• Title/Summary/Keyword: temporary protection facility

Search Result 8, Processing Time 0.033 seconds

A Study on the Efficiency of Children's Shelter in Korea using DEA Analysis Method

  • Jeong, Seong-Bae;Joo, Mi-yeon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.6
    • /
    • pp.207-217
    • /
    • 2020
  • The purpose of this study is to analyze the efficiency of Korean child welfare facilities using the DEA analysis method and to present policies. The input variables for the analysis of this data were the number of employees, the number of facilities, and the number of gardens, and the output variables were the current sources. The results of the study are as follows. As a result of CCR analysis, inefficient facilities were found to be temporary protection facilities and comprehensive facilities. As a result of BCC analysis, inefficient facilities were identified as temporary protection facilities. As a result of SE analysis, inefficient facilities were found to be temporary protection facilities. The suggestion is as follows. First, adjustment of the capacity of temporary protection facilities is required. Second, it is necessary to strengthen the professionalism of workers in child welfare facilities. Third, strengthen the expertise of the child welfare facility manager.

A Study on the Correction of Protection Relay of Temporary Electric Power Installations for Storage Tank (저장 탱크용 임시전력설비의 보호계전기 정정에 관한 연구)

  • Son, Seok-Geum
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.13 no.6
    • /
    • pp.562-567
    • /
    • 2020
  • In this paper, this is a study on the correction of protection relays to monitor temporary power facilities for storage tanks especially transformers to block and protect faults such as insulation breakdown. When an abnormality such as a short circuit or a ground fault occurs in the power system, it is important to detect this quickly cut off the device and equipment in which the fault occurred and separate it from the power system to correct the protection relay so that it does not interfere with power supply. In addition the fault current calculation that accurately applies the fault type and the cause of the fault for protection cooperation will be the most important factor in the correction of the protection relay. For protection coordination a study was conducted on the method of coordination for protection of power facility protection for storage tanks such as over current relay, ground over current relay, under voltage relay, and ground over voltage relay applied to temporary.

A Study on The Evaluation Criteria of Carbon Emission and the Development of the Evaluation Method in Apartment House (공동주택을 대상으로 한 탄소배출 평가기준 구축 및 평가방법 개발)

  • Choi, Doo-Sung;Chun, Hung-Chan
    • KIEAE Journal
    • /
    • v.13 no.5
    • /
    • pp.79-88
    • /
    • 2013
  • This study creates the evaluation criteria to analyze the $CO_2$ emission quantity in the complex of apartment house among domestic buildings and proposes how to calculate the $CO_2$ emission quantity by the only simple information of apartment house. The study shows that in order to create the index of carbon emission evaluation criteria, $CO_2$ emission quantity for its input materials in these 27 apartment houses are 445,412g-$CO_2/m^2$ for apartment building, 474,322g-$CO_2/m^2$ for the basement parking lot, 483,523g-$CO_2/m^2$ for welfare facility, 729,957g-$CO_2/m^2$ for sales facility, 743,560g-$CO_2/m^2$ for other facility, 26,782g-$CO_2/m^2$ for public facility, 43,659g-$CO_2/m^2$ for landscape, 1,113g-$CO_2/m^2$ for indoor facility, 11,251g-$CO_2/m^2$ for outdoor facility and 891g-$CO_2/m^2$ for common temporary based on the average $CO_2$ emission by facility. We can also see the analysis data that in case of using the selected factors only, the rate of error is 7.51% comparing with the emission quantity by using simplified LCA method this study suggests for the whole range of apartment houses and the rate of error is average 3.24% using selective and main materials. And this it is evaluated that we can get the result which is similar to the actual $CO_2$ emission quantity with only the simple information about the apartment house.

A Study on the Reorganization of the National Critical Facilities Protection Personnel System in Accordance with the Changes in the Government Policy of the Temporary Position into Permanent Position (비정규직의 정규직화 정책기조 변화에 따른국가중요시설 방호인력체계 개편 방안)

  • Shin, Hyeong-Seok
    • Korean Security Journal
    • /
    • no.57
    • /
    • pp.9-26
    • /
    • 2018
  • In order to reflect the Changes in this government's policy of making Temporary Position employees into the Public sector permanent, special security guards from Private Security firms in the National Critical Facilities protection Position are moving forward transformation to Permanent Position. Especially, the organization of the protection personnel of the National Government Buildings designated as the National Critical Facilities is comprised of various types of security personnels, protective officer, special security guards from Private Security firms, Private police guards, police officers and these types of security personnels protect for the Government Buildings. Recently, The Government Security planning division is discussing various types of transformation, Special Security guards are employed directly by the Government in order to convert them into Permanent position, Special Security guards are employed directly through a establishment of Public Security corporation, protective officers are hired by the Government, Self-guards are hired directly by the Government, Private police guards are employed directly by the Government. In order to reflect the Changes the Government policy of making Temporary position employees into the Permanent, the Special Security Guards from Private Security Firms in the National Critical Facility's protection environment, protective personnels operation characteristic under various circumstances. Especially, in the process of making Special Security Guards to Permanent position, it is necessary to take precedence over the various opinions of Special Security Guards and stakeholder.

Preprocessing-based speed profile calculation algorithm for radio-based train control (무선통신기반 열차간격제어를 위한 전처리 기반 속도프로파일 계산 알고리즘)

  • Oh, Sehchan;Kim, Kyunghee;Kim, Minsoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6274-6281
    • /
    • 2015
  • Radio-based train control system has driving headway shortening effect by real-time train interval control using two-way radio communication between onboard and wayside systems, and reduces facility investment because it does not require any track-circuit. Automatic train protection(ATP), the most significant part of the radio-based train control system, makes sure a safe distance between preceding and following trains, based on real-time train location tracing. In this paper, we propose the overall ATP train interval control algorithm to control the safe interval between trains, and preprocessing-based speed profile calculation algorithm to improve the processing speed of the ATP. The proposed speed profile calculation algorithm calculates the permanent speed limit for track and train in advance and uses as the most restrictive speed profile. If the temporary speed limit is generated for a particular track section, it reflects the temporary speed limit to pre-calculated speed profile and improves calculation performance by updating the speed profile for the corresponding track section. To evaluate the performance of the proposed speed profile calculation algorithm, we analyze the proposed algorithm with O-notation and we can find that it is possible to improve the time complexity than the existing one. To verify the proposed ATP train interval control algorithm, we build the train interval control simulator. The experimental results show the safe train interval control is carried out in a variety of operating conditions.

A Study on the Fire Simulation for Vertical Fire Diffusion Analysis of Jecheon Sports Center (제천스포츠센터의 수직 화재확산 해석을 위한 화재시뮬레이션 분석에 관한 연구)

  • Choi, Yun-Ju;Kim, Yun-Seong;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.79-80
    • /
    • 2022
  • In December 2017, a fire at the Jecheon Sports Center caused 29 deaths and 40 injuries, and about 2 billion won in property damage. It is a facility used by unspecified people as a publicly used establishment with a piloti structure. The damage was expanded due to the ignition of combustible exterior materials, Lack of fire protection in horizontal and vertical penetrations. Although legislation has improved since the fire, it is not retroactively applied, increasing the risk of fire in existing buildings. Accordingly, it is necessary to examine the case of the Jecheon Sports Center fire and draw out the problems. In this study, the fire simulation results and the Jecheon Sports Center fire are comparatively analyzed and used as basic data for fire reduction measures in publicly used establishment. As a result of the fire simulation drive, in the case of the second floor, the room temperature exceeded the human life safety standard of 60 ℃ after about 700 seconds had passed. In the case of three floor, it is predicted that the indoor temperature will exceed about 350 ℃. and temporary complexation will occur in the indoor combustibles.

  • PDF

Technology Trends in Spent Nuclear Fuel Cask and Dry Storage (사용후핵연료 운반용기 및 건식저장 기술 동향)

  • Shin, Jung Cheol;Yang, Jong Dae;Sung, Un Hak;Ryu, Sung Woo;Park, Yeong Woo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.16 no.1
    • /
    • pp.110-116
    • /
    • 2020
  • As the management plan for domestic spent nuclear fuel is delayed, the storage of the operating nuclear power plant is approaching saturation, and the Kori 1 Unit that has reached its end of operation life is preparing for the dismantling plan. The first stage of dismantling is the transfer of spent nuclear fuel stored in storage at plants. The spent fuel management process leads to temporary storage, interim storage, reprocessing and permanent disposal. In this paper, the technical issues to be considered when transporting spent fuel in this process are summarized. The spent fuels are treated as high-level radioactive waste and strictly managed according to international regulations. A series of integrity tests are performed to demonstrate that spent fuel can be safely stored for decades in a dry environment before being transferred to an intermediate storage facility. The safety of spent fuel transport container must be demonstrated under normal transport conditions and virtual accident conditions. IAEA international standards are commonly applied to the design of transport containers, licensing regulations and transport regulations worldwide. In addition, each country operates a physical protection system to reduce and respond to the threat of radioactive terrorism.

A Study on the Wall and Reservoir at the Valley Part of Stone Fortress - Focused on the Fortress of $Geoyeol-seong$ and $Seongsan-seong$ - (석축 산성의 계곡부 체성과 못(池)에 관한 연구 - 거창 거열성과 함안 성산산성을 중심으로 -)

  • Kwon, Soon-Kang;Lee, Ho-Yeol;Park, Un-Jung
    • Journal of architectural history
    • /
    • v.20 no.3
    • /
    • pp.7-22
    • /
    • 2011
  • With the accumulations of outcomes from archaeological excavations of mountain fortress of three kingdoms period, there have been studies about time-periodic territory range of mountain fortress, difference in the way(method) of construction, defence system and so on from various points of view. This is an empirical study on the construction method of the valley part of stone fortress. First of all, it is required to secure large quantity of fresh water for those who lived at mountain fortress. Especially when builders of fortress construct a fortification at the valley part of stone fortress, in advance they must sufficiently consider several options including the establishment of sustainable water resources. First, when it comes to build a fortification on a ridge[or a slope] of a mountain, you have only to consider a vertical stress. However, when it comes to build a fortification at the valley part of a mountain, You must have more sufficient preparations for the constructing process. Because there are not only a vertical stress but also a horizontal pressure simultaneously. Second, a fortification of mountain fortress built by using unit building stone is a structure of masonry construction like brick construction, and the valley part of it is where the construction of the fortification begins. Third, when it comes to build a fortification at the valley part of a mountain, it seems that they use a temporary method such as coffer dam in oder to prevent the collapse of the fortification due to heavy rain. Furthermore, in response to a horizontal pressure a fortification is built by the way of its plane make an arch, or by piling up the soil with the plate method(類似版築) and earthen wall harder method(敷葉) they increase cross-sectional area of the fortification and its cutoff capacity. In front direction they put the reservoir facility for the fear that the hydraulic pressure and earth pressure are directly transmitted to the fortification. The process of constructing the fortification at the valley part of a mountain is done in the same oder as follows; leveling of ground(整地) ${\Rightarrow}$ construction of coffer dam ${\Rightarrow}$ construction of the fortification between the both banks of the valley ${\Rightarrow}$ construction of the fortification at bottom part of spill way(餘水路) between the both banks of the valley ${\Rightarrow}$ construction of spill way(餘水路) & reservoir facility ${\Rightarrow}$ construction of the fortification at upper part of spill way between the both banks of the valley. Coffer dam facility seems to be not only the protection device on occasion of flood but also an important criterion to measure the proper height of spill way or tailrace(放水路). This study has a meaningful significance in that it empirically examines the method of reduction of the horizontal pressure which the fortification at the valley part of a mountain takes, the date the construction was done, and wether the changes in climate such as heavy rainfall influence the process of construction.