a fixed length look-ahead horizon whenever a new job is requested In addition, the proposed method enables the co-operation between yard cranes through prior re-handling and re-positioning in order to resolve the workload imbalance problem between the two cranes, which is one of the primary causes that lower the performance of yard cranes. Simulation-based experiments have shown that the proposed method outperforms the heuristic based methods, and the cooperation scheme contributes a lot to the performance improvement.
Journal of the military operations research society of Korea
/
v.33
no.1
/
pp.105-115
/
2007
It is essential to give a fatal damage to the enemy force by using prompt and accurate fire in order to overcome the lack of artillery force. During the artillery fire operations, minimizing the firing time will secure the adapt ability in tactical operation. In this paper, we developed a mathematical model to schedule the artillery fire on the multiple targets to decrease total fire operation time. To design a program to describe a real firing situation, we consider many possible circumstances of changes such as commander's intention, firing constraints, target priority, and contingency plan to make a fire plan in an artillery unit. In order to work out the target sequencing problem, MIP is developed and the optimum solution is obtained by using ILOG OPL. If this analytical model is applied to a field artillery unit, it will improve the efficiency of the artillery fire force operations.
The purpose of this study is to analyze the effect of commuter's departure time on transportation system in future traffic system operated autonomous vehicle using agent based model. Various scenarios have been set up, such as when all passenger choose a similar departure time, or if the passenger chooses a different departure time. Also, this study tried to analyze the effect of road capacity. It was found that although many of the scenarios had been completed in a stable manner, many commuters were significantly coordinated at the desired departure time. In particular, in the case of a reduction in road capacity or in certain scenarios, it has been shown that, despite excessive schedule adjustments, many passengers are unable to commute before 9 o'clock. As a result, it is suggested that traffic management and pricing policies are different from current ones in the era of autonomous car operation.
Journal of the Institute of Electronics Engineers of Korea SP
/
v.47
no.1
/
pp.159-168
/
2010
In the recent years, power analysis attacks were widely investigated, and so various countermeasures have been proposed. In the case of block ciphers, masking methods that blind the intermediate results in the algorithm computations(encryption, decryption, and key-schedule) are well-known. The type conversion of masking is unavoidable since Boolean operation and Arithmetic operation are performed together in block cipher. Messerges proposed a masking type conversion algorithm resistant general power analysis attack and then it's vulnerability was reported. We present that some of exiting attacks have some practical problems and propose a new power analysis attack on Messerges's algorithm. After we propose the strengthen DPA and CPA attack on the masking type conversion algorithm, we show that our proposed attack is a practical threat as the simulation results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.