• Title/Summary/Keyword: system development process

Search Result 8,864, Processing Time 0.043 seconds

Design and Verification of Mission Equipment Package System for Korean Utility Helicopter (한국형 기동헬기 임무탑재장비체계 설계 및 입증)

  • Kim, Sung-Woo;Lee, Byoung-Hwa;Yu, Yeon-Woon;Lee, Jong-Hoon;Yim, Jong-Bong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.388-396
    • /
    • 2011
  • Mission Equipment Package(MEP) system is a collection of avionic components that are integrated to perform the mission of the Korean Utility Helicopter(KUH). MEP system development is classified mission-critical embedded system but KUH MEP system developed including flight-critical data implementation. It is important to establish the good development and verification process for the successful system development. This paper describe the development and verification process in each phase for the KUH MEP system. MEP system design is verified through the qualification test, system failure test and compatibility test in System Integration Laboratory(SIL).

A DEVELOPMENT FRAMEWORK FOR SOFTWARE SECURITY IN NUCLEAR SAFETY SYSTEMS: INTEGRATING SECURE DEVELOPMENT AND SYSTEM SECURITY ACTIVITIES

  • Park, Jaekwan;Suh, Yongsuk
    • Nuclear Engineering and Technology
    • /
    • v.46 no.1
    • /
    • pp.47-54
    • /
    • 2014
  • The protection of nuclear safety software is essential in that a failure can result in significant economic loss and physical damage to the public. However, software security has often been ignored in nuclear safety software development. To enforce security considerations, nuclear regulator commission recently issued and revised the security regulations for nuclear computer-based systems. It is a great challenge for nuclear developers to comply with the security requirements. However, there is still no clear software development process regarding security activities. This paper proposes an integrated development process suitable for the secure development requirements and system security requirements described by various regulatory bodies. It provides a three-stage framework with eight security activities as the software development process. Detailed descriptions are useful for software developers and licensees to understand the regulatory requirements and to establish a detailed activity plan for software design and engineering.

Quality Management Model for Process Performance Level and Development Technology (프로세스 이행 수준과 개발 기술 품질 관리 모델)

  • Park, J.H.;Park, Y.S.;Jung, H.T.;Kim, S.H.
    • Electronics and Telecommunications Trends
    • /
    • v.32 no.6
    • /
    • pp.105-115
    • /
    • 2017
  • This paper describes a project - based quality management model that identifies development technologies and codes while at the same time verifying the ability to implement processes that are essential in R & D projects. In order to verify the process implemented in the R & D project implementation, there are review, checking points, and evaluating methods the process performance levels for five processes such as defining requirements which is the beginning stage of system development, testing process which is the completion stage of system development, and project management and peer review process for project management and support in the proposed project-based quality management model. For development technology and code validation, the model included the documented test cases for each requirement by the developer in the requirements definition stage, debugging and testing in the design and implementation stages, static analysis and open source licence verification procedure, and system environment. After applying the model in SW development R&D project for evaluating the process performance, and verifying the development technology and the code, the developers responded that the improvement in the development technique and the code, and upgrade of process performance level for project are more than 10%.

A Study on the Integration of Systems Engineering Process and Systems Safety Process in the Conceptual Design Stage to Improve Systems Safety (시스템 개념설계 단계에서 안전도 향상을 위한 시스템공학 및 시스템안전 프로세스의 통합에 관한 연구)

  • Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.1-10
    • /
    • 2012
  • Recently, we have witnessed the definitely negative impacts of large-scale accidents happened in such areas as atomic power plants and high-speed train systems, which result in increased fear for the potential danger. The problems appear to arise due to the deficiency in the design of large-scale complex systems. One of the causes can be attributed to the design process that does not fully reflect the safety requirements in the early stage of the system development because of the substantially increased complexity. In this paper, to enhance the systems safety an integrated process is studied, which considers simultaneously both the system design process and system safety process from the beginning of the system development. In the conceptual system design phase an integrated process model is constructed by analyzing the activities of both the system design and safety processes. As a case study example, an inner city train system is described with the application of the developed process. The computer simulation of the example case is followed by the result discussed. The results obtained in the paper are expected to be the basis for the future study where a detailed process and its associated activities can be developed.

A Requirements Driven System Design Process for a Small System (소규모 시스템의 요건에 의한 설계)

  • Kim, Eui-Jung;Shin, Keun-Ha;Choi, Jae-Sung
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.10
    • /
    • pp.69-75
    • /
    • 2001
  • Systems engineering has been utilized in system development primarily for large-scale projects or commercial large-scale systems during the last several decades. We can understand why it would be useful to apply systems engineering to the development of a relatively small system. However, it is difficult to effectively carry out a project due to the complexity in applying the methods of systems engineering. To apply systems engineering to the development of a small system, the system engineering processes should be tailored. We established a requirements driven system design process(RDSDP) that can effectively carry out the system design far a small system. RDSDP is a system design process that treats all the requirements thoroughly and effectively. This is applied by the designer according to a standardized and systematized process during the first phase in design, in which system specifications are made. By using RDSDP, we can affect a reduction of the number of redesign phases in the process of the system design, shorten the period for to make specification, which will then cause the system to succeed in the actual application.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

A Case Study on the Application of Configuration Management Process for the Development of High-Safety Railway Signaling System Based on International Standards (국제표준기반의 고안전성 철도신호시스템 개발을 위한 형상관리프로세스 적용사례 연구)

  • Choi, Yo Chul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.108-115
    • /
    • 2019
  • The activities of managing and controlling the configuration of a system component over its life cycle are critical tasks in developing a high safety system as well as general system development. These configuration management activities should be defined through the management plan at the beginning of the life cycle, and should be performed continuously and systematically until the end of the project after the system or product development is completed. In this study, the configuration management process applied in the development of high safety railway signaling system was introduced and an efficient application proposals of it was proposed. In particular, configuration management through the establishment of a configuration management system based on computer tools is one of the important activities of maintaining the configuration integrity of the system or product.

Automatic Train Control (ATC) System Development through Application of Reverse and Re-Systems Engineering Process (역공학 및 재공학 시스템엔지니어링 프로세스 적용을 통한 무인열차자동제어시스템 개발)

  • 이중윤;박영원
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.9 no.10
    • /
    • pp.836-843
    • /
    • 2003
  • The automatic train control (ATC) system development project for the Automated Guideway Transit (AGT) system has high technical risk because the system is unmanned train control system using wireless technology which was unprecedented in train control industry of Korea. To overcome the technical risk during concept design phase of the ATC system development project, the integrated product team(IPT) carried out a reverse and reengineering process using a systems engineering design model. The generic systems engineering process is incorporated in the both reverse and reengineering process. As a result of the systems engineering effort, the IPT has built top layer systems engineering design model of the ATC subsystem. The purpose of this paper is to deliver the reverse and reengineering process which was used to develop the systems engineering design model of ATC system using a computer aided systems engineering tool. This study also shows that the model based reverse and reengineering process can reduce the technical risk by identifying the differences of requirement, functional and physical architecture between a reference system and a target system.

A Study on the Test and Evaluation Process Development for Korea Next Generation Highspeed Electric Multiple Unit (차세대 고속열차 시험평가 프로세스에 관한 연구)

  • Lee, Tae-Hyung;Kim, Sang-Soo;Kim, Seog-Won;Kim, Ki-Hwan;Chung, Heung-Chai
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.7-11
    • /
    • 2011
  • A high-speed railway system represents a typical example of large-scale multi-disciplinary system, consisting of subsystems such as rolling-stock, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Systems engineering technology development project for Korea next generation High-speed Electric Multiple Unit (HEMU) system in progress is a national large system development project that is not only a large-size and complex but also multi-disciplinary in nature. Therefore, all stakeholders must understand and share the functional and performance requirements of HEMU throughout its life-cycle phases. Also in the test and evaluation phase, all systems requirements must be verified. In 2011, the prototype train manufacturing will be completed. It will do test run on the commercial line and all systems requirements are verified until 2012. For the system verification, the test and evaluation process have to be established before the test trial run. Using a systems engineering tool, the system design database(SDD) with requirements traceability and development process management in the course of the development have to be established. This paper represents the test and evaluation process development based on the SEMP(Systems Engineering Management Plan) developed in the design stage. The test and evaluation process is refined and updated in comparison to the design stage one. The test and evaluation process consists of procedure, test and evaluation method and schedule. So through this process, it is defined that each systems requirements is verified on which test and about what time.

A Study on Glass Processing System

  • Song, Jai-Chul
    • International journal of advanced smart convergence
    • /
    • v.4 no.2
    • /
    • pp.84-93
    • /
    • 2015
  • This study is for the development of Cover Glass Grinding Processing System. This system is developed for manufacturing a mass product system grinding cover glasses with highly precise mechanism, and we improved resulted quality. In the development process, we developed a complete process technology through mechanical design, image processing technology, spindle control, mark identification algorithm etc. With this cover glass grinding development, we could developed process technology, image processing technology, organization mechanisms and control algorithms.