• Title/Summary/Keyword: the Operation Schedule

Search Result 414, Processing Time 0.019 seconds

A Case Study on the Vibration by Fluid Induced Instability at Large Steam Turbine-generator (대형 터빈-발전기에서의 유체 불안정진동 해소사례)

  • Han, Seung-Woo;Roh, Cheol-Woo;Yoo, Mu-Sang;Kim, In-Chul;Joo, In-Gouk;Kim, Myong-Shik
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.18 no.2
    • /
    • pp.238-246
    • /
    • 2008
  • This case study refers to turbine-generator with retrofitted turbine rotor. Vibration problem occurring after the retrofit was mainly due to high vibration from exciter side. However, repeated test run and operation during scheduled maintenance caused high vibration from generator bearing, and post-overhaul test run before turbine vibration correction caused oil whip on the bearing. This case study shows how to analyze vibration condition of high turbine generator vibration detected during the post-overhaul test run and vibration condition of offline and online data to reflect it on establishing maintenance schedule and overhaul correction procedure. Vibration data could be acquired during steady load operation or even with varying speed and load. Each data is important for machinery condition evaluation. This case study shows that the vibration data during extreme condition is the key factor in analysis, which helps to find the machinery problem.

Simulation of Interim Spent Fuel Storage System with Discrete Event Model (이산 모형을 이용한 사용후 핵연료 중간 저장 시설의 전산기 모사)

  • Yoon, Wan-Ki;Song, Ki-Chan;Lee, Jae-Sol;Park, Hyun-Soo
    • Nuclear Engineering and Technology
    • /
    • v.21 no.3
    • /
    • pp.223-230
    • /
    • 1989
  • This paper describes dynamic simulation of the spent fuel storage system which is described by statistical discrete event models. It visualizes flow and queue of system over time, assesses the operational performance of the system acitivies and establishes the system components and streams. It gives information on system organization and operation policy with reference to the design. System was tested and analyzed over a number of critical parameters to establish the optimal system. Workforce schedule and resources with long processing time dominate process. A combination of two workforce shifts a day and two cooling pits gives the optimal solution of storage system. Discrete system simulation is an useful tool to get information on optimal design and operation of the storage system.

  • PDF

A Study of Flight Scheduling Problem on Fighter Squadron (전투비행대대 비행스케줄링에 관한 연구)

  • Lee, Moongul;Seo, Sanghoon
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.39 no.2
    • /
    • pp.37-48
    • /
    • 2014
  • Fighter squadron flight scheduling is the integrated air operation plan that is an important role for improving pilot's flight skill and maintaining combat readiness by efficient using available all air resources including pilot, aircrafts, air-weapons, fuel and supporting facilities etc. Korea airforce, however, has a limit as to an effective flight operation due to manual flight scheduling with scheduler's own experience and intuition. Therefore, in our study, we propose the optimization model of flight scheduling based on mixed integer programming. This model includes several constraints of realistic and essential quantified data related with flight schedule and can assign appropriate pilots optimally which are distinctive three type's solutions : flight, alert and duty crew schedules. Proposed solution method can be improved pilot's capability and allocated further air resources systematically and efficiently. In addition, it can be reduced a workload of flight scheduler and minimized obstructed factors of flight safety. Finally, we demonstrate the experiment's results for the check of efficiency and validity of this model.

Analysis on Reliabilities of Seoul's Trunk Bus Lines Using BMS Data (through Data Envelopment Analysis) (BMS 자료를 이용한 서울시 간선버스의 정시성 분석(자료포락분석기법을 적용하여))

  • O, Mi-Yeong;Jeong, Chang-Yong;Son, Ui-Yeong
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.1
    • /
    • pp.63-71
    • /
    • 2009
  • The purpose of this paper is to identify unreliable routes in the view of users. After headway error ratio per route and travel time error ratio per route were calculated by using BMS data, reliability which incorporated two indicators each route was calculated through data envelopment analysis. Reliability among routes and among traffic zones was compared through the results, the needs to improve severely unreliable routes and to show passengers adjusted bus schedule information considering current reliability were suggested. As a future study, reliability evaluation framework of each route needs to be developed considering operation environment by analyzing bus card data (passengers and operation speed etc.) and pooly unreliable route should be managed strictly and reformed.

A Scheduling Approach using Gradual Mobility Reduction for Synthesizing Pipelined Datapaths (파이프라인 데이터패스 합성을 위한 점진적 배정가능범위 축소를 이용한 스케줄링 방법)

  • Yoo, Hee-Jin;Oh, Ju-Young;Lee, Jun-Yong;Park, Do-Soon
    • The KIPS Transactions:PartA
    • /
    • v.9A no.3
    • /
    • pp.379-386
    • /
    • 2002
  • This paper presents a scheduling approach for synthesizing pipelined datapaths under resource constraints. Our approach builds up a schedule based on gradual mobility reduction in contrast to other algorithms of previous researches, where an operation being scheduled is selected by using a priority function. The proposed method consists of a scheduling algorithm and a decision algorithm for detecting any violation against resource constraints. Our approach evaluates whether or not a scheduling solution can exist in case an operation temporarily is assigned to the earliest or latest control step among the assignable steps for the operation. If a solution cannot be found, it is impossible to assign the operation to that step due to a violation against resource constraints, and so we can eliminate that control step. This process is iterated until a reduction of mobility for all operations can not be obtained. Experiments on benchmarks show that this approach gains a considerable improvement over those by previous approaches.

Flash Operation Group Scheduling for Supporting QoS of SSD I/O Request Streams (SSD 입출력 요청 스트림들의 QoS 지원을 위한 플래시 연산 그룹 스케줄링)

  • Lee, Eungyu;Won, Sun;Lee, Joonwoo;Kim, Kanghee;Nam, Eyeehyun
    • Journal of KIISE
    • /
    • v.42 no.12
    • /
    • pp.1480-1485
    • /
    • 2015
  • As SSDs are increasingly being used as high-performance storage or caches, attention is increasingly paid to the provision of SSDs with Quality-of-Service for I/O request streams of various applications in server systems. Since most SSDs are using the AHCI controller interface on a SATA bus, it is not possible to provide a differentiated service by distinguishing each I/O stream from others within the SSD. However, since a new SSD interface, the NVME controller interface on a PCI Express bus, has been proposed, it is now possible to recognize each I/O stream and schedule I/O requests within the SSD for differentiated services. This paper proposes Flash Operation Group Scheduling within NVME-based flash storage devices, and demonstrates through QEMU-based simulation that we can achieve a proportional bandwidth share for each I/O stream.

Thermal Influential Factors of Energy Pile (에너지 파일의 열적거동 인자분석)

  • Jeong, Sang-Seom;Song, Jin-Young;Min, Hye-Sun;Lee, Sung-June
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6C
    • /
    • pp.231-239
    • /
    • 2010
  • This paper presents the thermal conduction analysis (using ABAQUS ver 6.10 and FLUENT ver 6.3.26) of geothermal energy for PHC, steel and copper energy piles by considering subsurface environment, thermal efficiency of grouting materials, and fluid velocity of circulating fluid. Results show that higher thermal efficiency for copper pile is observed followed by steel and PHC piles depending on the grouting materials and subsurface condition. The fluid velocity of 0.6m/s presents most efficient outflow temperature (275.4K) and heat exchange rate (103.1W/m) for the case of PHC pile during 8 hours operation. Analysis of operation schedule concludes that 16 hours of stand-by allows charging geothermal energy following 8 hours operation in winter season is most appropriate with 0.1K of temperature difference from the steady-state condition.

Development and Application of Subway's Operating Cost Functions with Full Allocation Method (For Seoul, Incheon, Busan and Daegu) (완전배정방법을 이용한 도시철도 운행비용 모형의 정립과 적용 (서울, 인천, 부산, 대구지하철을 중심으로))

  • Song, Sun-Ah;Suh, Sun-Duck
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.7 s.78
    • /
    • pp.41-48
    • /
    • 2004
  • We may consider the inducement of demand to public transportation as a solution to relieve traffic congestion and pollution. Subway has merits as moving on schedule, transporting more people than bus. But subway is required a vast investment in the early stage of construction has a huge debt. So it runs into red figures, and on this account, services of subway are falling more and more. Development of subway's operation cost function is useful to understand structure of subway's operation and catch the relations of operation cost and actual results. In addition, we can present the policy that is a helpful to the operation as development of operation cost function. But there are short of studies about operation cost deal with a subway comparison with local train. Because local train has many lines and data, on the other hand, subway has one to four lines and less data. Most of previous studies sought the operation cost function of Seoul. So this study aimed to develop and apply the operation cost function of Seoul, Incheon, Busan and Daegu area using full allocation method. In this study, we considered the number of passengers, track-km, train-km, revenue as actual results. By appling the operation cost function, we compared the average cost of each city and confirmed the existence of economies of scale about the number of passengers, train-km.

A Basic Study on the Fundamental Issues about the Housewife Education from the Experts' and the Managers' Pespective (주부교육 활성화를 위한 기초연구 - 전문가, 운영자 및 실무자의 의견을 토대로-)

  • 이기영;김선미;송혜림;이승미
    • Journal of Families and Better Life
    • /
    • v.21 no.4
    • /
    • pp.23-39
    • /
    • 2003
  • The 18 housewife education experts and managers suggested various elements about the fundamental issues about the housewife education through the open-end questionnaire. In this review we first examine the education's proper direction over the three dimensions of housewife herself, family and society. In the second section, we explore the contents and the specific programs of the education. In the third section, we discuss about the various aspects of program development and operation, for example, the time schedule, program operator or lecturer, and curriculum design. In particular, all the experts and managers emphasizes the needs of housewives and tole of reproduced lecturer. In the last section, we revisit the strategies to vitalize the housewife education. They stressed the proper subjects, the encouraging methods to improve the participation rate and the government support.

Knowledge-based Decision Support System for Process Planning in the Electric Motor Manufacturing (전동기 제조업의 지식기반 공정계획 지원시스템에 관한 연구)

  • Song, Jung-Su;Kim, Jae-Gyun;Lee, Jae-Man
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.159-176
    • /
    • 1998
  • In the motor manufacturing system with the properties of short delivery and order based production, the process plan is performed individually for each order by the expert of process plan after the completion of the detail design process to satisfy the specification to be required by customer. Also it is hard to establish the standard process plan in reality because part routings and operation times are varied for each order. Hence, the production planner has the problem that is hard to establish the production schedule releasing the job to the factory because there occurs the big difference between the real time to be completed the process plan and the time to be required by the production planner. In this paper, we study the decision supporting system for the process plan based on knowledge base concept. First, we represent the knowledge of process planner as a database model through the modified POI-Feature graph. Then we design and implement the decision supporting system imbedded in the heuristic algorithm in the client/server environment using the ORACLE relational database management system.

  • PDF