• Title/Summary/Keyword: subway train

Search Result 365, Processing Time 0.027 seconds

Improving Methods of Metropolitan Railways in Gyeonggi-do - Focusing on Route, Operation and Express Service (경기도권 철도체계의 문제점과 개선방안 - 노선축, 영업, 급행화를 중심으로)

  • Han, Woo-Jin;Park, Jeong-Soo
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.968-973
    • /
    • 2006
  • Although Gyeonggi-do is the core area which has a quarter of the population of Korea, it has poor railway network and then it have got serious traffic problem. So in this paper, it is introduced the improving methods of railways on Gyeonggi-do. In first, it was showed a fast and effective railway route implementation according to the characteristics with the similar population but the 17 times bigger area than that of Seoul. And it was explained multipurpose using method of the railways of Gyeonggi-do whit subway, commuter, express and high speed train etc. Finally unlike Seoul subway focusing on approachability, it was proposed 'express train paradigm' focusing on implementing the high movability which railways of Gyeonggi-do must have. So with 'Bundang-line' metropolitan railway, the case study in applying to southern metropolitan area with those suggestion was showed.

  • PDF

Obstacle of a train crew & Vehicle Operation For Improvement Program In Seoul metro (서울메트로 승무.차량 운전장애에 대한 개선방안)

  • Lee, Tai-Sik;Park, Min-Seo;Bae, Woo-Byeng;Kim, Dong-Seok;Kim, Jun-Taek
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1168-1173
    • /
    • 2007
  • The Seoul Subway is one of the most heavily used Subway System in the world. It provides reliable transportation services, conveys nearly 4 million Passengers across 117 subway stations with a length of 134.9 Km. Over the years the safety for the Subway has been a major concern, trains going off the track, equipment failure, careless operation, Signal failure are increasing day by day. In a Recent Public opinion 40% said the causes to above facts are Vehicle breakdown because of Operators, Old rail defect, Quality of material. 20% of the opinion said the obstacles were because of Operation, crew carelessness, negligence in signal operation. In case of any accident the crew members cannot resolve the issue on site (Aid insufficiency), because of lack of knowledge and carelessness. The main obstacles for Subway are vehicle breakdown, Electric equipment failure, Signal Equipment failure, and Crew carelessness. This paper aims to provide major problems which are needed to be solved as quickly as possible for citizen's safety for a comfortable subway system making a comfortable ride and providing better service gradually.

  • PDF

Introduction of Intelligent fire-disaster Surveillance System for Subway Station (도시철도 역사 지능형 화재감시시스템 구축방안 연구)

  • Shin, Jeong-Ryol;An, Tae-Ki;Jeon, Bo-Ik;Kim, Gab-Young;Kim, Hyung-Min;Yun, Byeong-Ju
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.457-465
    • /
    • 2009
  • Subway system including light-rail transit system is the representative public urban transportation. Accordingly, Nothing is more important than the safety operation as well as passengers' convenience. Due to the fire disaster of Daegu subway on 2003, more strict regulations of detecting fire and of conducting on emergency circumstances. However, regardless of this improved management, it was reported that installations of lots of fire-detection facilities may be harm than good to operate subway system due to frequent malfunction of some fire-detection facilities. It may cause mis-alarm for fire and induces abnormal operation of subway due to the strict regulation; the train shall be stopped on emergency circumstances. Therefore, in this paper, new scheme on surveiling breaking-out-of fire in the station is suggested with new IT technologies, Wireless Sensor Network(WSN) and CCTVs. which were integrated with an intelligent software. This intelligent system enables to surveil breaking-out-of fire in real time through sensor network technology and watch the emergency site on CCTV as well. Through this system, subway organizers could cope with the emergency circumstance rapidly as well as judge precisely whether fire breaks out or not.

  • PDF

A Study on the Analysis of Subway Crowdedness using Simulator (시뮬레이터를 이용한 지하철 혼잡도 분석에 관한 연구)

  • Lee, Doo-Yong;Li, Zhong-Sh;Kim, Dong-Hee;Hong, Soon-Heum;Lee, Chang-Cho
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.4
    • /
    • pp.267-273
    • /
    • 2008
  • Many people transfer from the automobile to the subway because of increasing in oil price and improvement of mass transit system of Seoul Metropolitan City. But Seoul Metropolitan Subway have brought out passengers discomfort because it is more crowded over the appropriateness because of very high utilization though it is highly technically facilitated. This study deals with the development and simulation study of subway train simulator. We performed the validity simulation study for the simulator for the interval from Sindorim station to Samsung station in Seoul Subway Line 2. We analyzed the simulation results considering crowdedness after we defined the concept of crowdedness. Also we accomplished the analysis of simulation results after simulation under the assumption that the crowdedness is alleviated by controlling the passengers using RFID technology.

A Study on Performance Evaluation of On-board Electric Device of TTX(Tilting Train Express) (틸팅열차(TTX)의 정장품 성능평가 연구)

  • Han, Seong-Ho;Lee, Su-Gil;Seo, Sung-Il
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 2005.11a
    • /
    • pp.239-242
    • /
    • 2005
  • This paper introduced an approach of improvement of performance of Electric device for EMU type Train like as TTX. The electric equipments are characterized by insulation, Noise, cooling system etc. and Their weight arc decided by these factors. There are two kinds of power source in EMU train. First, DC voltage source, 1500 volt, 750 volt is used for subway system. Second, AC power source 25000 volt is applied to high speed train and existing main lines. Composite material has the protection of inrush current and high frequency noise. We can use this material to minimize weight of train. Additionally we can get energy saving when operator service TTX.

  • PDF

Case study for noise reduction of an electric train caused by Main Transformer as a noise source (주변압기를 소음원으로한 전동차 실내소음의 저감사례연구)

  • Lee K. W;Kim W. K;Baik K. S;Kim J. H
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.513-518
    • /
    • 2003
  • Noises are defined as unwanted sound and invoke the physical harm and unconvenience. The higher the noise level is, the more damage peoples have. Low frequency noise is less harmful than high frequency one. In case of train, noises inside of train which is isolated from outer circumstances reduce the convenience of passenger very much. This paper reviewed the noise standard of train for urban subway and investigated the main transformer as the main noise source of train and suggested the method to diminish the noise resulted from main transformer of train and compared the measured results of before and after the improvement of main transformer.

  • PDF

PSD Door Response Time Improving Method in Train Manual Operation Mode (수동운전방식에서의 PSD 출입문 신호반응 시간 개선 방안 연구)

  • Lee, Moo-Ho;Kim, Chan-Cum;Lee, Suk-Jong;Lee, Soo-Young
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.559-571
    • /
    • 2008
  • Platform Screen Door(PSD) has been installed and operated at seoul subway line $1\sim4$ in the manual train operation mode(ATS/ATC) by SeoulMetro since 2005. SeoulMetro uses the wireless (RF) communication system and the train door detection system for the link between the train and PSD doors opening/closing motion in the manual train operation mode. For the convenience and safety of passengers, the train doors and the PSD doors opening/closing shall be synchronized as much as possible. In ATO(Automatic Train Operation) mode which provides the interface between train control system and PSD system, ATO signaling system makes the train doors and PSD doors open/close command signals systematically, so PSD doors can be opened/closed almost simultaneously with the train doors. But, in the manual train control(ATS/ATC) mode, PSD system needs to detect the train doors open/close operation and make PSD open/close command signals to actuate PSD doors. These PSD open/close commanding process cause time delay of PSD doors opening/closing motion in response to the train doors opening/closing motion. Sometimes the response delay time can be over 1 second, which is not proper to operate PSD, and need to be reduced This paper presents the reduction method of the PSD response delay time to improve the convenience and safety of passengers.

  • PDF