• Title/Summary/Keyword: structure work

Search Result 4,797, Processing Time 0.027 seconds

Development of Work Breakdown Structure for Nuclear Power Plant (원자력발전소 Work Breakdown Structure 개발)

  • Cho, Yeong-Heock;Yang, Myung-Duck
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

A Study on the formation and dissolution of tautological structure in the Frank Stella's work (프랭크 스텔라(Frank Stella)에 있어서 토톨로지 구조(Tautological Structure)의 형성과 해체)

  • Hong Ji-Suk
    • Journal of Science of Art and Design
    • /
    • v.5
    • /
    • pp.35-66
    • /
    • 2003
  • This article dealt with the formation and dissolution of tautological structure in the Frank Stella's work from 1959 to 1980 years by the analysis of signifier. A characteristic of Stella's work change is that it has the gradual progress which condensed into three periods -1) the formation and fixation period of tautological structure 2) the relaxation period of tautological structure and 3) the dissolution period of tautological structure. In other words, the early works of stella in the early 1960s has the structure which minimize differences in one hand, and maximize strictness, clearness, and identity on the other hand However, the stella's work from mid 1960s to mid 1970s extend differences gradually, while keeping a characteristic of prior work. And the stella's work after late 1970s has the decentered disintegration, namely anti-tautological structure which maximize differences. 'The formation and dissolution of tautological structure' in the Stella's work could be understood in relation to the fact that the Greenberg's modernist canon has loss the power gradually after late 1960s. That is to say, the dissolution of tautological structure in the late stella's work could be interpreted as the inevitable product which is produced in the searching for a new canon of painting. However, on the other hand, the structural change of stella's work in the late 20th Century is also understood in relation to the broader context, the social, and cultural context. Here, it is interpreted as the one of typical example which reflect a social and cultural convulsion designated as a 'Coming of Postmodernism'. In short, the late Stella's work which emphasize differences and unclearness, while diverging from early Stella's work which stress identity and rationality could be interpreted that it has the homology with the change of ways of thinking in the late 20th century Society.

  • PDF

Performance Evaluation of the Underwater Structure which used a Epoxy Panel (에폭시 섬유판넬을 이용한 수중구조물의 단면보수시스템에 대한 성능평가)

  • 박준명;홍성남;박선규
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.343-346
    • /
    • 2003
  • Confirmation of a damage degree and repair about a damage part are very hard for an underwater structure. And quality control of a construction is very complicated even if repair work is carried out on a damaged structure because repair work is carried out in water. If repair work is carried out while a defect part of the structure which there is in water keeps dry state, a efficient of repair is maximized. However, as for the repair technology about an underwater structure, a systematic researcher is not enough because of the environmental trouble. And, as for the effect about repair method to be applied to a currently underwater structure, it is not certainly proved. In this study The repair work of an underwater structure damaged applied the method that used a fiber panel form work. And a efficient of structure repaired was evaluated.

  • PDF

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

A Study of Improving Construction Process by Work Structuring (Work Structuring에 의한 시공 프로세스 개선방안에 관한 연구)

  • Na Kyung-Chul;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-427
    • /
    • 2001
  • There are many problems such as uncertainty of sequencing and irrational interdependence of processes in work breakdown structure of construction project. This study suggests work structuring for improving work reliability and transparency of processes to solve problems of work breakdown structure. Also, It proposes a process design diagram The goal of improving process design by work structuring is to make work flow more reliable and quick while delivering value to the customer. The process design diagram aims at achieving lean project objectives, such as, reduction in the share of non-value adding activities, increased transparency, process simplification and increased product flexibility.

  • PDF

Necessity of Improvements on Code of Practice at the Demolition Work considering Building Structure Type : Based on Demolition work of Permission and Registration (건축물의 구조유형을 고려한 해체공사 제도 개선 방안 필요성 - 해체공사의 허가 및 신고를 기준으로 -)

  • Shim, Yukyung;Jeong, Jaewook;Lee, Jaehyun;Jeong, Jaemin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.66-74
    • /
    • 2020
  • To prevent incident of demolition work the Building Management Act was implemented to manage demolition work. According to this law, buildings with the scale upper than 500㎡ of floor area are classified as permission to conduct the demolition work, however it may be hard to perform safety management at demolition work. In addition, the risk level of demolition work is varied with related to the structure type. So, the purpose of this study is to suggest the improvements of criteria on demolition work considering building structure types including small-scale structures such as masonry, wooden, and other structure. The research process was conducted by three steps. (I) Application of Building Management Act; (II) Analysis of demolition work by structure types; and (III) Subdivision of permission targets by building structure types. The result of this study, permission ratio was only 10% for total demolition work and 2.43% for masonry. Because the masonry, wooden, and other structure types are concentrated on a floor area of small-scale, the separate criteria of demolition work is need to prevent the accident and fatal incident. Through the results, the decision maker can be utilized (1) For the special building structure types, the criteria of enhanced safety management are applied by referring to the overseas law ; and (2) The demolition work can be considered by the criteria of separate permission in terms of structure types.

Analysis of Construction Work Breakdown Structure of Maintenance of Educational Facility (학교시설물 유지관리를 위한 공사 분류 체계 분석)

  • Ryu, Hanguk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.251-252
    • /
    • 2015
  • Enough school facility maintenance data should be accumulated in a database or data warehouse in order to supply information about school facility correct maintenance budget plan, budget assignment, and cycle and rate of maintenance or replacement. For those, this research analyze the present school facility maintenance practice and budget and construction cost structure. In order to solve the problems, this study analyze the present practice of maintenance and replacement and obtain LCC(Life cycle cost) data, perform expert interview and then establish construction work breakdown structure of maintenance of educational facility by combining work breakdown structure(WBS) and cost breakdown structure(CBS).

  • PDF

Work Domain Analysis Based on Abstraction Hierarchy: Modelling Concept and Principles for Its Application (추상화계층에 기반한 작업영역분석의 모델링 개념 및 적용 원칙)

  • Ham, Dong-Han
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.3
    • /
    • pp.133-141
    • /
    • 2013
  • As a work analysis technique, Work Domain Analysis (WDA) aims to identify the design knowledge structure of a work domain that human operators interact with through human-system interfaces. Abstraction hierarchy (AH) is a multi-level, hierarchical knowledge representation framework for modeling the functional structure of any kinds of systems. Thus, WDA based on AH aims to identify the functional knowledge structure of a work domain. AH has been used in a range of work domains and problems to model their functional knowledge structure and has proven its generality and usefulness. However, many of researchers and system designers have reported that it is never easy to understand the concepts underlying AH and use it effectively for WDA. This would be because WDA is a form of work analysis that is different from other types of work analysis techniques such as task analysis and AH has several unique characteristics that are differentiated from other types of function analysis techniques used in systems engineering. With this issue in mind, this paper introduces the concepts of WDA based on AH and offers a comprehensive list of references. Next, this paper proposes a set of principles for effectively applying AH for work domain analysis, which are developed based on the author's experiences, consultation with experts, and literature reviews.

Information Structure of Relative Clauses in English: a Flexible and Computationally Tractable Model

  • Song, Sanghoun
    • Language and Information
    • /
    • v.18 no.2
    • /
    • pp.1-29
    • /
    • 2014
  • Relativization is one of the common syntactic operations to merge two different clauses into a single information unit. This operation plays a pivotal role to structuralize multiple clauses cohesively as well as serves to specify the property an individual has within the context. That implies that relativization contributes to information structure of multiclausal sentences. In this context, this paper delves into information structure of relative clauses in English with an eye toward creation of a computational model from a standpoint of machine translation. The current work employs Head-driven Phrase Structure Grammar (HPSG, Pollard and Sag (1994)) as a theory of grammar and Minimal Recursion Semantics (MRS, Copestake et al. (2005) as a meaning representation system. Building upon these formalisms, this paper addresses how information structure of relative clauses can be represented and constrained. The current work makes use of Individual CONStraints (ICONS) for modeling relative clauses with respect to information structure. The current work also investigates which relative clause involves which information structure constraint. The present study argues that non-restrictive relative clauses impose a more specific constraint on information structure than restrictive relative clauses.

  • PDF

Analysis of Scenery Preference of the Artificial Structure in Valley within Bughansan National Park - With a Special Reference on Stream Grade-Stabilization Structure, Revetment and Drop fall Structure - (북한산국립공원 계곡 내 인공구조물에 대한 경관선호 분석 - 바닥막이, 기슭막이, 낙차공을 중심으로 -)

  • Park, Jae-Hyeon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.2
    • /
    • pp.21-32
    • /
    • 2005
  • Questionnaire survey from 101 visitors and 77 specialists was carried out to establish the management plan on landscapes of the artificial structure constructed in valley within Bughansan National Park. When comparison was made between ground sill work structure and valley landscape, visitor group responded to the highest scores in valley landscape after planting of vine species in the bottom of the constructure, while specialist group responded to valley landscape after the removal of the constructure. When it made a comparison between revetment work constructure and valley landscape, visitor group responded to highest scores in valley landscape after planting of vine species in the top of the constructure, while specialist group responded to valley landscape after replacing concrete revetment by stone revetment constructure. When it made a comparison between fall work constructure and valley landscape, both groups responded to the highest scores in valley landscape after the removal of the constructure. According to the valley landscape analysis, artificial constructures built in water channel should be matched to adjacent landscape with the removal of concrete constructure. The slope of water channel should be considered to build fall work constructure.