An Experimental Study on the Stability of IER according to the Head Connection Method (지주식흙막이의 두부 연결 방법에 따른 안정성에 관한 실험적 연구)

  • Yoo, Jae-Won;Im, Jong-Chul;Seo, Min-Su;Kim, Chang-Young
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.12
    • /
    • pp.45-57
    • /
    • 2016
  • The Inclined Earth Retaining Structure (IER) is the structure using an integrated system of both front supports and inclined back supports to increase the stability for excavation. The IER is a structurally stable temporary excavation method using the back supports restraining the lateral displacement of the front supports as stabilizing piles. The back supports connected to the front supports significantly reduce the earth pressure acting on both the front wall and the front supports by distributing it to the back supports in order to increase the structural stability. In this study, mechanical behaviors of IER according to the head connection type using fixed- or hinge-connection were found by performing numerical analysis and laboratory model tests in the sandy ground. The maximum lateral displacement of fixed-connection was 88% of that of hinge-connection in the numerical analysis. The lateral displacement of fixed-connection was 7% of that of hinge-connection in the laboratory model test results. Furthermore, the earth pressure of the fixed-connection was 67% of that of the hinge-connection in the shear-strain analysis results of the model ground.

Development and Performance Evaluation of Rotational Strut Segment for Releasing Stress when uninstalled (버팀보 해체시 안전성 확보를 위한 응력 해제용 굴절지지대 개발 및 성능 평가)

  • Park, Cheol-Yong;Ku, Il-Keun;Kim, Hyun-Sook;Yang, Jee-Youn;Kim, Hyung-Oh
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.109-110
    • /
    • 2018
  • Preloading Strut applied during installation of the wall jack, but additionally serves to minimize the displacement of soil pressure acting upon dissolution due to the difficulty. In this study, we developed an index of support for the release of stress to facilitate the dismantling of the strut uninstall. The refractive support the axial force acting on the strut are supportable, is refracted at minimum load, disassembly should be easy. In order to find the optimal shape and structural stability of the refractive support We have performed the numerical analysis and performance test to determine the final model. We carried out model tests and UTM test in order to understand the refractive performance and durability of the refractive support for optimal model. Results of the test UTM is refracted all shot 5 times within a target hit number, it was found that there is no problem of the refractive performance. Further, the results of model experiments, it was found that to ensure sufficient durability more than the performance target value of the pin joint support structure.

  • PDF

Evaluation of Flexural Behavior of Hollow Prestressed Concrete Pile for Continuous Pile Wall (주열식 벽체용 중공 프리스트레스트 콘크리트 파일의 휨거동 평가)

  • Lee, Young-Geun;Jang, Min-Jun;Yoon, Soon-Jong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.3
    • /
    • pp.20-27
    • /
    • 2014
  • In the construction site, various earth retaining systems are developed and applied to maintain stability of excavated area and structures. Among the methods, the underground continuous wall and the column-type diaphragm wall methods are especially used in construction site nearby buildings or roads. However, these methods have some disadvantages such as the difficulty of quality control and long curing time because these methods need to cast fresh concrete at the construction site. In addition, these methods are usually applied to the site for the temporary purpose. In this paper, we suggest precast hollow prestressed concrete pile for continuous pile wall system. To investigate the structural behavior of suggested pile, which is the main member of the suggested system, tests pertaining to the structural behavior and prestressing force applied in the pile are conducted. From the test results, it was found that the prestressing force measured is sufficient compared with the value obtained by the design equation and the cracking moment measured is 34% higher than the design value. In addition to the above, this precast hollow prestressed concrete pile has an additional safety margin that the maximum moment is 59.2% higher than the cracking moment which is one of the serviceability limits for the design of the system.

A Case Study on the Top-Down Methods Performed in the Excavation Works of Domestic Downtown (국내 도심지 굴착공사에 적용된 Top-Down 공법의 시공사례 연구)

  • Chung, Jeeseung;Park, Sukk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.2
    • /
    • pp.5-19
    • /
    • 2017
  • Underground excavation for building construction in Korea is changing from conventional support method (Strut, Ground anchor) to inside permanent support method by stability, economic, circumstances around excavation and etc. This study was selected the sites of Top-down, New Top-down, S.P.S, S.T.D and B.R.D in general use. This study was compared and analyzed a construction cost and period between aforementioned methods and conventional support method. Also, this study was confirmed the stability of temporary retaining wall by analysis for measurement data under construction. As a result, this study can grasp that most improved permanent support method is excellent in economic and constructability than conventional support method in case of deep excavation and rapid appearance of bedrock.

Characteristics for Horizontal Displacement of Temporary Earth Retaining Wall on Marine Sediments (해성퇴적층 지반의 가시설토류벽 수평변위 특성에 관한 연구)

  • Kim, Younghun;Kim, Chanki;Choi, Sungyeol;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.11
    • /
    • pp.37-45
    • /
    • 2010
  • In this study, the value of numerical analysis was compared to the measured value of horizontal displacement during construction. And also, the value was reviewed by comparing with numbers calculated by SUNEX program and EXCAV program. When comparing to suggested values of the maximum horizontal displacement in clayey layer, the displacement caused by the IPS system is larger than one by the Strut girder type system. When comparing the result of SUNEX program to that of EXCAV program, the SUNEX program interprets larger value. It could be concluded the result of SUNEX program is closer to the suggested value, 0.5%H, in clayey layer. The result also shows that the internal friction angle(${\Phi}$) is the key factor of developing horizontal displacement rather than type of supporting systems or materials. That means small horizontal displacement occurs in sandy layer having large value of the internal friction angle, whereas vice versa in clayey layer having small value of the internal friction angle. Therefore, the result of EXCAV program is larger in sandy layer and vice versa in clayey layer. When comparing the measured result during construction to the value of 0.5%H, the measured result is 1.4 times greater than the value of 0.5%H. In contrast, the result of SUNEX program is only 78.1% of the value of 0.5%H and the one of EXCAV program is just 18.1% of that. This result shows the calculated value by SUNEX or EXCAV program is smaller than the observed value by measuring during construction. In result, more careful attention is needed to determine the behavior of the ground. To better analyze the behavior of the ground, more precise finite element method is required.

The Numerical Analysis on the Behaviour of Combined Sheet Pile in the Reclaimed Ground Mixed by Sandy Soil and Clayey Soil (사질토와 점성토가 혼재하는 해안 매립지반에서 조합형 Sheet Pile의 거동에 관한 해석적 연구)

  • Kim, Byung-Il;Kim, Young-Sun;Han, Sang-Jae;Park, Eon-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.3
    • /
    • pp.9-21
    • /
    • 2020
  • In this study, the design method of the combined sheet pile was considered in the coastal landfill where sandy and clayey soils are mixed, and the behavior in excavation was analyzed. It was confirmed from the elasto-plastic analysis that the predicted behavior of the temporary facilities of earth retaining differs according to the type of the combined sheet pile method (Built up, Interlocking, Welding) and the analysis method (soldier pile method, continuous wall method). In the case of sheet pile member force, the results of the continuous wall analysis method predicted the most conservative results. When the stress ratio (calculation/allowance) of each member was analyzed based on the maximum member force of the combined sheet pile method, the maximum value was obtained for bending moment in the side pile and combined stress in the case of the strut. As a result of finite element analysis, the member force of the side pile was the largest in the short-term effective stress analysis condition, while the compressive force of the strut was large in the consolidation analysis. When comparing the results of the elasto-plastic analysis and the finite element analysis, the shear force of the side pile and the axial force of the strut were greatly evaluated in the elasto-plastic analysis, and the bending moment of the side pile was the largest in the short-term effective stress condition of the finite element analysis. In addition, the displacement of the side pile was predicted to be greater in the finite element analysis than in the elasto-plastic analysis.