• Title/Summary/Keyword: substation

검색결과 998건 처리시간 0.026초

154 kV 변전소 주변압기의 용량 및 운전조건이 22.9 kV 배전계통의 고장전류에 미치는 영향 (An Investigation on the Fault Currents in 22.9 kV Distribution System Due to the Increased Capacity and Operating Conditions of Power Transformers in 154 kV Substation)

  • 조성수;한상옥
    • 전기학회논문지P
    • /
    • 제57권3호
    • /
    • pp.302-310
    • /
    • 2008
  • In order to evaluate the nominal rating of breakers in distribution system due to the increased capacity and operating conditions of power transformers in 154 kV substation, the fault currents in distribution system were calculated by the conventional method and simulations of PSCAD/EMTDC program. Consequently, under the condition of the parallel operation of transformers, the fault currents exceed the nominal current of the breakers in some areas. Without NGR at the secondary neutral of the transformer, the current of single line-to-ground fault was bigger than that of 3-phase fault. Therefore, the results clearly show that the measures to limit the fault currents in distribution system are needed when the increased capacity of power transformers is introduced into 154 kV substation.

도시철도 변전소에 설치한 첨두부하 절감용 ESS의 경제성 분석 (Economic Assessment of ESS for Peak Load Shaving in the Substation of Urban Railway)

  • 박종영;신승권;김형철;정호성
    • 전기학회논문지
    • /
    • 제63권12호
    • /
    • pp.1752-1758
    • /
    • 2014
  • This paper evaluates economic benefits of ESS (Energy Storage System) for peak load shaving in the substation of urban railway. For this purpose, the method to determine capacities of ESS and PCS (Power Conditioning System) for peak load shaving is proposed. Then the economic benefits of those devices are evaluated using net present value method. The proposed methods are applied to actual measurements of loads in the substation of urban railway. The results show that electric power costs can be reduced and the economic benefits of ESS for peak load shaving mainly depends on the price of battery.

IEC 61850 기반의 OCR IED에 대한 적합성 시험방안 (Conformance Testing for IEC 61850 based OCR IED)

  • 위페이;임성정;최면송;이승재
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.19-20
    • /
    • 2008
  • IEC 61850 is a new approach international standard which is applicable to Substation Automation System (SAS) and defines the communication between intelligent electric devices (IEDs) in the substation and the related system requirements. It already has a significant impact on the development of different devices or systems used in substation. Conformance claims and the establishment of their validity are important parts of the acceptance of systems and equipment. This paper introduces the conformance testing, mapping of IEC 61850 services and MMS services, and in case study part it gives the example of testing OCR IED.

  • PDF

설비고장의 불확실성을 고려한 송변전계통의 공급신뢰도 특성곡선에 관한 연구 (A Study on Reliability Characteristic Curve of Transmission & Substation System considering Device Fault's Uncertainty)

  • 전동훈;김건중
    • 전기학회논문지
    • /
    • 제57권9호
    • /
    • pp.1500-1506
    • /
    • 2008
  • In this paper, we proposed new reliability characteristic curve, which-can clearly show reliability property of transmission and substation system considering uncertainty such as frequency and duration of device fault. It express the relationship of duration of load curtailments, demand not supplied, and energy not served as “ y = $ax^{-1}$ " curve. and we proposed the method, which can objectively assess reliability of transmission and substation system using proposed characteristic curve as new reliability index. In this method, we used energy index of reliability(EIR) as a criterion of assessment. Finally, we performed a variety of case study for KEPCO system in order to verify usefulness of proposed method.

직류 도시철도 변전소 수요전력 예측 (Power Demand Forecasting in the DC Urban Railway Substation)

  • 김한수;권오규
    • 전기학회논문지
    • /
    • 제63권11호
    • /
    • pp.1608-1614
    • /
    • 2014
  • Power demand forecasting is an important factor of the peak management. This paper deals with the 15 minutes ahead load forecasting problem in a DC urban railway system. Since supplied power lines to trains are connected with parallel, the load characteristics are too complex and highly non-linear. The main idea of the proposed method for the 15 minutes ahead prediction is to use the daily load similarity accounting for the load nonlinearity. An Euclidean norm with weighted factors including loads of the neighbor substation is used for the similar load selection. The prediction value is determinated by the sum of the similar load and the correction value. The correction has applied the neural network model. The feasibility of the proposed method is exemplified through some simulations applied to the actual load data of Incheon subway system.

345kV 의령변전소 예방진단시스템의 데이터 분석 (Data Analysis of the Preventive diagnostic system of the 345kV Eui-Ryung substations)

  • 권동진;강연욱;주병수;이옥배;이호진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 C
    • /
    • pp.1899-1902
    • /
    • 2002
  • KEPCO is planning to operate 765kV Sin-Tao-Back and Sin-Ga-Pyong substations from 2004. A preventive diagnostic system to obtain the reliability of transformer and GIS is being adopted in 765kV substations. KEPRI has developed a preventive diagnostic system for 765kV substation since 1997. The preventive diagnostic system developed in that project was installed to the 345kV Eui-Ryung substation in June, 2000, and it is under circumstance durability test and operation capacity tests. In this paper, we analyze data of the preventive diagnostic system in 345kV Eui-Ryung substation.

  • PDF

765kV 변전소 시운전에 관한 고찰 (Consideration on the trial operation of 765kV substation)

  • 변강;정시환;박근원;이상면;최만식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.29-31
    • /
    • 2002
  • Purpose of the 765kV trial operation conducted for the first time in our country are performance verification of domestic developed equipment(765kV M.Tr, GIS,etc) and extraction of problem in advance to commercial operation and cultivation of operation ability. The trial operation of 765kV substation was finished successfully under the positive supports of institutes. manufactures. and constructers. It is expected that extraction of problems in advance and accumulation of operation techniques through the trial operation of 765kV substation will be contributed largly to the realization of the without a hitch operation of 765kV system.

  • PDF

변전소 자동화 시스템의 구성 및 개발 사례 (A Structural Approach and Deployment of a Substation Automation System)

  • 유정식;이권한;최대희;최용범;이학성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.258-260
    • /
    • 2001
  • This paper describes the definition of a substation automation system and presents core components and its layered structure based on the modular approach. Also it introduces the implementation and deployment of our substation automation system which was adopted to the field recently.

  • PDF

접촉전압 저감을 위한 변전소 접지망 설계 (Design of Substation Grounding Grid for Reduction of Touch Voltage)

  • 최종기;기현찬;정길조;김범진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 E
    • /
    • pp.2352-2354
    • /
    • 1999
  • The purpose of substation grounding system is to provide reference potential with power system and protect field workers from electrical shock resulted from unsymetrical power system faults. For this purpose, grounding grid should be designed to maintain max, touch voltage under safety criteria in fault conditions. It is difficult, however, to design a safe grounding grid at very resistive or narrow area. This paper describes an example of substation grounding grid design procedures in such areas with very severe design conditions. By using grounding conductors, which is located close to earth surface, earth surface potential could be controlled effectively, so that maximum touch voltages is to be maintained under safety criteria.

  • PDF

변전소 접지설계를 위한 대지저항율 측정시 전극간격이 해석결과에 미치는 영향 (Effects of Maximum Probe Spacing of Wenner Method on Substation Grounding)

  • 최종기;기현찬;정길조;김범진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 E
    • /
    • pp.2355-2357
    • /
    • 1999
  • Estimating equivalent soil model which represents an actual soil structure and its electrical characteristics, is extremely improtant for good substation grounding system design and analysis. Since the equivalent soil model is deduced based on the measured apparent soil resistivity - generally obtained from Wenner's 4-point method, reasonable and accurate measuring technique and procedure guarantee good grounding system design and analysis. The paper aims to show the importance of reasonable enough probe spacing by presenting the influence of soil modelling to estimation and measurement of grounding resistance of substation grounding grid.

  • PDF