• Title/Summary/Keyword: the Operation Schedule

Search Result 414, Processing Time 0.026 seconds

A Study on Training Education Effect of Training Terms for Trainees in Training Ship- I (실습선 학생교육 기간에 따른 실습교육 효과에 관한 연구- I)

  • Park Young-Soo;Kim Jong-Sung;Bae Byung-Duck;Lee Hyong-Ki;Lee Yun-Sok;Yun Gwi-Ho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.83-88
    • /
    • 2005
  • The training ships of maritime university in Korea are operated in the suitable schedule. However, there is no paper to grasp the education effect of the coastal navigation and ocean-going navigation terms. As the first step of these training education effects, this paper investigates the effect of training terms and provides the basic materials of the efficient training education. This paper used the 6 times test scores based on test book for 3/0 officer as the assess method. The results are as follows. (1)The higher credits scored in university times, the higher test scores gained in training ship. (2)After ocean-going navigation, the test score was the best(3) The longer the training period is, the more the difference of individual capacity is.

  • PDF

A Study on Training Education Effect of Training Terms for Trainees in Training Ship- I (실습선 학생교육 기간에 따른 실습교육 효과에 관한 연구-I)

  • Park Young-Soo;Kim Jong-Sung;Bae Byung-Duck;Lee Hyong-Ki;Lee Yun-Sok;Yun Gwi-Ho
    • Journal of Navigation and Port Research
    • /
    • v.30 no.1 s.107
    • /
    • pp.23-27
    • /
    • 2006
  • The training ships of maritime university in Korea are operated in the suitable schedule. However, there is no paper to grasp the education effect of the coastal navigation and ocean-going navigation terms. As the first step of these training education effects, this paper investigates the effect of training terms and provides the basic materials of the efficient training education. This paper used the 6 times test scores based on test book for 3rd officer as the assess method The results are as follows. (1)The higher credits scored in university times, the higher test scores gained in training ship. (2)After ocean-going navigation, the test score was the best.(3) The longer the training period is, the more the difference of individual capacity is.

A Study on the Success Factors of Port Operation for New International Passenger Terminal Using Fuzzy Theory (퍼지이론을 이용한 인천항 신국제여객터미널의 항만운영 성공요인에 관한 연구)

  • Yoo, Sung-Jai;Cha, Young-Doo;Yeo, Gi-Tae
    • Journal of Digital Convergence
    • /
    • v.14 no.11
    • /
    • pp.91-100
    • /
    • 2016
  • The purpose of this study was to draw out success factors of port operation for New International Passenger Terminal(NIPT) in Incheon Port using the fuzzy method. In this study, the success factors of port operation were firstly selected by literature review and finally adopted them by in-depth interview with experts who had working experiences over 15 years in the field of Korea-China Carferry shipping business and stevedoring business. Success factors of port operation of the NIPT have been classified into four principal factors such as 'land's use side', 'productivity side', 'cost side' and 'services side', and the comparative analysis was conducted among success factors of port operation. According to the results of analysis, in terms of "land's use side", securing CY space of full-empty containers(0.857) was the most important factor. Among detailed factors of "productivity side", building terminal automation system(0.806) was significantly needed. In the factors of "cost side" and "service side", land rental costs(0.861) and schedule management of berth operation(0.798) were selected as the most important factors. Consequently, new international passenger terminal has implications that the main port operations should focus on reasonable rents calculation, ensuring proper space of CY, and building automation system of terminal, There is a need to proceed to conduct a comparative study of the same operating mode of an international passenger terminal.

KCCH Medical Cyclotron Operation for Neutron Therapy and Isotope Production (1989) - A Technical Report - (중성자 치료와 동위원소 생산을 위한 KCCH 의학용 싸이클로트론의 운영 (1989))

  • Kim, Byung-Mun;Kim, Young-Sear;Bak, Joo-Shik;Lee, Jong-Du;Yoo, Seong-Yul;Koh, Kyung-Hwan
    • Journal of Radiation Protection and Research
    • /
    • v.15 no.2
    • /
    • pp.113-122
    • /
    • 1990
  • After four years of planning, equipment acquisition, facility construction and beam testing, the KCCH cyclotron facility was put into operation in November1986. Now the KCCH cyclotron(MC-50) has been used for four years in neutron therapy and radioisotope production. Up to December 1989, 179(1852 sessions) patient have undergone neutron therapy. Radioisotope production for nuclear medicine use was started from March 1989 after extensive work to overcome target transport, target melting, beam diagnostic and chemical processing problems. This status report introduces the cyclotron facility, and the experiences of neutron therapy and isotope production with the MC-50 cyclotron. Besides, the operation results and the general troubles of the MC-50 during 1989 are summarized. Total operation time was 1252.5 hours. Four hundred hours were used for neutron therapy of 599 treatment sessions and 832.5 hours for radioisotope production. Total amount of produced raioisotope was 1695 mCi(Ga-67 : 1478mCi, Tl-201 : 107 mCi, I-123 : 25mCi, In-111 : 85mCi). Twenty hours were used for scheduled beam testing. In 1989, 882% of the planned operation were performed on schedule and this rats is improved remarkably compared to 71.0% in 1988.

  • PDF

Development of a Critical Pathway for Patients with Coronary Artery Bypass Graft (관상동맥 우회술 환자를 위한 Critical Pathway개발)

  • 김기연
    • Journal of Korean Academy of Nursing
    • /
    • v.28 no.1
    • /
    • pp.117-131
    • /
    • 1998
  • The purpose of this study was to develop a critical pathway for case management for patients who have received Coronary Artery Bypass Graft (CABG) because of Ischemic Heart Disease(IHD) which is a factor of rising medical expenses. For this study. a conceptual framework was developed through a review of the literature including six critical pathways which are currently being used in USA. In order to identify the overall service contents required by these patients and to draw up a preliminary critical pathway, 30 cases of medical records of patients who had CABG because of IHD between January, 1995 to June. 1996 at the Cardiovascular Center of Yonsei Medical Center in Seoul were analyzed. An expert validity test was done for the preliminary critical pathway and clinical validity test was also done using seven IHD patients with CABG between November 11 and 23, 1996. After these processes. the final critical pathway was developed. The results of this study are summarized as follows : 1. The vertical axis of the critical pathway includes the following eight items : tests, nutrition, medications, consultations, activity, assessments, treatments, education discharge planning and the horizontal axis includes the time from the start of hospitalization to discharge. 2. Analysis of the 30 medical records indicated that the average length of stay was 20.2days with the average length of stay from hospitalization day to operation day being 6.2 days, and the average length of stay from operation day to discharge day was 13. 9 days. Analysis of the service contents showed that the horizontal axis of the preliminary critical pathway was set from hospitalization to the 14th post operation day and the vertical axis was set to include eight items, the contents which ought to have occurred, according to the time frames of the horizontal axis. 3. As a result of the experts validity, it was found that among the total of 571 items. there was over 83% agreement for 482 items, less than 83% for 89 items, which were then deleted and a revision of the critical pathway was done. 4. A clinical validity test was done using seven IHD patients with CABG. During the process, three patients were deleted because they were out of the criteria the investigator set. Finally, four patients were used. The result of study indicated that only one patient was discharged on the tenth post operation day, which was one day later than the expected day. Three patients were discharged later than the expected day from three days to nine days. All the cases progressed on schedule until the operation day and the first post operation day, but from the second post operation days, there were differences between the critical pathway and the actual practice. The differences came from tests, assessments, and treatments. 5. On the basis of the results of the clinical validity test. the following revisions in the final critical pathway were made : the transfer from ICU to step down ward would be the second post operation day, and the transfer to a general ward, the fifth post operation day, for patients who complained of lack of sleep from the fifth post operation day to discharge, a sleeping pill would be prescribed, skin observations would be performed routinely from immediately after the operation until the third post operation day, and would continue if there was a sign of skin injury on the fourth post operation day, and assessment of chest pain would be done from the third post operation day, and the “stairs climbing” item, expected to be done on the ninth post operation day would be deleted. In conclusion, this critical pathway is partially applicable to the care of patients with CABG but there are some parts needed to be further investigated.

  • PDF

Optimized Implementation of PIPO Lightweight Block Cipher on 32-bit RISC-V Processor (32-bit RISC-V상에서의 PIPO 경량 블록암호 최적화 구현)

  • Eum, Si Woo;Jang, Kyung Bae;Song, Gyeong Ju;Lee, Min Woo;Seo, Hwa Jeong
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.11 no.6
    • /
    • pp.167-174
    • /
    • 2022
  • PIPO lightweight block ciphers were announced in ICISC'20. In this paper, a single-block optimization implementation and parallel optimization implementation of PIPO lightweight block cipher ECB, CBC, and CTR operation modes are performed on a 32-bit RISC-V processor. A single block implementation proposes an efficient 8-bit unit of Rlayer function implementation on a 32-bit register. In a parallel implementation, internal alignment of registers for parallel implementation is performed, and a method for four different blocks to perform Rlayer function operations on one register is described. In addition, since it is difficult to apply the parallel implementation technique to the encryption process in the parallel implementation of the CBC operation mode, it is proposed to apply the parallel implementation technique in the decryption process. In parallel implementation of the CTR operation mode, an extended initialization vector is used to propose a register internal alignment omission technique. This paper shows that the parallel implementation technique is applicable to several block cipher operation modes. As a result, it is confirmed that the performance improvement is 1.7 times in a single-block implementation and 1.89 times in a parallel implementation compared to the performance of the existing research implementation that includes the key schedule process in the ECB operation mode.

Effect of the Application of the CBD Output Management Technique for the Development of Operation Software for a Space Observation System

  • Seo, Yoon Kyung;Rew, Dong Young;Kirchner, Georg;Nah, Jakyoung;Jang, Bi-Ho;Heo, Jiwoong;Youn, Cheong
    • Journal of Astronomy and Space Sciences
    • /
    • v.31 no.3
    • /
    • pp.265-276
    • /
    • 2014
  • The application of software engineering is not common in the development of astronomical observation system. While there were component-wise developments in the past, large-scale comprehensive system developments are more common in these days. In this study, current methodologies of development are reviewed to select a proper one for the development of astronomical observation system and the result of the application is presented. As the subject of this study, a project of operation software development for an astronomical observation system which runs on the ground is selected. And the output management technique based on Component Based Development which is one of the relatively recent methodologies has been applied. Since the nature of the system requires lots of arithmetic algorithms and it has great impact on the overall performance of the entire system, a prototype model is developed to verify major functions and performance. Consequently, it was possible to verify the compliance with the product requirements through the requirement tracing table and also it was possible to keep to the schedule. Besides, it was suggested that a few improvements could be possible based on the experience of the application of conventional output management technique. This study is the first application of the software development methodology in the domestic astronomical observation system area. The process and results of this study would contribute to the investigation for a more appropriate methodology in the area of similar system development.

A study of the train traffic optimal control system in a circular metro line (도시형 순환 열차에서 운전 최적제어 시스템에 관한 연구)

  • Hong, Hyo-Sik;Ryu, Kwang-Gyun;Song, Noon-Suck
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.236-246
    • /
    • 2003
  • This paper is implemented a control algorithm in order to be stable and minimized to entire train traffic system at delayed case. Signal ing system is described wi th algebraic equations given for train headway, Discrete-event simulation principles are reviewed and a demonstration block signaling model using the technique is implemented. Train congestion at station entrance for short headway operation is demonstrated and the propagation of delays along a platform of trains from any imposed delay to the leading train is also shown. A rail way signaling system is by nature a distributed operation with event triggered at discrete intervals. Although the train kinematic variables of position, velocity, and acceleration are continually changing, the changes are triggered when the trains pass over section boundaries and arrive at signals and route switches. This paper deals with linear-mode1ing, stability and optimal control for the traffic on such metro line of the model is reconstructed in order to adapt the circuits. This paper propose optimal control laws wi th state feedback ensuring the stability of the modeled system for circuits. Simulation results show the benefit to be expected from an efficient traffic control. The main results are summarized as follows: 1. In this paper we develop a linear model describing the traffic for both loop lines, two state space equations have been analyzed. The first one is adapted to the situation where a complete nominal time schedule is available while second one is adapted when only the nominal time interval between trains is known, in both cases we show the unstability of the traffic when the proceeding train is delayed following properties, - They are easily implemented at law cost on existing lines. - They ensure the exponetial stability of loop system. 2. These control laws have been tested on a traffic simulation software taking into the non-linearites and the physical constraints on a metro line. By means of simulation, the efficiency of the proposed optimal control laws are shown.

  • PDF

A Case Study on the Aggregate Planning of Multi-product Small-batch Production Facilities: Focusing on System Dynamics Simulation Modeling (다품종 소량생산 설비의 총괄생산계획에 관한 사례 연구: 시스템다이내믹스 시뮬레이션 모델링을 중심으로)

  • Lee, Seungdoe;Kim, Sang Won
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.1
    • /
    • pp.153-167
    • /
    • 2022
  • Purpose: The purpose of this study is to guide the operation managers who plan daily production of large mass-processing facility that services multi-customers with multi-product, small-batch item characteristics by providing the practical best production quantity and the inventory allowed to build. Methods: Close observation of a subcontract paint-shop operator captured the daily decision process which was reflected in the subcontractor-unique mathematical model and the system dynamics simulation model. Multiple simulations were run to find the practical best production quantity and the maximum allowable stock level of inventory that did not undermine the profit from practical best daily production. Actual data and a few constant values were obtained from the firm under study. Results: While the inventory holding cost for the customer-owned material harms the total profit of the subcontractor, the running cost of the processing facility hinders production in small batches. This balances the maximum possible productions and results in practical best daily production which can be found through simulation runs with actual data. The maximum level of stocked inventory is deduced from the practical best daily production. Conclusion: To build a large volume that enables economy-of-scale production, operators should deal with multi-product small-batch items from multiple customers. When the planned schedule of the time and amount of material in-flow tend not to be reliable, operators can find it practical to execute level production across the planning horizon instead of adjusting to day-to-day in-flow fluctuations.

Predicting Risk Factors for Pressure Sores in Patients Undergoing Operations ; A Prospective Study (수술환자의 욕창예측변수에 관한 연구)

  • Pak Soon-Mi;Jun Seong-Sook
    • Journal of Korean Academy of Fundamentals of Nursing
    • /
    • v.6 no.2
    • /
    • pp.267-276
    • /
    • 1999
  • The purpose of this study was to identify risk factors predictive of alterations in skin integrity during the intraoperative period. The predictive risk factors were studied for intraoperative pressure sores from December 1998 through January 1999. A sample of 220 patients was selected from the operating room schedule of a University Hospital in Pusan. There were two criteria in including patients : the operation lasted longer than 2 hours and the absence of skin break-down according to NPUAP criteria. The data were analized by SPSS/PC, Stepwise multiple logistic regression was used to identify the variables which were predictive of alterations in skin integrity. Of the 220 patients studied, 41 patients (18.6%) developed stage 1 pressure sores in the immediate postoperative period. In relation to skin changes, three independent variables emerged from the stepwise multiple logistic regression as being significant (p<0.05). Factors predictive of pressure sore formation included low serum albumin(p=0.000), prone position while undergoing surgery(p=0.0004), time on the operating table(p=0.0165). Among the intrinsic factors, serum albumin was the most significant causal factor in pressure sores development in the intra-operative period. Pressure and shearing force were the most significant extrinsic factors in pressure sores development. From the results of this study we concluded that the primary nursing goal is the maintenance of the proper patient' position during the intraoperative period. Also imperative for sore prevention is the reduction of surgery time and improving preoperative nutritional status.

  • PDF