• 제목/요약/키워드: system development process

검색결과 8,864건 처리시간 0.032초

반도체 Package용 Seam Seal Welding System 개발 (Development of Seam Seal Welding System for Semiconductor Package)

  • 이우영;진경복;오장환;김경수
    • 반도체디스플레이기술학회지
    • /
    • 제2권2호
    • /
    • pp.21-24
    • /
    • 2003
  • Seam seal welding on the semiconductor package is a process for sealing the packages of semi-conductors, crystal parts, saw filters and oscillators with lid plate by seam welding. This paper presents the development process of automatic seam seal welding system. In this process, the process algorithm, high precision welding current control, design of welding head, high speed and high precision feeding mechanism and user interface process control program technologies are included.

  • PDF

DSM 기법에 따른 안전 관리를 통한 차상중심 열차제어시스템 개발 프로세스의 개선에 관한 연구 (On Enhancing Train-Centric Train Control System Development Process using DSM-based Safety Management)

  • 김주욱;오세찬;한석윤;김영민;심상현
    • 산업경영시스템학회지
    • /
    • 제39권3호
    • /
    • pp.129-138
    • /
    • 2016
  • The train-centric control systems development has some distinct points in that a big size of government budget is in general expended in there and the development duration seems to be long. In addition, the changes are ever made continuously in the capability and operational requirements for Trains. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks [7]. As such, proper management of project risk has been one of crucial subjects in the train systems development. All these notes combined together make it the significance of the safety management process be raised further up in the train-centric control systems development. As such, the underlying safety management process should be capable of appropriately handling the potential risks that can be created due to the unexpected changes and the long-term development period. The process should also be complemented for the safety consideration of train-centric control systems, for instance, stop. To study these aspect is the objective of the paper. To do so, a step-by-step approach to analyzing the safety management process is first presented. Then, to enhance the process some necessary and useful activities are added in terms of risk and safety management. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored using a design structure matrix method. The resultant process is applied in a train-centric control development as a case study.

Deep Drawing의 후가공 특징형상 공정설계 및 전문가시스템 개발에 관한 연구 (A Study on the Process Planning for Secondary Operations on Features of Deep Drawing Cup and the Development of the Expert System-Based CAPP)

  • 오준환;이재원;조성진;남배중;양재우
    • 한국정밀공학회지
    • /
    • 제15권11호
    • /
    • pp.46-57
    • /
    • 1998
  • Even though there are some studies on the deep drawing process and process planning, little study has been done on the methodology of process planning of secondary operations of deep drawing such as 'piercins'. In this paper, first, we systematized the methodology of the process planning of secondary operations on axisymmetric cup. Second we described the development of the expert system for their CAPP For these studies, we extracted the knowledge of their process planning from experts and analysed and systemized them. To develop the expert system, rule-based reasoning paradigm is used. The shape information of manufacturing features of secondary operations are manually input to the system through SUI. The process planning results are automatically connected to AutoCAD. We believe that the systematized process knowledge and the development of the expert system for its CAPP could give lots of aids to the associated field.

  • PDF

열처리공정의 지능형 웹 모니터링 산업용 공정제어 시스템 개발 (The Development of Industry Operation Control System using Intelligent Web Monitoring for the Heat Treatment Process)

  • 오재호;배효정;최기수;안두성
    • 동력기계공학회지
    • /
    • 제9권4호
    • /
    • pp.181-186
    • /
    • 2005
  • Because of advanced control technology, Shop floor control system of various kinds of equipment and machinery need a web based remote monitoring to control process efficiently. This paper presents the development of Operation Control System. Operation Control System(OCS) is based on intelligent web monitoring, so that OCS is improved the working condition for the line of heat treatment process and the product's quality. The developed OCS is consisted of Atmega128(MCU) based on embedded system, running the data logging of the line of heat treatment process. Web monitoring system is based on CS8900 ethernet controller and TCP/IP for remote monitoring responsibility between a server and clients and controlling the progress of entire system. The developed OCS is implemented on the line of heat treatment process and shows the improvement of environment condition, product's quality and efficiency of process line.

  • PDF

요구조건 기준의 개발 수행을 위한 우주발사체 개발사업의 실제적인 요구조건-검증 관리 체계 (Practical Requirements and Verification Management for Requirements-based Development Process in Space Launch Vehicle Development Project)

  • 조동현;장준혁;유일상
    • 시스템엔지니어링학술지
    • /
    • 제19권1호
    • /
    • pp.56-63
    • /
    • 2023
  • For the success of system development, it is necessary to systematically manage the requirements that are the basis of system development and its verification results. In order to follow the principles of SE(Systems Engineering)-based V&V(Verification&Validation) process, requirements can be managed by securing the requirements and their establishments, design compliances, and verification compliances according to the system development lifecycle. Especially, in a large-complex system research and development project, such as a space launch vehicle development project, many participants establish, verify, and validate numerous requirements together during the project. Therefore, logical and systematic requirements management, including guarantee of data integrity, change history, and traceability, is very important for multiple participants to utilize numerous requirements together without errors. This paper introduces the practical requirements and verification management for the requirements-based development process in the space launch vehicle development project.

G-code control 을 이용한 웹 기반 금형 가공 공정 모니터링 &컨트롤 시스템 개발 (Development of Web-based Mold manufacturing process monitoring & control system using G-code control)

  • 김건희;최진화;전병철;조명우
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2004년도 추계학술대회 논문집
    • /
    • pp.269-272
    • /
    • 2004
  • The target of this paper is the development of Web-based monitoring & control system which is for effective and economic management of mold manufacturing process. This system has three module; G-code Control, Monitoring Module and Result analysis module. Also, as the environment of development is based on internet, this system which is possible to the remote site management of manufacturing process works on Web. To be possible to control the manufacturing monitoring by client, each module is made ActiveX control and is based on socket communication. This system makes the foundation which is possible to manage the mold manufacturing process efficiently from remote site by matching real-time monitoring with manufacturing process in factory using G-code control and displaying the result of manufacturing using Ch-CGI.

  • PDF

항공전자 시스템 개발에 관한 연구 (A Study on the Development of an Avionics System)

  • 양성욱;이상철
    • 한국항공운항학회지
    • /
    • 제15권1호
    • /
    • pp.61-67
    • /
    • 2007
  • The importance and cost of avionics system in the integration of an aircraft is continuously increasing. And we can expect enlarged software portion in the system integration for the more intelligent, reliable, and automated avionics system. Both military and commercial avionics community have moved toward commercial-off-the-shelf(COTS) equipment and open systems architecture not only to increase affordability but also to reduce acquisition cost, shorten development time and risk. The same concept is applied in developing avionics test system used for the avionics system integration test. In this paper, we present important topics in the development of avionics system including real-time operating system, interconnect data bus, software development methodology, software development process, and system integration test.

  • PDF

″Issues in designing a Knowledge-based system to support process modeling″

  • Suh, Eui-Ho;Kim, Suyeon
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.50-54
    • /
    • 2001
  • Information systems development entails planning, analysis, design and construction phases. The analysis phase identifying user requirements is the most important of these phases. Since unidentified defects in the early phase causes increased work and costs as development proceeds, the quality of analysis results affects the quality of the resultant system. Major tasks in the analysis phase are data modeling and process modeling. Research on building a knowledge-based system for data modeling have been conducted much, however, not sufficiently for process modeling. As a system environment with high user interaction increases, research on process modeling methods and knowledge- based systems considering such environment are required. In this research, a process modeling framework for information systems with high user interaction is suggested and a knowledge-based system for supporting the suggested framework is implemented. A proposed model consists of the following tasks: event analysis, process analysis, and event/process interaction analysis. Event analysis identifies business events and their responses. Process analysis break down the processes of an enterprise into progressively increasing details. Decomposition begins at the function level and ends when the elementary process level is reached. Event/process interaction analysis verifies the results of process analysis and event analysis. A knowledge-based system for supporting a proposed process modeling framework is implemented in a web-based environment.

  • PDF

"3+3 PROCESS" FOR SAFETY CRITICAL SOFTWARE FOR I&C SYSTEM IN NUCLEAR POWER PLANTS

  • Jung, Jae-Cheon;Chang, Hoon-Sun;Kim, Hang-Bae
    • Nuclear Engineering and Technology
    • /
    • 제41권1호
    • /
    • pp.91-98
    • /
    • 2009
  • The "3+3 Process" for safety critical software for nuclear power plants' I&C (Instrumentation and Control system) has been developed in this work. The main idea of the "3+3 Process" is both to simplify the software development and safety analysis in three steps to fulfill the requirements of a software safety plan [1]. The "3-Step" software development process consists of formal modeling and simulation, automated code generation and coverage analysis between the model and the generated source codes. The "3-Step" safety analysis consists of HAZOP (hazard and operability analysis), FTA (fault tree analysis), and DV (design validation). Put together, these steps are called the "3+3 Process". This scheme of development and safety analysis minimizes the V&V work while increasing the safety and reliability of the software product. For assessment of this process, validation has been done through prototyping of the SDS (safety shut-down system) #1 for PHWR (Pressurized Heavy Water Reactor).

전산지원 시스템 엔지니어링 도구를 이용한 합동능력 통합 및 개발 환경 구축 사례 (Implementation of the joint capability integration and development environment using CASE tool)

  • 김진일;박종선
    • 시스템엔지니어링학술지
    • /
    • 제9권2호
    • /
    • pp.69-82
    • /
    • 2013
  • US DoD operated JCIDS(Joint Capability Integration and Development System) for top down requirement generation. Although the JCIDS can be a good practice for the countries which are trying to shift from bottom up to top down requirement generation, it contains many processes related with review and approval. In this study we structured a joint capability integration and development process from the JCIDS eliminating the organization dependent review or approval process so that it can be applied to any organization with some modification. Furthermore we implemented the process in the computer aided systems engineering tool, Cradle, for convenient use of the process. The result of this study can provide a basic process for top down capability development, and an efficient why of doing each element of the process using CASE tool.