• Title/Summary/Keyword: team projects

Search Result 384, Processing Time 0.025 seconds

Ascent - Challenges and Advances of Tall Mass Timber Construction

  • Fernandez, Alejandro;Komp, Jordan;Peronto, John
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.3
    • /
    • pp.235-244
    • /
    • 2020
  • Ascent, a 25 story residential tower located in Milwaukee, WI (USA), will become the tallest timber building in the world upon completion. This paper discusses the project's structural system, permit process, groundbreaking project specific testing, and several of the challenges the team overcame, all of which open the door to future Mass Timber projects; particularly in the United States.

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF

Conservation of Porcelain Possessed by Jeonju National Museum -Rice-bale-shaped battle white porcelain and Big jar with incised fish design buncheon ware - (국립전주박물관 소장 도자기의 보존 -백자장군과 분청사기조화어문큰항아리-)

  • Lee, Haesoon;Yun, Eunyeong
    • Conservation Science in Museum
    • /
    • v.8
    • /
    • pp.31-40
    • /
    • 2007
  • As part of supporting projects, the conservation science team of National Museum of Korea has treated 12 items of the porcelains entrusted by Jeonju National Museum for conservation. This paper is about the porcelains called the rice-bale-shaped battle white porcelain (No. Junju 97) and the big jar with incised fish design buncheon ware (No. Junju 5630) among the 12 items of porcelains finished with treatment, and by analyzing the information collected in the process of treating the rice-bale-shaped battle white porcelain, the manufacturing method and the use of the needle was presumed. As the big jar with incised fish design buncheon ware had been damaged extensively, it was unclear whether it could be repaired or not, but now I am going to introduce how it can be repaired more efficiently.

Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project (대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 -)

  • Choi, Mi-Hee
    • Journal of Environmental Impact Assessment
    • /
    • v.11 no.2
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

A Study on the Introduction of Home-Based Physical Therapy for Patients with Cerebrovascular Disease

  • Kim, Gyu-Yong;Ahn, Chang-Sik;Jeon, Hye-Won
    • The Journal of Korean Physical Therapy
    • /
    • v.27 no.2
    • /
    • pp.118-123
    • /
    • 2015
  • Purpose: This study was conducted in order to present basic policy data for introduction of a home-based physical therapy (HBPT) policy. Methods: The study surveyed physical therapists and patients for six weeks, in order to identify satisfaction with physical therapy. The statistical significance of the management plan with regard to costs and cost estimation and payment methods was determined and managed according to the operating principals of HBPT, eligibility criteria, number of visits, treatment time, and team approach. Results: Through the survey all groups of patients and physical therapists recognized the need for HBPT. They felt that the most desirable methods for activation of physical therapy visits involve precise diagnosis and evaluation through a team approach. While making regular visits to the patient three times a week, an expert visiting physical therapist with 3 to 5 years of experience in the clinical field could provide central nerve developmental treatment in less than 60 minutes; this service could be provided at a reasonable cost, minimizing unnecessary hospital visits, reducing time, medical expenses and facilitating a quick recovery due to psychological satisfaction resulting from a decrease in the psychological anxiety patients often experience in medical institutions. Conclusion: Based on the study results provided above, if HBPT is to be introduced, appropriate pricing and programs should be based on the results of pilot projects.

A Study on the Relationship between Network Characteristics of Researchers and R&D Performance in R&D Organization (R&D 조직 내 연구자 네트워크 특성과 연구성과간의 관계에 관한 연구)

  • Han, Shin Ho;Lee, Sang Kon
    • Journal of Information Technology Services
    • /
    • v.18 no.4
    • /
    • pp.83-95
    • /
    • 2019
  • It is becoming more and more difficult to cope with new knowledge and technology required by society by the efforts of one person or organization according to the development of science and technology. As a method to overcome this, collaborative research is becoming important. This tendency is increasing in the government R&D projects as well, and the 'A' test research institute, which is the subject of this paper, is also increasing a collaborative research. The purpose of this study is to analyze the network characteristics among the participating researchers in the government R&D project conducted by the institution A, and to ascertain how the network characters of the researchers actually affect the financial performance of the team. The results of the analysis show that 'closeness centrality' and 'degree of centrality' contribute positively to the financial performance of the team. On the other hand, 'betweenness centrality' and 'eigenvector centrality' have a negative effect on the financial performance of the team because they are not directly related to financial performance.

An Analysis of the Effects of Knowledge Complementarities on the Performance of Information System Audit : A Perspective of the Resident Audit in the Project Office (지식상호보완성이 정보시스템 감리 성과에 미치는 영향 : 상주감리 관점에서)

  • Jang, Ji Yeon;Kim, Choong Nyoung
    • Journal of Information Technology Services
    • /
    • v.15 no.1
    • /
    • pp.113-129
    • /
    • 2016
  • Recently, as Information System projects tend to be more complex, the importance of Information System Audit increases. In the same context, the need for the resident IS Audit also increases, which is supposed to deal with the possible risks and urgent issues by providing the appropriate support and timely coordination during IS project. Basically, for the effective IS Audit, the IS audit team members should be able to understand such a business context as work characteristics, business knowledge, goals, and culture of the organization. The audit team members should also be able to share the various knowledge of Information Technology and audit procedure with the owner of the project. Especially, for the resident audit, it is more important to fill the gaps in expertise between project owner and audit team. However, any studies on the need of common knowledge base (knowledge complementarities) in the IS audit have not been done so far. The purpose of this study is to analyze whether the knowledge complementarity based on inter-organizational communication between the project owner and audit team members makes an effect on the fidelity and performance of IS audit. In order to do this, the relationship among inter-organizational communication and knowledge complementarity, the fidelity of IS audit service, and performance of IS audit has been analyzed, using Structural Equation Model. The result shows that all the relationship is significant, which means that knowledge complementarity between the two different interest groups should be an effective factor on the fidelity and performance of IS audit. This result implies that, for better quality of IS Audit service, how to acquire the knowledge complementarity between the project owner and Audit team should be considered seriously as well as systematically in the process of IS Audit.

An Study about The Priority Risk Factors for Enhancing the success Rate of The Public Sector Information Projects (공공분야 정보화 프로젝트 성공률을 높이기 위한 위험요인 우선순위에 관한 연구)

  • Lee, Hyun-Soo;Lee, Moon-Goo;Lee, Nam-Yong
    • 전자공학회논문지 IE
    • /
    • v.48 no.4
    • /
    • pp.69-77
    • /
    • 2011
  • Recently, the public sector information projects have bebn larger in size, sophisticated, and diversified, which make the performance management model be studied continuously. According to the research and understanding on this, there are discontents resulted from poor requirements managements, schedule delays, budget overruns, failure to achieve expected goals, although there are increase the scale of projects and the number of information systems than ever before. it makes the requirement for the plan to manage significant risk factors systematically. So in this study, we will understand the risks which have been recognized by professionals and managers in public sector projects for enhancing the success rate. And the surveys will be conducted for the risk factors in each fields by gathering the opinions of the hands on workers in public sector project support team such as S company, L company. Finally, the correlation index between the risks and the other project fields would be clear by this survey.

A Study on Application and Development of Evaluation Indicator for Parking Environments in Residential Areas Using AHP (AHP분석기법을 이용한 주거지역의 주차환경 평가지표 개발 및 적용에 관한 연구)

  • WON, Donguk;KIM, Young Jun;LEE, Jinkak
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.5
    • /
    • pp.375-384
    • /
    • 2017
  • The aim of this study is to develop evaluation indicators for parking environment in residential areas. Recently, lots of local governments in korea are implementing projects for parking environment improvement. However, there are no indicators for parking environment evaluation except for the rate of parking supply by registered cars. So, it is really difficult to prioritize projects and monitor the result of projects. Therefore, this study presents six indicators for parking environment evaluation and its weights using AHP through the survey. The result of this study proposed the assessment model for parking environment based on indicators and it was found that actual data in Incheon can be simulated in reality. And this result also is expected to help monitoring and selecting projects.

Critical Factors of Subcontractor Evaluation and Selection: A Case Study in Vietnam

  • VO, Khoa Dang;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;LE, Loan Phuc;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.3
    • /
    • pp.297-305
    • /
    • 2021
  • A contractor or a main contractor is a company with full capacity to construct all project's works for the owner. A subcontractor is an organization that works with the main contractor to execute and complete work packages for the project. Selecting an effective subcontractor will help the efficiency and success of any projects in the construction industry. Therefore, this study identified subcontractor evaluation factors in Vietnam by collecting questionnaire survey data from engineers and staffs in the construction industry project environment. An exploratory factor analysis (EFA) was then performed to identify the critical factors when evaluating and selecting the subcontractor in construction projects. Moreover, when considering the impact level in terms of the average value, the research results showed that the most critical concern was the subcontractor's reputation. Furthermore, the top five factors affecting the sub-contractor evaluation and selection are (i) reputation, (ii) price, (iii) construction techniques, (iv) ability to implement projects according to commitments, and (v) subcontractor competence (the team of workers, technician staff, engineers with full capacity according to regulations). These research results provide an overall perspective that will help main contractors develop suitable subcontractors' evaluation and selection factors in their projects in the construction industry.