• Title/Summary/Keyword: temporary construction

Search Result 498, Processing Time 0.02 seconds

A Development of the Construction Manual for the Prefabricated Temporary Housing in Subway Stations (지하철역의 조립식 임시주거 시공 매뉴얼 개발 연구)

  • Kim, Eun Young;Jang, Soon Gak;Hwang, Eun Kyoung
    • Journal of the Korean housing association
    • /
    • v.26 no.5
    • /
    • pp.45-52
    • /
    • 2015
  • Following natural disasters, there is a need to develop temporary housing through the rapid installation of mass-produced prefabricated housing. This study has developed a model construction manual for prefabricated temporary housing installable in underground spaces. First, the temporary housing prototype was drawn based on opinion poll results from earlier studies. $4.32m^2$ was calculated as the basic unit of the temporary housing living space for one person. Units included panel type, box type and mixed-type, for a variety of field conditions and scales. In order to enable space expansion and movement desirable to the user, the prototype was combination of panel and box types. The drawn prototype was utilized as the basic design template for producing prototypes and for the manual. Second, the possibility of utilizing subway stations as temporary housing was verified through the production of the prototype, and the construction process was summarized in the manual. The manual was developed in the form of a checklist to provide a guideline for users to build with prefab materials.

Case Study for the Stability of Temporary Shoring Facilities at Inchon International Airport (가시설 안정성 검토에 관한 인천국제공항 시공 사례 연구)

  • 최인걸;조현모;류승철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.97-104
    • /
    • 1999
  • This case study has been prepared to provide the practical data about construction of temporary shoring facilities (i.e. braced sheet pile excavation) and to utilize the case study information effectively for design and construction of future facilities. This case study includes information such as 1) installing measurement devices to monitor the deformation of the sheet pile walls and the subsoil in the vicinity after establishing the criteria for the sheet pile deflection; 2) monitoring the actual movement of the temporary facility after setting up the survey control standard (due to the movement of the temporary facility) : 3) inspecting the suitability of the temporary facility construction: and 4) analyzing and studying the result of the tension test after installing ground anchors.

  • PDF

A Study on Application of Construction Temporary System to Recover from Disaster on Heavy Snow (폭설재난에 대한 건설가설복구지원체계 활용방안 검토)

  • Kim, Min-Jeong;Park, Jun-Mo;Kim, Ok-Kyue;Choi, Byung-Ju;Kang, You-Mi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.59-60
    • /
    • 2011
  • In the 21th century, there ate problems of the environment caused by industrialization. for several years, the world has suffered great losses because of unforeseen weather phenomena. to make a system is needed about natural disaster especially to restore disaster on heavy snow, a role of construction temporary system is important. it needs to be construction temporary system to recover through analysing cases of disaster on heavy rain.

  • PDF

Development of Individual Temporary Equipment Material/Quality/Delivery Management Standards(Guide) for Temporary Equipment Rental Company (가설기자재 임대업체를 위한 개별 가설기자재 자재/품질/납품관리 기준(Guide) 개발)

  • Lee, Junho;Kim, Junsang;Yoou, Geonhee;Cho, Sehyun;Kim, JungYeol;Kim, Youngsuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.62-72
    • /
    • 2024
  • Due to the distribution structure of domestic temporary equipment, quality control of temporary equipment is essential because more than 80% of temporary equipment is repeated and reused. Due to this importance, the Ministry of Land, Infrastructure and Transport has proposed quality management standards for temporary equipment for 10types of temporary equipments, including steel pipe support, but the overall quality of temporary eqipment cannot be confirmed because the quality is managed through sampling quality tests. In addition, although quality control standards exist for temporary material rental company, practical utilization was investigated and analyzed to be very low as they are mainly presented based on qualitative inspection standards by visual inspection. Therefore, the purpose of this study is to develop individual temporary material/quality/delivery management standards (Guides) for temporary equipment rental company to preemptively secure the quality of temporary equipment before bringing them into the construction site. If the standards developed through this study are applied to domestic temporary equipment rental companies, it is expected that high-quality temporary equipment with secured quality will be brought into the construction site as the quality of temporary equipment quality of domestic medium and small temporary equipment rental companies is improved safety accidents related to temporary structures.

APPLICATION OF USN TECHNOLOGY FOR MONITORING EARTH RETAINING WALL

  • Sungwoo Moon;Eungi Choi;Injoon Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.517-520
    • /
    • 2013
  • In construction operation, the temporary structure is used to support designed facilities or to provide work spaces for construction activities. Since the structure is used only during the construction operation, the operation may be given insufficient attention. The contractor is likely to try to save cost on the material and labor cost. This contractor's behavior frequently leads to construction accidents. In order to prevent accidents from the failure, the operation should be carefully monitored for identifying the effect of dynamics in the surrounding site area. Otherwise, any unexpected adversary effect could result in a very costly construction failure. This study presents the feasibility of the ubiquitous sensor network (USN) technology in collecting construction data during the construction operation of earth retaining walls. The study is based on the result at the Construction System Integration Laboratory (CSIL) at the Pusan National University. A USN-based system has been developed for monitoring the behavior of the temporary structure of earth retaining walls. The data collected from the sensors were used to understand the behavior of the temporary structure. The result of this study will be used in increasing the safety during the construction operation of retaining walls.

  • PDF

A Study on the Safety Improvement Plan in Temporary Work (건축가설공사의 재해 개선방안)

  • Yoo, In-Geun;Choi, Sang-Chun;Cho, Taek-Hee;Kim, Chun-Hag
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.328-335
    • /
    • 2006
  • This study aims to find the cause of temporary work accidents and suggests a improvement plan for the prevention of accidents in temporary works. For this purpose the following research methods were used: statistical analysis of construction accidents, questionnaire survey, and a case study. As conclusions, causes of temporary work accidents were showed and a improvement plan for the prevention of the accidents in temporary works was suggested for the 2 groups: (1) temporary material manufactures, lease and sales companies, (2) construction companies which use those temporary materials.

  • PDF

A Study on the Improvement Plan of Reusable Pipe Support Certification System (재사용 파이프서포트 인증제도의 개선방안 연구)

  • Moon, Seong-Oh;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.4-5
    • /
    • 2020
  • Pipe support is a representative structure that supports slab formwork, and it is a representative temporary equipment that has been systematically managed since the 1990s when the domestic temporary equipment performance test system was introduced. Nevertheless, it is also a reality that many of the products in circulation are used products that are reused and do not meet the performance of the initial manufacturing stage. However, if only new products are insisted, it could lead to delays in the process due to an increase in construction costs and difficulties in timely delivery. On the contrary, it is not acceptable for the safety of the construction site to use products of low quality without verification procedures or standards. Therefore, this study attempts to grasp the management system such as safety certification for temporary equipment and the actual condition of quality control to maintain performance, and propose improvement plans.

  • PDF

Accident Prevention and System Improvement Strategies for small and medium-sized construction sites (중소규모 건설현장 재해원인 분석 및 제도적 개선방안)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.59-64
    • /
    • 2009
  • This study is to analyse the causes of accident in small and medium-sized construction sites and to provide prevention strategies and system improvement guidance. Although occupational safety and health act regulates the standards and installations of temporary structures, about an half of construction accidents were caused by poor temporary structures such as guardrails, scaffolds, work platforms, etc. It investigated 51 construction sites which is located in metropolitan area by asking a series of questions including their knowledge about regulations and opinions about prevention strategies. The result shows that many of the respondents do not have sufficient understandings about the regulations, and it implies that education and training must be reinforced in order to enhance the safety-awareness and to develop the comprehension of regulations.

Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support - (조립 가설기자재 품질평가 및 관리 시스템 개발 - 강관 비계, 시스템 비계, 시스템 동바리를 중심으로 -)

  • Jang, Ji young;Lee, Ji yeon;Kim, Ha yoon;Lee, Jun ho;Kim, Jun-Sang;Kim, Jung-Yeol;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.43-55
    • /
    • 2022
  • Since assembled temporary equipment is widely used for construction work that should be carried out before this construction begins, it is essential to secure quality during assembly and prevent safety accidents caused by assembled temporary equipment after installation. However, it was investigated that most construction site managers are not aware of its importance, such as recognizing the quality management of assembled temporary equipment as a task of managing temporary structures that are dismantled after installation for this construction. The quality management work of assembled temporary equipment at the construction site is carried out in different ways for each construction site because there is no formalized procedure and the subject of performing. In addition, it is analyzed that the manager of the general construction company inspects and reflects the parts that need to be inspected without evidence, so transparency is not guaranteed and the result leads to a serious disaster. Therefore, the purpose of this study is to establish a document preparation-oriented system that provides systematic quality evaluation and management procedures for securing the quality of assembled temporary equipment, develops a checklist for quality evaluation and management, and supports history management on the web.

Factors of Selecting Temporary Road Positions for the Optimal Path of Earthwork Equipment in Road Constructions (도로공사에서 토공장비 최적 이동을 위한 가설도로 위치선정 요소)

  • Lee, Dong-Jun;Kim, Sung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.85-94
    • /
    • 2022
  • Construction industry is facing difficult challenges in terms of productivity, manpower, and industrial accidents. Currently, along with the 4th Industrial Revolution, various high-tech technologies are emerging, and efforts are being made to solve the problem by applying the technologies related to the 4th Industrial Revolution to the construction industry. As part of these efforts, research is being conducted to develop a construction equipment control system to increase productivity and safety at earthworks sites where many and various types of construction equipment are involved, and the system needs a function to increase productivity by optimizing the moving path of construction equipment. In the case of trucks, the location of the temporary road must be optimized in order to optimize the path of movement in the construction site. However, only matters related to the quality standard of temporary roads have been suggested so far, and there is no standardized process for efficiently determining the location of temporary roads. In this paper, the factors and its importance related to the location of the temporary road were identified through field surveys and interviews with experts, and a method for determining the location of the temporary road was presented. It was confirmed that the suggested method through a case study could improve the productivity of earthwork.