• Title/Summary/Keyword: submarine cable

Search Result 114, Processing Time 0.024 seconds

Increasing Effect Analysis of the Wind Power Limit Using Energy Storage System in Jeju-Korea (에너지저장장치를 이용한 제주지역 풍력발전 한계용량 증대효과 분석)

  • Kim, Yeong-Hwan;Kim, Se-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.1
    • /
    • pp.81-90
    • /
    • 2014
  • The Jeju-Korea power system is a small-sized network with a system demand ranging from a autumn minimum of 350MW to a summer peak of 716MW. Because Jeju island is well exposed to north-east winds with high speed, applications to connect to Jeju power system are flooded. Considering physical/environmental constraints, Jeju Self-governing Province has also target for the wind power capacity of 1,350MW by 2020. It amounts to two or three times of Jeju average-demand power and wind power limit capacity announced by Korea Power Exchange (KPX) company. Wind farm connection agreements will be signed to maximize utilization of wind resource. In spite of submarine cable HVDC connected to Korea mainland, Jeju power system is independently operated by frequency and reserve control. This study reevaluates wind power limit based on the KPX criteria from 2016 to 2020. First of all wind power generation limit are affected by off-peak demand in Jeju power system. Also the possibility capacity rate of charging wind power output is evaluated by using energy storage system (ESS). As a result, in case of using 110MWh ESS, wind power limit increases 33~55MW(30~50% of ESS), wind power constraint energy decreases from 68,539MWh to 50,301MWh and wind farm capacity factor increases from 25.9 to 26.1% in 2020.

Analysis of Induced Voltage on the Gas Pipeline at the Fault in a Underground Power Cables (지중전력케이블에서 고장발생시 인근 가스배관에 유도되는 전압 해석)

  • Bae J. H.;Kim D. K.;Kim K. J.
    • Journal of the Korean Institute of Gas
    • /
    • v.4 no.3 s.11
    • /
    • pp.26-32
    • /
    • 2000
  • Because of the continuous growth of energy consumption, and also the tendency to site power lines and pipelines along the same routes, the close proximity of high voltage structures and metallic pipelines has become more and more frequent. Moreover, normal steady state and fault currents become higher as electric networks increase in size and power Therefore, there has been and still is a growing concern(safety of people marking contact with pipeline, risk of damage to the pipeline coating, the metal and equipment connected to pipeline, especially cathodic protection system) about possible hazards resulting from the influence of high voltage power system on metallic structures(gas pipeline, oil pipeline and water pipeline etc.). Therefore, we analyze the interference problems when the gas pipeline is buried with power cable in the same submarine tunnel. This paper present the results of the study about interference mechanism, AC corrosion limitation of safety voltage and analysis of induction voltage.

  • PDF

Interrelationship between the Shipowner's Limitation of Liability and the Coverage of Liability Insurance: Focus on the Judgment of the Supreme Court of Canada in the Realice Case (선주의 책임제한과 책임보험의 보상 간의 상호관계: Realice호 사건에서 캐나다 대법원 판결을 중심으로)

  • Lee, Won-Jeong
    • Journal of Korea Port Economic Association
    • /
    • v.31 no.2
    • /
    • pp.41-53
    • /
    • 2015
  • In Paracomon Inc. v. Telus Communication, Realice's anchor became entangled with a working fiber-optic submarine cable during its voyage and are presentative of the shipowner(the captain) cut the cable. The owner of the cable brought a claim for the repair cost against the shipowner. The shipowner then advanced a third party claim against a liability insurance underwriter. The Supreme Court of Canada (SCC) held that the shipowner was entitled to limit its liability under the 1976 Convention on the Limitation of Liability for Maritime Claims. The SCC also ruled that even though the misdeed of the shipowner was insufficient to break its right to limitation of liability, its wrongdoing constituted willful misconduct under the 1993 Canada Marine Insurance Act, allowing the underwriter to deny coverage for the incident. Thecasewasthefirsttoaddresstheinterrelationship between the shipowner's right to limit liability under the international convention regime and the availability of liability insurance with respect to such limited liability. This study analyzes the reasoning behind the SCC's judgment and evaluates the appropriateness of this court's decision based on the current maritime industry as well as prevailing maritime law. It concludes that the SCC's decision to declare that the shipowner retained the right to limit its liability is appropriate under the Limitation Convention (1976). However, its declaration that the liability insurer was discharged from liability is not correct in due consideration of the common recognition in the maritime industry, the intended purpose of a third party's right against the liability insurer, and the adoption process of the conduct barring limitation. Based on the SCC's decision, this study finally reviews the issue of the shipowner's right to limit and the coverage of the liability insurer in the Sewol case (2014).

Application of InVEST Offshore Wind Model for Evaluation of Offshore Wind Energy Resources in Jeju Island (제주도 해상풍력 에너지 자원평가를 위한 InVEST Offshore Wind 모형 적용)

  • KIM, Tae-Yun;JANG, Seon-Ju;KIM, Choong-Ki
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.20 no.2
    • /
    • pp.47-59
    • /
    • 2017
  • This study aims to assess offshore wind energy resources around Jeju Island using the InVEST Offshore Wind model. First the wind power density around the coast of Jeju was calculated using reanalysis data from the Korean Local Analysis and Prediction System (KLAPS). Next, the net present value (NPV) for the 168MW offshore wind farm scenario was evaluated taking into consideration factors like costs (turbine development, submarine cable installation, maintenance), turbine operation efficiency, and a 20year operation period. It was determined that there are high wind resources along both the western and eastern coasts of Jeju Island, with high wind power densities of $400W/m^2$ calculated. To visually evaluate the NPV around Jeju Island, a classification of five grades was employed, and results showed that the western sea area has a high NPV, with wind power resources over $400W/m^2$. The InVEST Offshore Wind model can quickly provide optimal spatial information for various wind farm scenarios. The InVEST model can be used in combination with results of marine ecosystem service evaluation to design an efficient marine spatial plan around Jeju Island.